Turkey Point Units 6 & 7 Project
Steven Scroggs
Senior Director
Florida Power & Light Company
May 2013
2
$34.5 B market capitalization(1)
41,068 MW in operation
$64 B in total assets
NextEra Energy is a premier U.S. power company
comprised of two great businesses
Successful wholesale generator
U.S. leader in renewable generation
Assets in 24 states and Canada
17,771 MW in operation
One of the largest U.S. electric utilities
Vertically integrated, retail rate-regulated
4.6 million customer accounts
23,297 MW in operation
A growing, diversified and financially strong company
1) Market capitalization as of May 1, 2013;
2) All other data as of March 31, 2013
3
NextEra Energy Resources - in 24 states and Canada
4
FPL provides customers with the lowest electric bill in the
state, highly reliable and clean
5
FPL’s Turkey Point 6&7 project is in the licensing phase
Turkey Point Units 6 & 7 would be the largest industrial
project in the history of Florida
• Energy Policy – Why is nuclear generation important to Florida?
• Economic and Environmental Benefits
• Regulatory reviews and relative time frames
• Turkey Point 6 & 7 Project Features
• Location and Technology
• Water Related Infrastructure
• Roadway Improvements
• Transmission Lines
• Recent US Construction Experience
Discussion Topics
6
• Florida Energy Policy focuses
on specific needs
– Low and stable costs
– Fuel Diversity & Supply
Reliability
– Environmental objectives
• Nuclear technology uniquely
addresses the needs of
Floridians
– Provides low cost electricity
– Provides cost stability in fuel
portion of customer bills
– No CO2 emissions, does not
contribute to climate change
Over-reliance on any single fuel can expose customers
to supply reliability and cost risk
FPL’s Existing Power Generation Fuels
Source: FPL 2011
Gas
68.6%
Nuclear
19.1%
Coal
9.9%
Nuclear Provides Fuel Diversity
New nuclear provides low cost electricity that avoids carbon
emissions and diversifies the overall fuel mix
7
FPL’s nuclear investments are paying off for customers
today and creating future opportunity
The state energy policy is succeeding by creating jobs,
generating fuel savings and reducing emissions
Upgrades at Turkey Point and St. Lucie (532 MW)
– Thousands of new jobs, regional stimulus of $10 million/month
– $3.8 billion in customer fuel savings over lifetime
– Full results delivered within 8 years of enacting legislation
New Nuclear at Turkey Point (2200 MW)
– 3,600 direct jobs, over $6 billion during construction
– 800 direct jobs, over $100 million/year in tax revenues during
operation
– $78 billion in customer fuel savings and zero CO2 emissions
– Will recycle 60 million gallons per day of reclaimed water
Near Term and Long Term Investments
8
A nuclear project in Florida undergoes many regulatory
reviews
• Nuclear Regulatory Commission Combined License process
– Safety and Environmental reviews
• Army Corps Wetland (404b) permits
• US Fish & Wildlife Consultation
• Federally delegated programs (Air, Underground Injection)
• State Site Certification
– Umbrella program for power plants coordinated by FDEP
• Public Service Commission Need Determination
• County Zoning and Land Use determination
• CDMP Amendments, Governmental agreements, etc.
• Enabling federal and state legislation
• Annual Public Service Commission review
Regulatory Approvals
9
Turkey Point Plant
• Turkey Point Plant site
is approximately 25
miles south of Miami
• Five generating units on
the Turkey Point Plant
site - including two
nuclear units
• 9,400 acre power plant
site, including cooling
canal system
10
Turkey Point Units 6 & 7
Turkey Point Units 6 & 7 will be located south of the
current operating plants, within the cooling canal system
• Two Westinghouse AP1000
units – approximately 1100
MW each
– Passive Safety Design
• New support facilities (e.g.
administration, training
buildings, substation, etc.)
• Water treatment and delivery
infrastructure
• Roadway improvements
• Transmission improvements
The choice of the Turkey Point site leverages existing
infrastructure and avoids greenfield impacts
Turkey Point Units 6 & 7 Project Rendering
11
Turkey Point Units 6 & 7 – By the Numbers
• Labor Hours 30,325,000 hours
• Fill Material 11,258,000 cubic yards
• Concrete 784,000 cubic yards
• Steel 74,000 tons
• Cable and Wire 800 miles
• Roads & Paving 240 miles
• Pre-Engineered Buildings 371,000 square feet
The two AP1000 reactors and associated facilities
require significant materials and labor
12
Layered Passive Design features
• Passive core cooling system
internal to containment
• Passive cooling for
containment as a whole
• In vessel retention in event
of meltdown
Location, analyses and civil design
• Low seismic hazard
• Fully investigated tsunami
scenarios
• Elevated above maximum
surge and flood +10%
AP1000 Design Enhancements
The AP1000 design is a significant evolution in design over
the current generation of plants
The AP1000 incorporates design improvements in reactor
operations from the current safe designs
13
South
District
WWTP
Turkey
Point
• A creative and synergistic approach to
meeting large scale water needs in
South Florida
• Will assist County meeting reuse and
ocean outfall regulatory requirements
• FPL will construct and County will
own/operate a 9 mile reclaimed water
