Chris Taylor 2012

          5s 5s
Charter name: 5s   5s
Kaizen Charter Form
                   Kaizen Name:                5s    5s

            Process Name:     Consolidation of 5s procedure
            Start Point:      Operations departments
Scope


            End Point:
            Does VSM Exist?           N/A                 VSM Owner or Exec. Sponsor:                                              N/A
            Value Stream Name:        N/A


            Charter Author:                Chris Taylor                               Champion:               Chris Taylor
Leaders




            Date Created:                  3/27/2012                                  Team Leader:            Chris Taylor
            Current Revision:              Rev A                                      Facilitator:            Chris Taylor


                                           Current 5s procedure is outdated & specific to Production department. Actual 5s audits occur in 3
                                           areas within Timbercon, 2 of which are outside of Production department. Lean principles apply to
                  Problem Statement:                                   all functioning areas within a organization.
Strategy




                           Corporate strategy / goals improved by this kaizen                                             Notes
              1 To provide a system to ensure adherence with Lean Manufacturing principles
              2        Simplify a 5s process usable by all Timbercon departments

                                  Kaizen Summary                                         Key Deliverables (in order of importance)
Overview




                  Review of processes and documentation and current          1 Rewrite of current documentation
                                      practices                              2 Simplified Worksheet for audits
                                                                             3 Visual charts for departmental results
                                                                             4

                    QDCSM                                 Metric                                 Units          Current       Goal            %Δ
              1
Metrics




              2
              3
              4
              5

                                 Name                        Job Title                                       Training Needs
             1    Chris Taylor                         Production Manager
             2    Cesar Flores                       Production Supervisor
             3    Adam Brown                         Production Supervisor                  Review of new 5s Audit Checklist Form
             4    John Talbot                          Materials Manager
                                                                                        Special Equipment / Materials                Date Arranged
             5    Ed H                                    Quality Manager
             6    Bryan Kinish                                Buyer               1                      N/A
Resources




             7                                                                    2
             8                                                                    3
             9                                                                    4
            10                                                                    5
                        Resource Team                     On-Call Dates                                        Schedule
              1 John Talbot                                As needed            Duration (Days):                                     ~67
              2 Ed H                                       As needed            Start Date:                                       3/27/2012
              3 Bryan Kinish                               As needed            End Date:                                         5/30/2012
              4                                                                 Daily Start Time:
              5                                                                 Report Out Date / Time:
www.Vel a cti on.com                       © Copyri ght 2010 by Vel a cti on Conti nuous Improvement, LLC.                Attachments?
5s 5s: Scope & Strategy
 Review and simplification of our 5s procedure
 Operational areas within Timbercon facility
 Problem statement:
    Current 5s procedure is outdated, narrow in scope, and
     specific to the Production department.
    3 areas w/ differing schedules:
        Production
        Materials warehouse
        Shop
 Goals:
   Provide system to ensure adherence to Lean Mfg Principles
   Simplify 5s process for use by all departments
Charter Team:
 Charter beginning - 1/24/12 Discussion w/ operators
 Charter Leader/Champion: Chris Taylor

 Team members:
   Cesar Flores, Production Supervisor
   Adam Brown, Production Supervisor

 Team resources:
       John Talbot, Materials Manager
       Ed Holz, Quality Manager
       Bryan Kinish, Buyer
       Tracy Slate, Supervisor Materials & Shipping
Current State:
 Procedure
 Worksheets
 Schedules
PWI - 103 PRO DUCT IO N 5’S & RED T AG PRO GRAM

                         1.0 Purpose:




Procedure:               To provide a system and instructions to ensure adherence with the Lean Manufacturing Principles.

                         2.0 Scope:

                         This procedure applies to all production employees and Leads are responsible for assuring their lines compliance &
                         auditing. The Production Manager is responsibility for the overall program. All new employees will receive 5’S

• Current document       training.

                         3.0 Reference Documents:

is Rev. A, 12/3/07,      QF – 109          5’S Audit Worksheet

                         4.0 Definitions

creation and release.    5S                A method for removing all excess materials and tools from the workplace and organizing the
                                           required items (using Visual Controls) such that they are easy to find, use and maintain this,
                                           creates a self-sustaining culture which perpetuates a neat, clean, efficient workplace.

