Aggregate planning
It may be defined as an intermediate production plan
which has a range of 2 to 18 months to give an idea
to management as to what quantity of materials and
other resources are to be procured and when, so that
the total cost of operations of the organization is kept
to the minimum over that period..
It has different approaches strategies and objectives
which will be discussed next. . . . . . . .
Definition
 There are certain inputs of aggregate planning that is
to say the factors which should be kept in mind while
planning for aggregate production;
 These are
Inputs of aggregate planning
Workforce
Facilities
Demand forecasts
Policies
Costs
Inputs of aggregate planning
 Total cost of a plan
 Projected levels of inventory
 Inventory
 Output
 Employment
 Subcontracting
 Backordering
Outputs of aggregate planning
 Proactive
 Alter demand to match capacity
 Reactive
 Alter capacity to match demand
 Mixed
 Some of each
Aggregate Planning Strategies
 In a proactive strategy a firm plans to change the
demand by means of advertisements or by means of
offering benefits for a specific product.
Proactive strategy
 A reactive planning strategy has two parts which are;
 Level strategy
 Chase strategy
Reactive strategy
 A level strategy seeks to produce an aggregate plan that
maintains a steady production rate and/or a steady
employment level. In order to satisfy changes in customer
demand, the firm must raise or lower inventory levels in
anticipation of increased or decreased levels of forecast
demand. The firm maintains a level workforce and a steady
rate of output when demand is somewhat low. This allows
the firm to establish higher inventory levels than are
currently needed. As demand increases, the firm is able to
continue a steady production rate/steady employment
level, while allowing the inventory surplus to absorb the
increased demand
Level strategy
 A chase strategy implies matching demand and capacity
period by period. This could result in a considerable
amount of hiring, firing or laying off of employees;
insecure and unhappy employees; increased inventory
carrying costs; problems with labor unions; and erratic
utilization of plant and equipment. It also implies a great
deal of flexibility on the firm's part. The major advantage
of a chase strategy is that it allows inventory to be held to
the lowest level possible, and for some firms this is a
considerable savings. Most firms embracing the just-in-
time production concept utilize a chase strategy approach
to aggregate planning.
Chase strategy
Level strategy
 ADVANTAGES
- Stable output rates and workforce
 DISADVANTAGES
 -greater inventory costs
 -increased over time and idle time
 -resource utilizations vary over time
 ADVANTAGES
 -Investment in inventory is low
 -Labor utilization in high
 DISADVANTAGES
 -The cost of fluctuating work force
 -potential damage to employee morale
Chase strategy
 Linear programming model
 Linear decision rule
 Simulation
Techniques
 Master Production Schedule
 Lists the products to be manufactured, when they should be
completed, and in what quantities
 It is the conversion of the aggregate schedule into a very
specific schedule of individual
 products
 Products listed in the master schedule generally divide into
three categories:
 1. Firm customer orders
 2. Forecasted demand
 3. Spare parts
Master production schedule
 Aggregate planning is a relatively longer term
planning that spans over a period of around 18months
on the other hand MPS is the putting of AP action i.e.
planning individual products for a shorter time span.
 Time unit for aggregate planning is one month while
the time unit for MPS is a week.
Relationship between MPS and
aggregate planning
That’s all what we have today for
you
we could have explained it in more
detail but time constraint didn’t
allow us !!!!!!!!
Credits
 This is a joint effort of
UMAR YAZDANI (D 11 IN 05)
AFSAAR ALI ( D 11 IN 27)
HANIF HAZARA (D 11 IN 39)
TAUQIR HAIDER ( D 11 IN 33)

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Quantitative and qualitative forecasting techniques om
Quantitative and qualitative forecasting techniques   omQuantitative and qualitative forecasting techniques   om
Quantitative and qualitative forecasting techniques om
 
Aggregate production planning
Aggregate production planningAggregate production planning
Aggregate production planning
 
Cycle inventory
Cycle inventoryCycle inventory
Cycle inventory
 
Work measurement
Work measurementWork measurement
Work measurement
 
types of production system
types of production systemtypes of production system
types of production system
 
Forecasting Techniques
Forecasting TechniquesForecasting Techniques
Forecasting Techniques
 
Inventory management
Inventory managementInventory management
Inventory management
 
Aggragate planning1
Aggragate planning1Aggragate planning1
Aggragate planning1
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
method study- micromotion vs memo motion
method study- micromotion vs memo motionmethod study- micromotion vs memo motion
method study- micromotion vs memo motion
 
Flow process chart
Flow process chartFlow process chart
Flow process chart
 
Forecasting
ForecastingForecasting
Forecasting
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
 
Job Design and Work Measurement
Job Design and Work Measurement Job Design and Work Measurement
Job Design and Work Measurement
 
Design of supply chain networks
Design of supply chain networksDesign of supply chain networks
Design of supply chain networks
 
Inventory Planning & Control
Inventory Planning & ControlInventory Planning & Control
Inventory Planning & Control
 

Similar a Mps vs aggregate planning

aggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdfaggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdfChunWan
 
A presentation on aggregate planning
A presentation on aggregate planningA presentation on aggregate planning
A presentation on aggregate planningAhelVitsu
 
Production planning techniques- aggregate planning
Production planning techniques- aggregate planningProduction planning techniques- aggregate planning
Production planning techniques- aggregate planningArushi Verma
 
Aggregate planning in supply chain
Aggregate planning in supply chainAggregate planning in supply chain
Aggregate planning in supply chainMoine Iqbal
 
Aggregate Planning.pptx
Aggregate Planning.pptxAggregate Planning.pptx
Aggregate Planning.pptxDr T.Sivakami
 
Sales & Operations Planning
Sales & Operations PlanningSales & Operations Planning
Sales & Operations Planningmubarak2009
 
