CONTENT
 DESIGN DEVELOPMENT.....3
 DESIGN STRUCTURE....4
 MATERIALS USED....5-6
 CONSTRUCTION PROCESS...7-8
 CONSTRUCTION DETAILS....9
 LOAD TESTING AND LOAD DISTRIBUTION...10-11
 GALLERY....12
 GROUP DETAILS....13
3
DESIGN DEVELOPMENT
IDEA WAS OBTAINED BY USING
A SQUARE BASE. IT MAXIMISIS
THE AREA USAGE AND FITS
INTO THE REQUIREMENT OF
0.75 X 0.75M.
IT FURTHER DEVELOPS
INTO A TRIANGULAR ROOF.
MAKING IT A COCOON LIKE
SHAPE AND TRIANGLES ARE
STRONG IN SHAPE.
SPACES ARE ADDED BY
ADDING COLLUMNS
BETWEEN THE ROOF AND
BASE.
ADD THE DIAGONAL BRACINGS
TO THE STRUCTURE FOR FIRM
SUPPORT AND SHAPE.
PLACE ROOF RAFTERS ON
THE ROOF BEAM AND
PLACE THE ROOF ON IN
4
DESIGN STRUCTURE
THE WOODEN SHELTER
DESIGN STRUCTURE ARE
CONSTRUCTED WITH 4
COLUMNS SUPPORTED
BY 3 SIDES OF
DIAGONAL BRACING TO
FORM A SHED
STRUCTURE.
THE FLOOR SLAB IS
MADE OF 6 BLOCKS OF
WOOD IN A SET OF 3-3
IN EDGE CROSS LAP
JOINT.
A PLYWOOD AS THE
ROOF RESTING ON 3
ROOF RAFTERS. THE
ROOF IS A LITTLE OVER
HANGING TO MAKE THE
STRUCTURE WHEATHER
PROOF.
ROOF
ROOF BEAM
COLUMNS
DIAGONAL BRACE
FLOOR SLAB
JOIST
5
MATERIALS USED
1. WOODEN PLANKS AND WOODEN
STICKS.
WOODEN PLANKS AND WOODEN STICKS WERE
HIGH LOAD CARRYING CAPACITY.
STRONG AND DURABLE IN ALL WEATHER.
ENVIORNMENTAL FRIENDLY.
EASY TO CONSTRUCT WITH.
HIGH FRICTION AND HIGH COMPRESSION.
LOW HEAT CONDUCTIVITY
NATURAL THERMAL INSULATION
6
MATRIAL USED
3. PLASTIC SHEET
PLASTIC SHEETS ARE USUALLY USED AS THE
BATHROOM SHOWER CURTAINS. WE ARE USING
THIS FOR THE OUTER COVER SINCE ITS WATER
PROOF.
ADVANTAGES
LIGHT AND EASY TO USE
HIGH TENSILE AND IMPACT RESISTANCE
WATER PROOF
2.PLYWOOD
PLYWOOD IS ENGINEERED WOOD PRODUCT WHICH IS
MADE BY LAYERS OF THINVENEERS OR PILES OF
SOFTWOOD OR HARDWOOD GLUED TOGETHER AT
RIGHT ANGLES WHICH IS WHAT GIVES IT ITS STRENGTH.
WE USED IT FOR OUR ROOF SINCE ITS WEATHER PROOF
AND STRONG.
ADVANTAGES.
RESISTANT TO CRACKING AND TWISTING.
HIGH LOAD CAPACITY.
WEATHER PROOF.
WATER PROOF.
7
CONSTRUCTION PROCESS
FLOOR BEAM AND
JOIST
THE FLOOR SYSTEM IS MADE
OF 6 WOODEN BLOCKS. 3 AS
JOIST AND 3 AS BEAMS.THESE
ARE JOINT BY THE CROSS LAP
JOINT. THEY FORM A WAFFLE
LIKE FORMATION.
FLOOR SLAB
THE FLOOR SLAB INCLUDES 6
WOODEN PLANKS PLACED
ON THE FLOOR JOIST. THESE
ARE NAILED TO THE BASE.
FLOOR STRUCTURE TO COLUMN
STRUCTURE.
THE COLUMNS RUN FROM THE BASE JOIST AND
BEAM STRUCTURE THROUGH THE FLOOR
SLAB.THE WOODEN STICKS WE USED ARE BOLTED
TO THE BASE AND DO NOT STAND ON GROUND
HENCE TRANSFERING ITS LOAD THROUGH THE
BASE.
8
CONSTRUCTION PROCESS
DIAGONAL BRACINGS.
THE DIAGONAL BRACINGS ARE
PLACED TO AVOID THE MOVMENT OF
THE COLUMNS AND PROVIDE
STABILTY TO THE STRUCTURE,
MOSTLY BY PREVENTING IT FROM
TWISTING. IN OUR CASE THERE ARE
DIAGONAL BRACINGS FROM 3 SIDES.
ROOF SYSTEM
AFTER THE STABILTY
AND STRENGTH IS IN
PLACE WE PLACE THE
RAFTERS FOR THE
ROOF. THESE RAFTERS
ARE PLACED ON THE
ROOF BEAMS
FOLLOWED BY THE
PLYWOOD ROOF.
FINAL PRODUCT.
AFTER THE CONSTRUCTION, THE FINAL
TOUCH IS GIVEN BY COVERING THE
STRUCTURE BY A PLASTIC SHEET TO
WEATHER PROOF IT.
9
CONSTRUCTION DETAILS-
JOINTS
Combination of
butt joint and
metered joint.
Different types
of joints used
together here so
as to make this
part stronger
since there is a
lot of wood
sticks together
Corner block used to
strengthen the
structure and prevent
it from moving/
breaking.
Rafters are joined using
the lap joint
Columns are directly
joined to the beam
using screws so as to
keep the whole
structure stable
Brace joined using screw
that will hold them
together tightly
Cross lap joint used for the base. This
joint is best for supporting the weight
of the user standing on it
10
LOAD TESTING AND LOAD
DISTRIBUTION
DEAD LOAD:
REFERS TO THE LOAD THAT DONT CHANGE OVER
TIME, SUCH AS THE WEIGHT OF THE MATERIALS
AND COMPONENTES OF THE STRUCTURE. THE
LOAD OF THE SHELTER IS TRASFERRED FROM THE
ROOF TO THE COLOUMN AND THEN TO THE BASE.
LIVE LOAD :
REFERS TO THE LOAD THAT CHANGES OVER
TIME, SUCH AS PEOPLE WALKING AROUND OR
MOVEABLE OBJECTS. WHEN THERE IS A LIVE
LOAD ON THE SHELTER THE DISTRIBUTION OF
THE LOAD INCREASES. THE LOAD OF THE LIVE
LOAD IS TRANSFERRED EVENLY FROM THE
FLOOR SLAB TO THE GROUND.
LOAD TESTING
11
Different human weight used to test the base
12
GALLERY
13
GROUP DETAILS
▐ SAURABHA LAKSHAMAN KUMAR IYER 0320569
▐ MUHAMMAD MUBARAK 0319984
▐ MUHAMMAD NABEEL ALI JOOMUN 0320583
▐ JONATHAN EDWARD WOE 0320458
▐ SARAVANAN VYTELINGUM 0320564
▐ NICHOLAS LEE NGANG KIM 0320504