                         Red Tag           A method of identifying and removing all unneeded workplaces items by using a Red Tag visual
                                           management system, The Red tag process also takes into account the need to identify the proper

• No reference of                          locations for items that are used in the workplace and it includes organizing them so that they are
                                           easy to find and use through the application of visual controls.

                         5.0 Procedure:

 2 other worksheets              5.1 All production personnel are trained in 5’S.
                                 5.2 5S audits are performed on a weekly basic by the designated Team Leads.
                                 5.3 Each team has a determined Cleaning Standard and Schedule identifying the daily expectations and
                                     each individual assigned task.
                                 5.4 Each team member is encouraged and expected to participate in 5S Kazien events. All production
                                     personnel are expected to be incompliance with their 5’S Cleaning Standards requirements.

• Yellow highlights indicate     5.5 On a predetermined weekly audit date the Team Leads is responsible for scoring their line. (Ref.
                                     QF109)
                                 5.6 Immediately after each weekly team audit, a follow up audit is conducted by the Production Manager.
                                     Audit includes maintaining the accuracy and consistency of the scoring system for each team.
production specific              5.7 Weekly and monthly team audit results are posted on the Production Board.
                                 5.8 As each team is conducting the 5S Kazien event a Red Tagging process is implemented. As teams
                                     identify unneeded items in the workplace, they are identified with a Red Tag and relocated to a

references                           designated location.
                                 5.9 Any red tag item issued to production is monitored by a designated Lead/Engineering Tech.
                                 5.10Any unused red tagged items stored in the red tag holding area for more than 3-months will be
                                 reviewed by Engineering and the Production Manager for disposition.
Worksheets:
    • 3 versions 5s Audit Sheet                                                                                          QF207 5s SHOP AUDIT SHEET5S SH O P AU DIT SH EE
                                                                                                                                               Q F207
                                                                 Machine Shop:
                                                                 Scored By:  QF205 5s AUDIT SHEET (MATERIALS)
                                                                 Date:                                                              Q F205 5S AUDIT SH EET (MAT ERIALS)
                           Work Cell:                            5S Categories                                                     Work Cell Score           Location/Comments
                           Scored By:
                                QF109            5s AUDIT SHEET                                                          Q F109 5S AUDIT SH EET
                           Date:                                 SORT: Distinguish Between what is needed and not needed.
Work Cell:
                           5S Categories                         No Unneeded equipment, tools, furniture, etc. Cellpresent……...…………
                                                                                                      Work are Score                 0 1 Location/Comments
                                                                                                                                          2 3 4 5
Scored By:
Date:
5S Categories              SORT: Distinguish Between what is needed and notbulletin board, etc………...……………………
                                                   No Unneeded items are on walls, needed.
                                                         Work Cell Score                   Location/Comments
                                                                                                                                     0 1 2 3 4 5

                           Unneeded equipment, tools, furniture, etc. are present……...…………      0 1 2 3 4 5
                                                          Items are present in aisle ways, stairway, corners, behind machines ……. 0 1 2 3 4 5
SORT: Distinguish Between what is needed and not needed.
                           Unneeded items are on walls, bulletin board, etc………...……………………         0 1 2 3 4 5
Unneeded equipment, tools, furniture, etc. are present……...…………Unneeded2 3 4 5 supplies, parts, or materials are present………
                                                             No   0 1 inventory,                                                     0 1 2 3 4 5

                            Items are present in aisle ways, stairway, corners, behind machines 0 1 2 3 4 5
                                                           SET
Unneeded items are on walls, bulletin board, etc………...……………………      TO 1ORDER: Organizing for ease of use, straightening up and putting things away.
                                                                     0      2 3 4 5
                                                              Everything is stored in a marked location …….………………………………………… 0 1 2 3 4 5
                            Unneeded inventory, supplies, parts, or materials are present………
Items are present in aisle ways, stairway, corners, behind machines 0 1 2 3 4 5
                                                                                                    0 1 2 3 4 5