Operations ppt
Operations pptOperations ppt
Operations pptPritam RW
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningPritam RW
 
Operations ppt
Operations pptOperations ppt
Operations pptPritam RW
 
How to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step GuideHow to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step GuideShannon Kearns
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING Aqib ali
 
Om presentation group 10 sec a
Om presentation group 10 sec aOm presentation group 10 sec a
Om presentation group 10 sec aAbhijeet Dash
 

Similar a Mps vs aggregate planning (20)

aggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdfaggregateplanningreport-121002061533-phpapp02.pdf
aggregateplanningreport-121002061533-phpapp02.pdf
 
Master planning
Master planningMaster planning
Master planning
 
A presentation on aggregate planning
A presentation on aggregate planningA presentation on aggregate planning
A presentation on aggregate planning
 
Production planning techniques- aggregate planning
Production planning techniques- aggregate planningProduction planning techniques- aggregate planning
Production planning techniques- aggregate planning
 
Aggregate planning in supply chain
Aggregate planning in supply chainAggregate planning in supply chain
Aggregate planning in supply chain
 
Capacity management
Capacity managementCapacity management
Capacity management
 
Aggregate Planning.pptx
Aggregate Planning.pptxAggregate Planning.pptx
Aggregate Planning.pptx
 
AGGREGATE PLANNING.pptx
AGGREGATE PLANNING.pptxAGGREGATE PLANNING.pptx
AGGREGATE PLANNING.pptx
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
435ch14
435ch14435ch14
435ch14
 
Session 4
Session 4Session 4
Session 4
 
Sales & Operations Planning
Sales & Operations PlanningSales & Operations Planning
Sales & Operations Planning
 
Operations ppt
Operations pptOperations ppt
Operations ppt
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Operations ppt
Operations pptOperations ppt
Operations ppt
 
Aggregate Planning
Aggregate  PlanningAggregate  Planning
Aggregate Planning
 
Mrpc final
Mrpc finalMrpc final
Mrpc final
 
How to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step GuideHow to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step Guide
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING
 
Om presentation group 10 sec a
Om presentation group 10 sec aOm presentation group 10 sec a
Om presentation group 10 sec a
 

Último

Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 

Último (20)

🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 

Mps vs aggregate planning

  • 1.
  • 4. It may be defined as an intermediate production plan which has a range of 2 to 18 months to give an idea to management as to what quantity of materials and other resources are to be procured and when, so that the total cost of operations of the organization is kept to the minimum over that period.. It has different approaches strategies and objectives which will be discussed next. . . . . . . . Definition
  • 5.  There are certain inputs of aggregate planning that is to say the factors which should be kept in mind while planning for aggregate production;  These are Inputs of aggregate planning
  • 7.  Total cost of a plan  Projected levels of inventory  Inventory  Output  Employment  Subcontracting  Backordering Outputs of aggregate planning
  • 8.  Proactive  Alter demand to match capacity  Reactive  Alter capacity to match demand  Mixed  Some of each Aggregate Planning Strategies
  • 9.  In a proactive strategy a firm plans to change the demand by means of advertisements or by means of offering benefits for a specific product. Proactive strategy
  • 10.  A reactive planning strategy has two parts which are;  Level strategy  Chase strategy Reactive strategy
  • 11.  A level strategy seeks to produce an aggregate plan that maintains a steady production rate and/or a steady employment level. In order to satisfy changes in customer demand, the firm must raise or lower inventory levels in anticipation of increased or decreased levels of forecast demand. The firm maintains a level workforce and a steady rate of output when demand is somewhat low. This allows the firm to establish higher inventory levels than are currently needed. As demand increases, the firm is able to continue a steady production rate/steady employment level, while allowing the inventory surplus to absorb the increased demand Level strategy
  • 12.
  • 13.  A chase strategy implies matching demand and capacity period by period. This could result in a considerable amount of hiring, firing or laying off of employees; insecure and unhappy employees; increased inventory carrying costs; problems with labor unions; and erratic utilization of plant and equipment. It also implies a great deal of flexibility on the firm's part. The major advantage of a chase strategy is that it allows inventory to be held to the lowest level possible, and for some firms this is a considerable savings. Most firms embracing the just-in- time production concept utilize a chase strategy approach to aggregate planning. Chase strategy
  • 14.
  • 15. Level strategy  ADVANTAGES - Stable output rates and workforce  DISADVANTAGES  -greater inventory costs  -increased over time and idle time  -resource utilizations vary over time
  • 16.  ADVANTAGES  -Investment in inventory is low  -Labor utilization in high  DISADVANTAGES  -The cost of fluctuating work force  -potential damage to employee morale Chase strategy
  • 17.  Linear programming model  Linear decision rule  Simulation Techniques
  • 18.  Master Production Schedule  Lists the products to be manufactured, when they should be completed, and in what quantities  It is the conversion of the aggregate schedule into a very specific schedule of individual  products  Products listed in the master schedule generally divide into three categories:  1. Firm customer orders  2. Forecasted demand  3. Spare parts Master production schedule
  • 19.  Aggregate planning is a relatively longer term planning that spans over a period of around 18months on the other hand MPS is the putting of AP action i.e. planning individual products for a shorter time span.  Time unit for aggregate planning is one month while the time unit for MPS is a week. Relationship between MPS and aggregate planning
  • 20. That’s all what we have today for you we could have explained it in more detail but time constraint didn’t allow us !!!!!!!!
  • 21. Credits  This is a joint effort of UMAR YAZDANI (D 11 IN 05) AFSAAR ALI ( D 11 IN 27) HANIF HAZARA (D 11 IN 39) TAUQIR HAIDER ( D 11 IN 33)