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Load bearing vs frame structure(case study)
Load bearing vs frame structure(case study)Load bearing vs frame structure(case study)
Load bearing vs frame structure(case study)
 
Types of Brick Bonding
Types of Brick BondingTypes of Brick Bonding
Types of Brick Bonding
 
Types of structures
Types of structuresTypes of structures
Types of structures
 
1EBil - Structures - Presentation, tacoma bridge
1EBil - Structures - Presentation, tacoma bridge1EBil - Structures - Presentation, tacoma bridge
1EBil - Structures - Presentation, tacoma bridge
 
Building construction 1
Building construction 1Building construction 1
Building construction 1
 
Classification of retaining wall
Classification of retaining wallClassification of retaining wall
Classification of retaining wall
 
Chapter 7 DESIGN OF FOOTING
Chapter 7 DESIGN OF FOOTINGChapter 7 DESIGN OF FOOTING
Chapter 7 DESIGN OF FOOTING
 
Brickwork Bonding (basics)
Brickwork Bonding (basics)Brickwork Bonding (basics)
Brickwork Bonding (basics)
 
BUILDING CONSTRUCTION Presentation
BUILDING CONSTRUCTION PresentationBUILDING CONSTRUCTION Presentation
BUILDING CONSTRUCTION Presentation
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 
structures
structuresstructures
structures
 