                                                             Items are placed in an orderly manner...………………………………………………….. 0 1 2 3 4 5
Unneeded inventory, supplies, parts, or materials are present……… for ease of 4 5 straightening up and putting things away.
                           SET TO ORDER: Organizing                 0 1 2 3 use,
                           Everything is stored in a markedAisle ways, workstations, equipment locations are indicated……………….
                                                            location …….……………………………………           0 1 2 3 4 5                         0 1 2 3 4 5
SET TO ORDER: Organizing for ease of use, straightening up and putting things away.
                            Items are placed in an orderly manner...……………………………………………..
Everything is stored in a marked location …….…………………………………… Material locations and required quantities 1 2 indicated……………………….
                                                                    0 1 2 3 4 5                    0 are 3 4 5                       0 1 2 3 4 5
                                                           consumable location. Check shelf life material expiration dates.
Items are placed in an orderly manner...…………………………………………….. locations are3 4 5
                           Aisle ways, workstations, equipment    0 1 2 indicated………….           0 1 2 3 4 5
                                                             Designated equipments turned” Off” unless otherwise noted………………         0 1 2 3 4 5
Aisle ways, workstations, equipment locations are indicated………….
                            Material locations and required quantities are 2 3 4 5
                                                                     0 1 indicated…………………        0 1 2 3 4 5
                           consumable location.                  SHINE: Sweeping, scrubbing and cleaning and keeping things that way.
Material locations and required quantities are indicated…………………      0 1 2 3 4 5
                            Items 10 seconds away……………………………………………………………………………… of0 1 oil and grease…………………..
                                                             Floors, walls, and surfaces are free   dirt 2 3 4 5                    0   1 2 3 4 5
consumable location. Check shelf life material expiration dates.
Items 10 seconds away……………………………………………………………………………… ………………………………….……………..
                            Designated equipments turned” Off”       0 1 2 3 4 5
                                                             Equipment is kept clean and free of dirt, oil, 2 3water...………………………
                                                                                                   0 1 and 4 5                       0 1 2 3 4 5
                           SHINE: Sweeping, scrubbing and cleaning and keeping things that way.
Designated equipments turned” Off” ………………………………….……………..               0 1 2 3 4 5
                           Floors, walls, and surfaces are not free of dirt oil and grease………     0   1 2 3 4 5
SHINE: Sweeping, scrubbing and cleaning and keeping things that way.
Floors, walls, and surfaces are free of dirt oil and grease……… 0 1 2 3 4 5
                           Equipment is kept clean and free of dirt, oil, and water...…………………    0 1 2 3 4 5
Equipment is kept clean and free of dirt, oil, and water...…………………     0 1 2 3 4 5
Schedules:
• 3 differing timelines
  • Weekly - Procedure
    • Production
    • Sustaining this has been difficult- drop at end of year
  • Bi-weekly-Monthly
    • Materials schedule not documented
  • Monthly
    • Shop schedule not documented
    • Not always
Waste per month:
• 2 pages per audit or 38 pages per month
   • Production –16(weekly)
   • Materials – 2(bi-monthly)
   • Shop – 1(monthly)


• Inconsistencies with schedule             Walking Distance
   • Extra processing                             135 ft
   • Overproduction/underproduction                78 ft
   • Motion                                       135 ft
                                                = 348 ft
• 6 operators involved w/ audits
• 15-20 minutes per audit or 6.33 hours monthly = $120.00
Problems solving tools
• Team discussion started on March 27

• Increase the urgency to make necessary changes

• Build team to make this happen

• Create the vision and get the buy-in

• Empower action and create short term wins
Charter in motion
 Review documentation for revision

 Create new format for checklist

 Create new chart for visual results

 Identify locations for results to be posted
Documentation
review
Audit
Checklist
5s Audit results
summary
5s Audit
results
summary
Kaizen Results
Copy of lla – capstone project 5s

More Related Content

What's hot

Grammier.richard
Grammier.richardGrammier.richard
Grammier.richardNASAPMC
 
IIE Call For Paper
IIE Call For PaperIIE Call For Paper
IIE Call For Papermdmilward
 
Process Certification Implementation Presentation
Process Certification Implementation PresentationProcess Certification Implementation Presentation
Process Certification Implementation Presentationmdmilward
 
Illustrated(イラスト)
Illustrated(イラスト)Illustrated(イラスト)
Illustrated(イラスト)Yoneto Yasuhiko
 