pipeline
• Backup supply only needed when
reclaimed deliveries are not sufficient
– FPL has agreed to a condition limiting the
use to 60 days in a 12 month period
Region Specific Water Plan
Turkey Point 6&7 will use reclaimed water as its primary
source of cooling water, the largest user in the state
Reclaimed water used by Turkey Point Units 6 & 7 will not compete
with reclaimed water reserved for Everglades restoration
14
• Design eliminates entrapment
and entrainment of fish and other
species
• Groundwater modeling has
demonstrated no adverse impact
to drinking water supplies or the
environment
• Caisson construction in upland
areas
• Laterals constructed from within
caisson – no dredge and fill
activities in Biscayne Bay
• FPL has proposed use
restrictions to limit the amount
the backup supply would be used
Radial Collector Wells
Radial wells have been in use for over 60 years and offer
and minimize environmental impacts
A backup supply is commonly provided when power plants must
rely on municipal waste water production for cooling
* RCW location and lateral orientation illustrative
15
Pumping Activities At Equilibrium
Not to scale
16
Road improvements provide a second site access and
increase capacity during the construction period
17
Existing Paved
Roadways
Two access points
are needed to meet
project needs
Additional culverts will be added as
needed to increase wetland flow
SW 328th
St.
SW 344th
St.
SW 359th
St.
18
Significant agency, local government consultation and
community outreach was used to develop the corridors
• Integration requires new lines
– All lines remain within Miami-Dade
– Extensive outreach to residents was
incorporated into siting study
– Utilizes existing rights of way where
practicable
• Five new power lines are being
proposed
– Approximately 70% within existing
rights-of-way
– Connect site substations
– Eastern corridor (blue)
– One 230 kV line
– Suburban and urban areas
– Western corridor (green)
– One 230 kV line, Two 500 kV lines
– Preferred corridor requires land
exchange in area of ENP
19
Local Government and Public Outreach efforts are an
integral part of the Transmission siting process
• Input from the public and local
governments was solicited up front
in the route selection process and
considered in the selection
– Agency workshops,
– Open houses,
– Meetings with business, civic and
homeowner groups,
– E-surveys for customer input
• FPL encouraged other parties to
file alternate transmission line
corridors for consideration in the
process
– Local governments, groups or
individuals can submit alternates
Extensive Outreach
Open House at Elks Club, South Miami
20
The choice to allow alternate corridors will ensure all
credible alternates are reviewed on an equal footing
• FPL encouraged other parties to
file alternate transmission line
corridors for consideration in the
process
– Local governments, groups or
individuals can submit alternates
• Five alternate corridors have been
filed and accepted in the PPSA
review process
– Village of Pinecrest/City of Coral
Gables provided an eastern alternate
– National Parks Conservation
Association provided a western
alternate completely out of ENP
– Miami-Dade Limestone Producers
Association offered several western
alternates
Alternate Corridors
21
Backup Slides
22
Undergrounding Basics
• Cost range: $13.3-$18.5 MM/mile, versus
$2 MM/mile for overhead
• Factors affecting cost include:
– Surface and sub-surface conditions
– Available easements
– Transmission conductor and vault design
• Funding mechanisms include:
– Special assessment, collected by local
government or via local tariff on electric
bill
– Chapter 170 and 190, Florida Statutes
– Dedication of property tax revenues
Undergrounding, while an option, is a local decision and investment
Installing underground duct bank
system
Trench construction
Underground line construction is possible, but intensive
and costly
23
Unprecedented job creation and resulting economic
impact on the regional economy
• Creation of approximately
4,000 direct onsite jobs
and 4,000 indirect jobs at
peak construction
• Annual total wages will
average $230 million
during construction*
• $8 billion to $11 billion in
total economic output over
the construction period
Turkey Point 6 & 7 Regional Economic Benefits
The investment will pay dividends in the near term and for
generations to come
*Direct & Indirect Impacts Included
$0
$50
$100
$150
$200
$250
$300
$350
$400
WageImpacts($millions)
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Year
College-age
students
Middle & High
school
students
Grade school
students
24
Use of Turkey Point plant property minimizes impacts and
builds on current environmental benefits
• Land
• Minimizes impact by locating within the
existing Industrial Waste Water Facility
• Threatened and Endangered Species
• Protects significant habitat for wildlife and
wetlands
• Respectful of Water Resources
• Recycles reclaimed waste water supporting
County obligations
• Significant Reduction in Emissions
• Avoids 7 million tons of CO2 per year
• Regional Mitigation Projects
• Projects restore natural environments in
vicinity of Biscayne National Park
Turkey Point Units 6 & 7 Project continues FPL’s
longstanding record in environmental stewardship
Regional Environmental Benefits