Brick Masonry and Stone Masonry
Brick Masonry and Stone MasonryBrick Masonry and Stone Masonry
Brick Masonry and Stone Masonry
 
Brick masonry
Brick masonryBrick masonry
Brick masonry
 
Foundation
FoundationFoundation
Foundation
 
4. concrete and building block
4. concrete and building block4. concrete and building block
4. concrete and building block
 
Foundation.pptmahesh
Foundation.pptmaheshFoundation.pptmahesh
Foundation.pptmahesh
 
Types of foundation
Types of foundationTypes of foundation
Types of foundation
 
Design of footing as per IS 456-2000
Design of footing as per IS 456-2000Design of footing as per IS 456-2000
Design of footing as per IS 456-2000
 
Footing design(09.02.03.096)
Footing design(09.02.03.096)Footing design(09.02.03.096)
Footing design(09.02.03.096)
 
1 e bil - structures - 2nd part - types of structures
1 e bil - structures - 2nd part - types of structures1 e bil - structures - 2nd part - types of structures
1 e bil - structures - 2nd part - types of structures
 

Destacado

Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1Nabeel Joomun
 
Building construction pdf
Building construction pdfBuilding construction pdf
Building construction pdfdezyneecole
 
Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1 Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1 Dexter Ng
 
Building construction ppt
Building construction pptBuilding construction ppt
Building construction pptgyan singh
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 
Building construction
Building constructionBuilding construction
Building constructionLlyod cassidy
 
Summer internship report L&T
Summer internship report L&TSummer internship report L&T
Summer internship report L&TUmed Paliwal
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building ConstructionEsmael Aragaw
 
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Alok Mishra
 

Destacado (9)

Building Construction 1: project 1
Building Construction 1: project 1Building Construction 1: project 1
Building Construction 1: project 1
 
Building construction pdf
Building construction pdfBuilding construction pdf
Building construction pdf
 
Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1 Final BUILDING CONSTRUCTION 1
Final BUILDING CONSTRUCTION 1
 
Building construction ppt
Building construction pptBuilding construction ppt
Building construction ppt
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
Building construction
Building constructionBuilding construction
Building construction
 
Summer internship report L&T
Summer internship report L&TSummer internship report L&T
Summer internship report L&T
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
 
Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD Industrial Summer Training Report at Construction Site of CPWD
Industrial Summer Training Report at Construction Site of CPWD
 

Similar a Building Construction 2

318466378 bcon-report-final-low-quality
318466378 bcon-report-final-low-quality318466378 bcon-report-final-low-quality
318466378 bcon-report-final-low-qualitySchani B
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportForestedTiger
 
Building Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportBuilding Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportJoyeeLee0131
 
building construction project 1 report
building construction project 1 reportbuilding construction project 1 report
building construction project 1 reportYq Chong
 
Building Construction 2
Building Construction 2 Building Construction 2
Building Construction 2 leejanicee
 
Btech compile 6 oct 4am
Btech compile 6 oct 4amBtech compile 6 oct 4am
Btech compile 6 oct 4amCeline Tan
 
Ct assignment (2)
Ct assignment (2)Ct assignment (2)
Ct assignment (2)Shane Ah
 
Construction Technology Report
Construction Technology ReportConstruction Technology Report
Construction Technology ReportShao Xun Sean Thun
 
Project 2 Construction Solutions GYN
Project 2 Construction Solutions GYNProject 2 Construction Solutions GYN
Project 2 Construction Solutions GYNCrysmond Goh
 
Analysis of Truss Structure
Analysis of Truss StructureAnalysis of Truss Structure
Analysis of Truss StructureHaiqal Ehlam
 
Bcon report bus shelter
Bcon report   bus shelterBcon report   bus shelter
Bcon report bus shelterYung Kai
 

Similar a Building Construction 2 (20)

318466378 bcon-report-final-low-quality
318466378 bcon-report-final-low-quality318466378 bcon-report-final-low-quality
318466378 bcon-report-final-low-quality
 
Bcon Report 1
Bcon Report 1Bcon Report 1
Bcon Report 1
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
 
Building Construction Project 1 Shelter Report
Building Construction Project 1 Shelter ReportBuilding Construction Project 1 Shelter Report
Building Construction Project 1 Shelter Report
 
building construction project 1 report
building construction project 1 reportbuilding construction project 1 report
building construction project 1 report
 
Building Construction 2
Building Construction 2 Building Construction 2
Building Construction 2
 