Capstone Senior Design Projects Comprehensive
Capstone Senior Design Projects ComprehensiveCapstone Senior Design Projects Comprehensive
Capstone Senior Design Projects ComprehensiveJean Koster
 

What's hot (6)

Grammier.richard
Grammier.richardGrammier.richard
Grammier.richard
 
IIE Call For Paper
IIE Call For PaperIIE Call For Paper
IIE Call For Paper
 
Baf Specification
Baf SpecificationBaf Specification
Baf Specification
 
Process Certification Implementation Presentation
Process Certification Implementation PresentationProcess Certification Implementation Presentation
Process Certification Implementation Presentation
 
Illustrated(イラスト)
Illustrated(イラスト)Illustrated(イラスト)
Illustrated(イラスト)
 
Capstone Senior Design Projects Comprehensive
Capstone Senior Design Projects ComprehensiveCapstone Senior Design Projects Comprehensive
Capstone Senior Design Projects Comprehensive
 

Viewers also liked

5S Implementation Presentation
5S Implementation Presentation 5S Implementation Presentation
5S Implementation Presentation Pranav B. Gujjar
 
5-S audit check sheet with scoring, presented at BSTQM
5-S audit check sheet with scoring, presented at BSTQM5-S audit check sheet with scoring, presented at BSTQM
5-S audit check sheet with scoring, presented at BSTQMEngr. Abdun Noor
 
5S: Awareness & Implementation
5S: Awareness & Implementation5S: Awareness & Implementation
5S: Awareness & ImplementationMira Anuar
 
5 S ~ implementation presentation
5 S ~ implementation presentation5 S ~ implementation presentation
5 S ~ implementation presentationClive Sury
 
Lean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training ModuleLean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training ModuleFrank-G. Adler
 
5S - A step-by-step approach to implement 5S at your workplace
5S - A step-by-step approach to implement 5S at your workplace5S - A step-by-step approach to implement 5S at your workplace
5S - A step-by-step approach to implement 5S at your workplaceAnanth Palaniappan
 
5 S Presentation Basic Training
5 S Presentation   Basic Training5 S Presentation   Basic Training
5 S Presentation Basic Trainingflevko
 
5 s powerpoint presentation
5 s powerpoint presentation5 s powerpoint presentation
5 s powerpoint presentationmarigold-cherie
 

Viewers also liked (10)

5 s program
5 s program5 s program
5 s program
 
5S Implementation Presentation
5S Implementation Presentation 5S Implementation Presentation
5S Implementation Presentation
 
5-S audit check sheet with scoring, presented at BSTQM
5-S audit check sheet with scoring, presented at BSTQM5-S audit check sheet with scoring, presented at BSTQM
5-S audit check sheet with scoring, presented at BSTQM
 
5S: Awareness & Implementation
5S: Awareness & Implementation5S: Awareness & Implementation
5S: Awareness & Implementation
 
5 S ~ implementation presentation
5 S ~ implementation presentation5 S ~ implementation presentation
5 S ~ implementation presentation
 
5S Auditing Sheet
5S Auditing Sheet5S Auditing Sheet
5S Auditing Sheet
 
Lean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training ModuleLean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training Module
 
5S - A step-by-step approach to implement 5S at your workplace
5S - A step-by-step approach to implement 5S at your workplace5S - A step-by-step approach to implement 5S at your workplace
5S - A step-by-step approach to implement 5S at your workplace
 
5 S Presentation Basic Training
5 S Presentation   Basic Training5 S Presentation   Basic Training
5 S Presentation Basic Training
 
5 s powerpoint presentation
5 s powerpoint presentation5 s powerpoint presentation
5 s powerpoint presentation
 

Similar to Copy of lla – capstone project 5s

Howe Street Basic Project Approach
Howe Street Basic Project ApproachHowe Street Basic Project Approach
Howe Street Basic Project ApproachJasonLhota1
 
Lean Business Intelligence: Achieve Better, Faster, Cheaper Business Intellig...
Lean Business Intelligence: Achieve Better, Faster, Cheaper Business Intellig...Lean Business Intelligence: Achieve Better, Faster, Cheaper Business Intellig...
Lean Business Intelligence: Achieve Better, Faster, Cheaper Business Intellig...Kurt Solarte
 
Project Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptxProject Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptxKareemBullard1
 