Más contenido relacionado

La actualidad más candente

EPA & NCTCOG Symposium-Sustainability in a Changing World: Local Government A...
EPA & NCTCOG Symposium-Sustainability in a Changing World: Local Government A...EPA & NCTCOG Symposium-Sustainability in a Changing World: Local Government A...
EPA & NCTCOG Symposium-Sustainability in a Changing World: Local Government A...myersverde
 
3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...ascemiami-dade
 
CH2M Hill: Euclid stormwater Integrated Planing
CH2M Hill: Euclid stormwater Integrated PlaningCH2M Hill: Euclid stormwater Integrated Planing
CH2M Hill: Euclid stormwater Integrated PlaningBluestone Heights
 
January 13, 2011 City Council Workshop
January 13, 2011 City Council WorkshopJanuary 13, 2011 City Council Workshop
January 13, 2011 City Council Workshoppublicinvolvement
 
CH2M Hill: Onondaga Co green stormwater solutions
CH2M Hill: Onondaga Co green stormwater solutionsCH2M Hill: Onondaga Co green stormwater solutions
CH2M Hill: Onondaga Co green stormwater solutionsBluestone Heights
 
LTCP meeting 11-16-05
LTCP meeting 11-16-05LTCP meeting 11-16-05
LTCP meeting 11-16-05HartTWI
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Adam Berry
 
Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Wallace Roberts & Todd
 
Digital construction for DSD - relocation of Sewage Treatment Plant
Digital construction for DSD - relocation of Sewage Treatment PlantDigital construction for DSD - relocation of Sewage Treatment Plant
Digital construction for DSD - relocation of Sewage Treatment PlantStephen Au
 
9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth
9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth
9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future GrowthAPA Florida
 
GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016
GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016
GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016Andy Van Horn
 
Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationFairfax County
 
CPAC Meeting 4-18-06
CPAC Meeting 4-18-06CPAC Meeting 4-18-06
CPAC Meeting 4-18-06HartTWI
 
C5 council workshop 111128_final
C5 council workshop 111128_finalC5 council workshop 111128_final
C5 council workshop 111128_finalpublicinvolvement
 
August 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public ForumAugust 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public Forumpublicinvolvement
 
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...Association for Project Management
 

La actualidad más candente (20)

Scheuer Climate Change
Scheuer Climate ChangeScheuer Climate Change
Scheuer Climate Change
 
EPA & NCTCOG Symposium-Sustainability in a Changing World: Local Government A...
EPA & NCTCOG Symposium-Sustainability in a Changing World: Local Government A...EPA & NCTCOG Symposium-Sustainability in a Changing World: Local Government A...
EPA & NCTCOG Symposium-Sustainability in a Changing World: Local Government A...
 
3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...
 