Btech compile 6 oct 4am
Btech compile 6 oct 4amBtech compile 6 oct 4am
Btech compile 6 oct 4am
 
BCON PROJ 1
BCON PROJ 1BCON PROJ 1
BCON PROJ 1
 
Ct assignment (2)
Ct assignment (2)Ct assignment (2)
Ct assignment (2)
 
Ct assignment
Ct assignmentCt assignment
Ct assignment
 
Construction Technology Report
Construction Technology ReportConstruction Technology Report
Construction Technology Report
 
Ct assignment
Ct assignmentCt assignment
Ct assignment
 
strawbale
strawbalestrawbale
strawbale
 
Surface active systems
Surface active systems Surface active systems
Surface active systems
 
Shell structure.pdf
Shell structure.pdfShell structure.pdf
Shell structure.pdf
 
Shell structure
Shell structureShell structure
Shell structure
 
Merged
MergedMerged
Merged
 
Project 2 Construction Solutions GYN
Project 2 Construction Solutions GYNProject 2 Construction Solutions GYN
Project 2 Construction Solutions GYN
 
Analysis of Truss Structure
Analysis of Truss StructureAnalysis of Truss Structure
Analysis of Truss Structure
 
Bcon report bus shelter
Bcon report   bus shelterBcon report   bus shelter
Bcon report bus shelter
 

Último

Substation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHSubstation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHbirinder2
 
AntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxAntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxLina Kadam
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptNoman khan
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labsamber724300
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...KrishnaveniKrishnara1
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunicationnovrain7111
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfShreyas Pandit
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProRay Yuan Liu
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 

Último (20)

Substation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHSubstation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRH
 
AntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxAntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptx
 
ASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductosASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductos
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).ppt
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labs
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunication
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdf
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision Pro
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 