Process improvement without technology investments?
Process improvement without technology investments?Process improvement without technology investments?
Process improvement without technology investments?sharedserviceslink.com
 
Feasibility Study Linda Doll
Feasibility Study Linda DollFeasibility Study Linda Doll
Feasibility Study Linda DollLinda Doll
 
Week 5: Handout chris piccin lean - 040117 - day 2
Week 5: Handout   chris piccin   lean - 040117 - day 2Week 5: Handout   chris piccin   lean - 040117 - day 2
Week 5: Handout chris piccin lean - 040117 - day 2Talou Diallo
 
PMINEO_2012_03_OPM3_Organizational_PM_Maturity
PMINEO_2012_03_OPM3_Organizational_PM_MaturityPMINEO_2012_03_OPM3_Organizational_PM_Maturity
PMINEO_2012_03_OPM3_Organizational_PM_MaturityBob Zoller
 
Achieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationAchieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationApril Bright
 
Cmmi agile kulpa 2004meas cmmi[1]
Cmmi  agile kulpa 2004meas cmmi[1]Cmmi  agile kulpa 2004meas cmmi[1]
Cmmi agile kulpa 2004meas cmmi[1]JULIO GONZALEZ SANZ
 
Tqm indian auto component questionnaire
Tqm indian auto component questionnaireTqm indian auto component questionnaire
Tqm indian auto component questionnaireSatyendra Patel
 
Lean pilots by Mariya Breyter from Dun & Bradstreet
Lean pilots by Mariya Breyter from Dun & BradstreetLean pilots by Mariya Breyter from Dun & Bradstreet
Lean pilots by Mariya Breyter from Dun & BradstreetInstitut Lean France
 
A folder sysem for uks 2008 2011
A folder sysem for uks 2008   2011A folder sysem for uks 2008   2011
A folder sysem for uks 2008 2011Clive Burgess
 
Sourcin IQPC Munich 2014
Sourcin IQPC Munich 2014 Sourcin IQPC Munich 2014
Sourcin IQPC Munich 2014 Sourcin1
 
Pmbok 6th edition_practice_questions
Pmbok 6th edition_practice_questionsPmbok 6th edition_practice_questions
Pmbok 6th edition_practice_questionsOlgaZelenina2
 
Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"
Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"
Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"Fwdays
 

Similar to Copy of lla – capstone project 5s (20)

Howe Street Basic Project Approach
Howe Street Basic Project ApproachHowe Street Basic Project Approach
Howe Street Basic Project Approach
 
Lean Business Intelligence: Achieve Better, Faster, Cheaper Business Intellig...
Lean Business Intelligence: Achieve Better, Faster, Cheaper Business Intellig...Lean Business Intelligence: Achieve Better, Faster, Cheaper Business Intellig...
Lean Business Intelligence: Achieve Better, Faster, Cheaper Business Intellig...
 
Itil process framework__rowe(40)
Itil process framework__rowe(40)Itil process framework__rowe(40)
Itil process framework__rowe(40)
 
Project Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptxProject Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptx
 
Process improvement without technology investments?
Process improvement without technology investments?Process improvement without technology investments?
Process improvement without technology investments?
 
Feasibility Study Linda Doll
Feasibility Study Linda DollFeasibility Study Linda Doll
Feasibility Study Linda Doll
 
Week 5: Handout chris piccin lean - 040117 - day 2
Week 5: Handout   chris piccin   lean - 040117 - day 2Week 5: Handout   chris piccin   lean - 040117 - day 2
Week 5: Handout chris piccin lean - 040117 - day 2
 
Week 05_Handout day 2
Week 05_Handout  day 2Week 05_Handout  day 2
Week 05_Handout day 2
 
Scope Management
Scope ManagementScope Management
Scope Management
 
PMINEO_2012_03_OPM3_Organizational_PM_Maturity
PMINEO_2012_03_OPM3_Organizational_PM_MaturityPMINEO_2012_03_OPM3_Organizational_PM_Maturity
PMINEO_2012_03_OPM3_Organizational_PM_Maturity
 
Achieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationAchieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and Implementation
 
Cmmi agile kulpa 2004meas cmmi[1]
Cmmi  agile kulpa 2004meas cmmi[1]Cmmi  agile kulpa 2004meas cmmi[1]
Cmmi agile kulpa 2004meas cmmi[1]
 