CH2M Hill: Euclid stormwater Integrated Planing
CH2M Hill: Euclid stormwater Integrated PlaningCH2M Hill: Euclid stormwater Integrated Planing
CH2M Hill: Euclid stormwater Integrated Planing
 
January 13, 2011 City Council Workshop
January 13, 2011 City Council WorkshopJanuary 13, 2011 City Council Workshop
January 13, 2011 City Council Workshop
 
CH2M Hill: Onondaga Co green stormwater solutions
CH2M Hill: Onondaga Co green stormwater solutionsCH2M Hill: Onondaga Co green stormwater solutions
CH2M Hill: Onondaga Co green stormwater solutions
 
LTCP meeting 11-16-05
LTCP meeting 11-16-05LTCP meeting 11-16-05
LTCP meeting 11-16-05
 
DOPWIC Program Year 2020 Applicant Workshop
DOPWIC Program Year 2020 Applicant WorkshopDOPWIC Program Year 2020 Applicant Workshop
DOPWIC Program Year 2020 Applicant Workshop
 
Draft EIS - Kemper County IGCC Project
Draft EIS - Kemper County IGCC ProjectDraft EIS - Kemper County IGCC Project
Draft EIS - Kemper County IGCC Project
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
 
Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2
 
Digital construction for DSD - relocation of Sewage Treatment Plant
Digital construction for DSD - relocation of Sewage Treatment PlantDigital construction for DSD - relocation of Sewage Treatment Plant
Digital construction for DSD - relocation of Sewage Treatment Plant
 
9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth
9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth
9/9 FRI 11:00 | Water Woes, Cash Flow Woes & Future Growth
 
GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016
GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016
GreenFire Energy Presentation for CEC Clean Energy Workshop Feb 18 2016
 
Kirby Road Sidewalk Presentation
Kirby Road Sidewalk PresentationKirby Road Sidewalk Presentation
Kirby Road Sidewalk Presentation
 
Final EIS Summary - Kemper County IGCC Project
Final EIS Summary - Kemper County IGCC Project Final EIS Summary - Kemper County IGCC Project
Final EIS Summary - Kemper County IGCC Project
 
CPAC Meeting 4-18-06
CPAC Meeting 4-18-06CPAC Meeting 4-18-06
CPAC Meeting 4-18-06
 
C5 council workshop 111128_final
C5 council workshop 111128_finalC5 council workshop 111128_final
C5 council workshop 111128_final
 
August 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public ForumAugust 24 Clean Water Facility Planning Public Forum
August 24 Clean Water Facility Planning Public Forum
 
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
Establishing the Programme Delivery Arrangements for a Major Infrastructure P...
 

Similar a K.1 turkey point units 6 & 7 project

Regulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative EnergyRegulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative EnergyKevin Haroff
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
Jenna Ide GCC 2015
Jenna Ide GCC 2015Jenna Ide GCC 2015
Jenna Ide GCC 2015GWT
 
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...AnnArborSPARK
 
Decommissioning: The Benefits, Risks and Liabilities
Decommissioning: The Benefits, Risks and LiabilitiesDecommissioning: The Benefits, Risks and Liabilities
Decommissioning: The Benefits, Risks and LiabilitiesTRC Companies, Inc.
 
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland ParkHieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland ParkKevin Perry
 
DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20Heritage Wind
 
Analysis of Community Microgrids: The path to resilient and sustainable commu...
Analysis of Community Microgrids: The path to resilient and sustainable commu...Analysis of Community Microgrids: The path to resilient and sustainable commu...
Analysis of Community Microgrids: The path to resilient and sustainable commu...Clean Coalition
 
Norman economic summit presentation city of norman presentation - 5-2-13
Norman economic summit presentation   city of norman presentation - 5-2-13Norman economic summit presentation   city of norman presentation - 5-2-13
Norman economic summit presentation city of norman presentation - 5-2-13Norman Economic Development Coalition
 
The Community Microgrid Initiative: The path to resilience and sustainability
The Community Microgrid Initiative: The path to resilience and sustainabilityThe Community Microgrid Initiative: The path to resilience and sustainability
The Community Microgrid Initiative: The path to resilience and sustainabilityClean Coalition
 