Building Construction 2

  • 1. 1 BUILDING CONSTRUCTION- 2 SEMESTER 3, PROJECT 1- SKELETAL CONSTRUCTION “A SHELTER FOR ONE”
  • 2. 2 CONTENT  DESIGN DEVELOPMENT.....3  DESIGN STRUCTURE....4  MATERIALS USED....5-6  CONSTRUCTION PROCESS...7-8  CONSTRUCTION DETAILS....9  LOAD TESTING AND LOAD DISTRIBUTION...10-11  GALLERY....12  GROUP DETAILS....13
  • 3. 3 DESIGN DEVELOPMENT IDEA WAS OBTAINED BY USING A SQUARE BASE. IT MAXIMISIS THE AREA USAGE AND FITS INTO THE REQUIREMENT OF 0.75 X 0.75M. IT FURTHER DEVELOPS INTO A TRIANGULAR ROOF. MAKING IT A COCOON LIKE SHAPE AND TRIANGLES ARE STRONG IN SHAPE. SPACES ARE ADDED BY ADDING COLLUMNS BETWEEN THE ROOF AND BASE. ADD THE DIAGONAL BRACINGS TO THE STRUCTURE FOR FIRM SUPPORT AND SHAPE. PLACE ROOF RAFTERS ON THE ROOF BEAM AND PLACE THE ROOF ON IN
  • 4. 4 DESIGN STRUCTURE THE WOODEN SHELTER DESIGN STRUCTURE ARE CONSTRUCTED WITH 4 COLUMNS SUPPORTED BY 3 SIDES OF DIAGONAL BRACING TO FORM A SHED STRUCTURE. THE FLOOR SLAB IS MADE OF 6 BLOCKS OF WOOD IN A SET OF 3-3 IN EDGE CROSS LAP JOINT. A PLYWOOD AS THE ROOF RESTING ON 3 ROOF RAFTERS. THE ROOF IS A LITTLE OVER HANGING TO MAKE THE STRUCTURE WHEATHER PROOF. ROOF ROOF BEAM COLUMNS DIAGONAL BRACE FLOOR SLAB JOIST
  • 5. 5 MATERIALS USED 1. WOODEN PLANKS AND WOODEN STICKS. WOODEN PLANKS AND WOODEN STICKS WERE HIGH LOAD CARRYING CAPACITY. STRONG AND DURABLE IN ALL WEATHER. ENVIORNMENTAL FRIENDLY. EASY TO CONSTRUCT WITH. HIGH FRICTION AND HIGH COMPRESSION. LOW HEAT CONDUCTIVITY NATURAL THERMAL INSULATION
  • 6. 6 MATRIAL USED 3. PLASTIC SHEET PLASTIC SHEETS ARE USUALLY USED AS THE BATHROOM SHOWER CURTAINS. WE ARE USING THIS FOR THE OUTER COVER SINCE ITS WATER PROOF. ADVANTAGES LIGHT AND EASY TO USE HIGH TENSILE AND IMPACT RESISTANCE WATER PROOF 2.PLYWOOD PLYWOOD IS ENGINEERED WOOD PRODUCT WHICH IS MADE BY LAYERS OF THINVENEERS OR PILES OF SOFTWOOD OR HARDWOOD GLUED TOGETHER AT RIGHT ANGLES WHICH IS WHAT GIVES IT ITS STRENGTH. WE USED IT FOR OUR ROOF SINCE ITS WEATHER PROOF AND STRONG. ADVANTAGES. RESISTANT TO CRACKING AND TWISTING. HIGH LOAD CAPACITY. WEATHER PROOF. WATER PROOF.
  • 7. 7 CONSTRUCTION PROCESS FLOOR BEAM AND JOIST THE FLOOR SYSTEM IS MADE OF 6 WOODEN BLOCKS. 3 AS JOIST AND 3 AS BEAMS.THESE ARE JOINT BY THE CROSS LAP JOINT. THEY FORM A WAFFLE LIKE FORMATION. FLOOR SLAB THE FLOOR SLAB INCLUDES 6 WOODEN PLANKS PLACED ON THE FLOOR JOIST. THESE ARE NAILED TO THE BASE. FLOOR STRUCTURE TO COLUMN STRUCTURE. THE COLUMNS RUN FROM THE BASE JOIST AND BEAM STRUCTURE THROUGH THE FLOOR SLAB.THE WOODEN STICKS WE USED ARE BOLTED TO THE BASE AND DO NOT STAND ON GROUND HENCE TRANSFERING ITS LOAD THROUGH THE BASE.
  • 8. 8 CONSTRUCTION PROCESS DIAGONAL BRACINGS. THE DIAGONAL BRACINGS ARE PLACED TO AVOID THE MOVMENT OF THE COLUMNS AND PROVIDE STABILTY TO THE STRUCTURE, MOSTLY BY PREVENTING IT FROM TWISTING. IN OUR CASE THERE ARE DIAGONAL BRACINGS FROM 3 SIDES. ROOF SYSTEM AFTER THE STABILTY AND STRENGTH IS IN PLACE WE PLACE THE RAFTERS FOR THE ROOF. THESE RAFTERS ARE PLACED ON THE ROOF BEAMS FOLLOWED BY THE PLYWOOD ROOF. FINAL PRODUCT. AFTER THE CONSTRUCTION, THE FINAL TOUCH IS GIVEN BY COVERING THE STRUCTURE BY A PLASTIC SHEET TO WEATHER PROOF IT.
  • 9. 9 CONSTRUCTION DETAILS- JOINTS Combination of butt joint and metered joint. Different types of joints used together here so as to make this part stronger since there is a lot of wood sticks together Corner block used to strengthen the structure and prevent it from moving/ breaking. Rafters are joined using the lap joint Columns are directly joined to the beam using screws so as to keep the whole structure stable Brace joined using screw that will hold them together tightly Cross lap joint used for the base. This joint is best for supporting the weight of the user standing on it
  • 10. 10 LOAD TESTING AND LOAD DISTRIBUTION DEAD LOAD: REFERS TO THE LOAD THAT DONT CHANGE OVER TIME, SUCH AS THE WEIGHT OF THE MATERIALS AND COMPONENTES OF THE STRUCTURE. THE LOAD OF THE SHELTER IS TRASFERRED FROM THE ROOF TO THE COLOUMN AND THEN TO THE BASE. LIVE LOAD : REFERS TO THE LOAD THAT CHANGES OVER TIME, SUCH AS PEOPLE WALKING AROUND OR MOVEABLE OBJECTS. WHEN THERE IS A LIVE LOAD ON THE SHELTER THE DISTRIBUTION OF THE LOAD INCREASES. THE LOAD OF THE LIVE LOAD IS TRANSFERRED EVENLY FROM THE FLOOR SLAB TO THE GROUND.
  • 11. LOAD TESTING 11 Different human weight used to test the base