Tqm indian auto component questionnaire
Tqm indian auto component questionnaireTqm indian auto component questionnaire
Tqm indian auto component questionnaire
 
Slides 2015 for contact 7
Slides 2015 for contact 7Slides 2015 for contact 7
Slides 2015 for contact 7
 
Lean pilots by Mariya Breyter from Dun & Bradstreet
Lean pilots by Mariya Breyter from Dun & BradstreetLean pilots by Mariya Breyter from Dun & Bradstreet
Lean pilots by Mariya Breyter from Dun & Bradstreet
 
A folder sysem for uks 2008 2011
A folder sysem for uks 2008   2011A folder sysem for uks 2008   2011
A folder sysem for uks 2008 2011
 
Sourcin IQPC Munich 2014
Sourcin IQPC Munich 2014 Sourcin IQPC Munich 2014
Sourcin IQPC Munich 2014
 
Pmbok 6th edition_practice_questions
Pmbok 6th edition_practice_questionsPmbok 6th edition_practice_questions
Pmbok 6th edition_practice_questions
 
Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"
Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"
Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"
 
Itto pmbok guide 6th edition
Itto   pmbok guide 6th editionItto   pmbok guide 6th edition
Itto pmbok guide 6th edition
 

Recently uploaded

Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsGOKUL JS
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 

Recently uploaded (20)

Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebs
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 