4 accomplishments rmu - westin 5-24-16b
4   accomplishments rmu - westin 5-24-16b4   accomplishments rmu - westin 5-24-16b
4 accomplishments rmu - westin 5-24-16bDan Westin
 
Gambit Energy Storage Park Power ppt for Town Hall mtg 10102019.pdf
Gambit Energy Storage Park Power ppt for Town Hall mtg 10102019.pdfGambit Energy Storage Park Power ppt for Town Hall mtg 10102019.pdf
Gambit Energy Storage Park Power ppt for Town Hall mtg 10102019.pdfSyedFurqanRafique
 
AGDC Joint Resources Presentation October 16 2017
AGDC Joint Resources Presentation October 16 2017AGDC Joint Resources Presentation October 16 2017
AGDC Joint Resources Presentation October 16 2017Geoffrey Humphreys
 
2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major ProjectsEnbridge Inc.
 
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...Deltares
 
Planning for the Future: The Changing World of the Electric Transmission System
Planning for the Future: The Changing World of the Electric Transmission SystemPlanning for the Future: The Changing World of the Electric Transmission System
Planning for the Future: The Changing World of the Electric Transmission SystemSociety of Women Engineers
 
Phila_Navy Yard Energy Innovation Campus Overview
Phila_Navy Yard Energy Innovation Campus OverviewPhila_Navy Yard Energy Innovation Campus Overview
Phila_Navy Yard Energy Innovation Campus OverviewRodney Jones Sr.
 
North Bay Community Resilience Initiative: The Path to Resilience and Sustain...
North Bay Community Resilience Initiative: The Path to Resilience and Sustain...North Bay Community Resilience Initiative: The Path to Resilience and Sustain...
North Bay Community Resilience Initiative: The Path to Resilience and Sustain...Clean Coalition
 
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessEMRoundtable
 

Similar a K.1 turkey point units 6 & 7 project (20)

Regulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative EnergyRegulatory Challenges to Alternative Energy
Regulatory Challenges to Alternative Energy
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Jenna Ide GCC 2015
Jenna Ide GCC 2015Jenna Ide GCC 2015
Jenna Ide GCC 2015
 
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...
Michigan Energy Forum - Renewable Energy on Brownfields and Landfills - June ...
 
Decommissioning: The Benefits, Risks and Liabilities
Decommissioning: The Benefits, Risks and LiabilitiesDecommissioning: The Benefits, Risks and Liabilities
Decommissioning: The Benefits, Risks and Liabilities
 
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland ParkHieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
Hieb, Wendy, IDNR, Hot Topics in NPDES Permitting, MECC, 2016, Overland Park
 
DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20DOW Public Meeting Slides 2.5.20
DOW Public Meeting Slides 2.5.20
 
Analysis of Community Microgrids: The path to resilient and sustainable commu...
Analysis of Community Microgrids: The path to resilient and sustainable commu...Analysis of Community Microgrids: The path to resilient and sustainable commu...
Analysis of Community Microgrids: The path to resilient and sustainable commu...
 
Norman economic summit presentation city of norman presentation - 5-2-13
Norman economic summit presentation   city of norman presentation - 5-2-13Norman economic summit presentation   city of norman presentation - 5-2-13
Norman economic summit presentation city of norman presentation - 5-2-13
 
The Community Microgrid Initiative: The path to resilience and sustainability
The Community Microgrid Initiative: The path to resilience and sustainabilityThe Community Microgrid Initiative: The path to resilience and sustainability
The Community Microgrid Initiative: The path to resilience and sustainability
 
4 accomplishments rmu - westin 5-24-16b
4   accomplishments rmu - westin 5-24-16b4   accomplishments rmu - westin 5-24-16b
4 accomplishments rmu - westin 5-24-16b
 
Gambit Energy Storage Park Power ppt for Town Hall mtg 10102019.pdf
Gambit Energy Storage Park Power ppt for Town Hall mtg 10102019.pdfGambit Energy Storage Park Power ppt for Town Hall mtg 10102019.pdf
Gambit Energy Storage Park Power ppt for Town Hall mtg 10102019.pdf
 
AGDC Joint Resources Presentation October 16 2017
AGDC Joint Resources Presentation October 16 2017AGDC Joint Resources Presentation October 16 2017
AGDC Joint Resources Presentation October 16 2017
 