Copy of lla – capstone project 5s

  • 3. Kaizen Charter Form Kaizen Name: 5s 5s Process Name: Consolidation of 5s procedure Start Point: Operations departments Scope End Point: Does VSM Exist? N/A VSM Owner or Exec. Sponsor: N/A Value Stream Name: N/A Charter Author: Chris Taylor Champion: Chris Taylor Leaders Date Created: 3/27/2012 Team Leader: Chris Taylor Current Revision: Rev A Facilitator: Chris Taylor Current 5s procedure is outdated & specific to Production department. Actual 5s audits occur in 3 areas within Timbercon, 2 of which are outside of Production department. Lean principles apply to Problem Statement: all functioning areas within a organization. Strategy Corporate strategy / goals improved by this kaizen Notes 1 To provide a system to ensure adherence with Lean Manufacturing principles 2 Simplify a 5s process usable by all Timbercon departments Kaizen Summary Key Deliverables (in order of importance) Overview Review of processes and documentation and current 1 Rewrite of current documentation practices 2 Simplified Worksheet for audits 3 Visual charts for departmental results 4 QDCSM Metric Units Current Goal %Δ 1 Metrics 2 3 4 5 Name Job Title Training Needs 1 Chris Taylor Production Manager 2 Cesar Flores Production Supervisor 3 Adam Brown Production Supervisor Review of new 5s Audit Checklist Form 4 John Talbot Materials Manager Special Equipment / Materials Date Arranged 5 Ed H Quality Manager 6 Bryan Kinish Buyer 1 N/A Resources 7 2 8 3 9 4 10 5 Resource Team On-Call Dates Schedule 1 John Talbot As needed Duration (Days): ~67 2 Ed H As needed Start Date: 3/27/2012 3 Bryan Kinish As needed End Date: 5/30/2012 4 Daily Start Time: 5 Report Out Date / Time: www.Vel a cti on.com © Copyri ght 2010 by Vel a cti on Conti nuous Improvement, LLC. Attachments?
  • 4. 5s 5s: Scope & Strategy  Review and simplification of our 5s procedure  Operational areas within Timbercon facility  Problem statement:  Current 5s procedure is outdated, narrow in scope, and specific to the Production department.  3 areas w/ differing schedules:  Production  Materials warehouse  Shop  Goals:  Provide system to ensure adherence to Lean Mfg Principles  Simplify 5s process for use by all departments
  • 5. Charter Team:  Charter beginning - 1/24/12 Discussion w/ operators  Charter Leader/Champion: Chris Taylor  Team members:  Cesar Flores, Production Supervisor  Adam Brown, Production Supervisor  Team resources:  John Talbot, Materials Manager  Ed Holz, Quality Manager  Bryan Kinish, Buyer  Tracy Slate, Supervisor Materials & Shipping
  • 6. Current State:  Procedure  Worksheets  Schedules
  • 7. PWI - 103 PRO DUCT IO N 5’S & RED T AG PRO GRAM 1.0 Purpose: Procedure: To provide a system and instructions to ensure adherence with the Lean Manufacturing Principles. 2.0 Scope: This procedure applies to all production employees and Leads are responsible for assuring their lines compliance & auditing. The Production Manager is responsibility for the overall program. All new employees will receive 5’S • Current document training. 3.0 Reference Documents: is Rev. A, 12/3/07, QF – 109 5’S Audit Worksheet 4.0 Definitions creation and release. 5S A method for removing all excess materials and tools from the workplace and organizing the required items (using Visual Controls) such that they are easy to find, use and maintain this, creates a self-sustaining culture which perpetuates a neat, clean, efficient workplace. Red Tag A method of identifying and removing all unneeded workplaces items by using a Red Tag visual management system, The Red tag process also takes into account the need to identify the proper • No reference of locations for items that are used in the workplace and it includes organizing them so that they are easy to find and use through the application of visual controls. 5.0 Procedure: 2 other worksheets 5.1 All production personnel are trained in 5’S. 5.2 5S audits are performed on a weekly basic by the designated Team Leads. 5.3 Each team has a determined Cleaning Standard and Schedule identifying the daily expectations and each individual assigned task. 5.4 Each team member is encouraged and expected to participate in 5S Kazien events. All production personnel are expected to be incompliance with their 5’S Cleaning Standards requirements. • Yellow highlights indicate 5.5 On a predetermined weekly audit date the Team Leads is responsible for scoring their line. (Ref. QF109) 5.6 Immediately after each weekly team audit, a follow up audit is conducted by the Production Manager. Audit includes maintaining the accuracy and consistency of the scoring system for each team. production specific 5.7 Weekly and monthly team audit results are posted on the Production Board. 5.8 As each team is conducting the 5S Kazien event a Red Tagging process is implemented. As teams identify unneeded items in the workplace, they are identified with a Red Tag and relocated to a references designated location. 5.9 Any red tag item issued to production is monitored by a designated Lead/Engineering Tech. 5.10Any unused red tagged items stored in the red tag holding area for more than 3-months will be reviewed by Engineering and the Production Manager for disposition.
  • 8. Worksheets: • 3 versions 5s Audit Sheet QF207 5s SHOP AUDIT SHEET5S SH O P AU DIT SH EE Q F207 Machine Shop: Scored By: QF205 5s AUDIT SHEET (MATERIALS) Date: Q F205 5S AUDIT SH EET (MAT ERIALS) Work Cell: 5S Categories Work Cell Score Location/Comments Scored By: QF109 5s AUDIT SHEET Q F109 5S AUDIT SH EET Date: SORT: Distinguish Between what is needed and not needed. Work Cell: 5S Categories No Unneeded equipment, tools, furniture, etc. Cellpresent……...………… Work are Score 0 1 Location/Comments 2 3 4 5 Scored By: Date: 5S Categories SORT: Distinguish Between what is needed and notbulletin board, etc………...…………………… No Unneeded items are on walls, needed. Work Cell Score Location/Comments 0 1 2 3 4 5 Unneeded equipment, tools, furniture, etc. are present……...………… 0 1 2 3 4 5 Items are present in aisle ways, stairway, corners, behind machines ……. 0 1 2 3 4 5 SORT: Distinguish Between what is needed and not needed. Unneeded items are on walls, bulletin board, etc………...…………………… 0 1 2 3 4 5 Unneeded equipment, tools, furniture, etc. are present……...…………Unneeded2 3 4 5 supplies, parts, or materials are present……… No 0 1 inventory, 0 1 2 3 4 5 Items are present in aisle ways, stairway, corners, behind machines 0 1 2 3 4 5 SET Unneeded items are on walls, bulletin board, etc………...…………………… TO 1ORDER: Organizing for ease of use, straightening up and putting things away. 0 2 3 4 5 Everything is stored in a marked location …….………………………………………… 0 1 2 3 4 5 Unneeded inventory, supplies, parts, or materials are present……… Items are present in aisle ways, stairway, corners, behind machines 0 1 2 3 4 5 0 1 2 3 4 5 Items are placed in an orderly manner...………………………………………………….. 0 1 2 3 4 5 Unneeded inventory, supplies, parts, or materials are present……… for ease of 4 5 straightening up and putting things away. SET TO ORDER: Organizing 0 1 2 3 use, Everything is stored in a markedAisle ways, workstations, equipment locations are indicated………………. location …….…………………………………… 0 1 2 3 4 5 0 1 2 3 4 5 SET TO ORDER: Organizing for ease of use, straightening up and putting things away. Items are placed in an orderly manner...…………………………………………….. Everything is stored in a marked location …….…………………………………… Material locations and required quantities 1 2 indicated………………………. 0 1 2 3 4 5 0 are 3 4 5 0 1 2 3 4 5 consumable location. Check shelf life material expiration dates. Items are placed in an orderly manner...…………………………………………….. locations are3 4 5 Aisle ways, workstations, equipment 0 1 2 indicated…………. 0 1 2 3 4 5 Designated equipments turned” Off” unless otherwise noted……………… 0 1 2 3 4 5 Aisle ways, workstations, equipment locations are indicated…………. Material locations and required quantities are 2 3 4 5 0 1 indicated………………… 0 1 2 3 4 5 consumable location. SHINE: Sweeping, scrubbing and cleaning and keeping things that way. Material locations and required quantities are indicated………………… 0 1 2 3 4 5 Items 10 seconds away……………………………………………………………………………… of0 1 oil and grease………………….. Floors, walls, and surfaces are free dirt 2 3 4 5 0 1 2 3 4 5 consumable location. Check shelf life material expiration dates. Items 10 seconds away……………………………………………………………………………… ………………………………….…………….. Designated equipments turned” Off” 0 1 2 3 4 5 Equipment is kept clean and free of dirt, oil, 2 3water...……………………… 0 1 and 4 5 0 1 2 3 4 5 SHINE: Sweeping, scrubbing and cleaning and keeping things that way. Designated equipments turned” Off” ………………………………….…………….. 0 1 2 3 4 5 Floors, walls, and surfaces are not free of dirt oil and grease……… 0 1 2 3 4 5 SHINE: Sweeping, scrubbing and cleaning and keeping things that way. Floors, walls, and surfaces are free of dirt oil and grease……… 0 1 2 3 4 5 Equipment is kept clean and free of dirt, oil, and water...………………… 0 1 2 3 4 5 Equipment is kept clean and free of dirt, oil, and water...………………… 0 1 2 3 4 5
  • 9. Schedules: • 3 differing timelines • Weekly - Procedure • Production • Sustaining this has been difficult- drop at end of year • Bi-weekly-Monthly • Materials schedule not documented • Monthly • Shop schedule not documented • Not always
  • 10. Waste per month: • 2 pages per audit or 38 pages per month • Production –16(weekly) • Materials – 2(bi-monthly) • Shop – 1(monthly) • Inconsistencies with schedule Walking Distance • Extra processing 135 ft • Overproduction/underproduction 78 ft • Motion 135 ft = 348 ft • 6 operators involved w/ audits • 15-20 minutes per audit or 6.33 hours monthly = $120.00
  • 11. Problems solving tools • Team discussion started on March 27 • Increase the urgency to make necessary changes • Build team to make this happen • Create the vision and get the buy-in • Empower action and create short term wins
  • 12. Charter in motion  Review documentation for revision  Create new format for checklist  Create new chart for visual results  Identify locations for results to be posted

Editor's Notes

  1. Project name: 5s the 5s procedure
  2. Current mantra at Timbercon for 5s is out on the production floor primarily and this cards helps remind those on the floor the meaning behind all the S’s
  3. Charter process name: consolidation of 5s procedureExpand the process to include all operational areas within Timbercon Current procedure references strictly production area, even though Materials and Shop are area’s outside production
  4. Charter process name: consolidation of 5s procedureExpand the process to include all operational areas within Timbercon Current procedure references strictly production area, even though Materials and Shop are area’s outside production
  5. Discussion came about from year end performance reviews and how 5s on one production line was different from another. Led me to investigate the lines and further the procedure.
  6. Current state shows the following:ProcedureWorksheets for auditSchedules
  7. Current rev