2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects2014 Enbridge Day - Major Projects
2014 Enbridge Day - Major Projects
 
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
DSD-INT 2019 Keynote - A National Flood-Guidance Programme for Canada - Pietr...
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
Planning for the Future: The Changing World of the Electric Transmission System
Planning for the Future: The Changing World of the Electric Transmission SystemPlanning for the Future: The Changing World of the Electric Transmission System
Planning for the Future: The Changing World of the Electric Transmission System
 
Phila_Navy Yard Energy Innovation Campus Overview
Phila_Navy Yard Energy Innovation Campus OverviewPhila_Navy Yard Energy Innovation Campus Overview
Phila_Navy Yard Energy Innovation Campus Overview
 
North Bay Community Resilience Initiative: The Path to Resilience and Sustain...
North Bay Community Resilience Initiative: The Path to Resilience and Sustain...North Bay Community Resilience Initiative: The Path to Resilience and Sustain...
North Bay Community Resilience Initiative: The Path to Resilience and Sustain...
 
Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site Readiness
 

Más de ascemiami-dade

Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...ascemiami-dade
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...ascemiami-dade
 
2.3 i 595 improvements
2.3 i 595 improvements2.3 i 595 improvements
2.3 i 595 improvementsascemiami-dade
 
2.4 fll airport improvements
2.4 fll airport improvements2.4 fll airport improvements
2.4 fll airport improvementsascemiami-dade
 
K.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progressionK.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progressionascemiami-dade
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...ascemiami-dade
 
2.3 i 595 improvements
2.3 i 595 improvements2.3 i 595 improvements
2.3 i 595 improvementsascemiami-dade
 
3.2 wpb transit village
3.2 wpb transit village3.2 wpb transit village
3.2 wpb transit villageascemiami-dade
 
3.3 everglades restoration plans
3.3 everglades restoration plans3.3 everglades restoration plans
3.3 everglades restoration plansascemiami-dade
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
 
2.1 port of miami tunnel cei
2.1 port of miami tunnel cei2.1 port of miami tunnel cei
2.1 port of miami tunnel ceiascemiami-dade
 
1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoir1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoirascemiami-dade
 
1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoir1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoirascemiami-dade
 

Más de ascemiami-dade (20)

Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...
 
2.3 i 595 improvements
2.3 i 595 improvements2.3 i 595 improvements
2.3 i 595 improvements
 
2.4 fll airport improvements
2.4 fll airport improvements2.4 fll airport improvements
2.4 fll airport improvements
 
K.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progressionK.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progression
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...
 
2.3 i 595 improvements
2.3 i 595 improvements2.3 i 595 improvements
2.3 i 595 improvements
 
4 public policy panel
4   public policy panel4   public policy panel
4 public policy panel
 
4 cards
4   cards4   cards
4 cards
 
3.2 wpb transit village
3.2 wpb transit village3.2 wpb transit village
3.2 wpb transit village
 
3.3 everglades restoration plans
3.3 everglades restoration plans3.3 everglades restoration plans
3.3 everglades restoration plans
 
3 climate change
3   climate change3   climate change
3 climate change
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
 
2.1 port of miami tunnel cei
2.1 port of miami tunnel cei2.1 port of miami tunnel cei
2.1 port of miami tunnel cei
 
1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoir1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoir
 
2 transportation
2   transportation2   transportation
2 transportation
 
1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoir1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoir
 
1.3 pbcwud update
1.3 pbcwud update1.3 pbcwud update
1.3 pbcwud update
 
1.2 bcwws update
1.2 bcwws update1.2 bcwws update
1.2 bcwws update
 

Último

Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...Wes McKinney
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...itnewsafrica
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI AgeCprime
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 

Último (20)

Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI Age
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 

K.1 turkey point units 6 & 7 project

  • 1. Turkey Point Units 6 & 7 Project Steven Scroggs Senior Director Florida Power & Light Company May 2013
  • 2. 2 $34.5 B market capitalization(1) 41,068 MW in operation $64 B in total assets NextEra Energy is a premier U.S. power company comprised of two great businesses Successful wholesale generator U.S. leader in renewable generation Assets in 24 states and Canada 17,771 MW in operation One of the largest U.S. electric utilities Vertically integrated, retail rate-regulated 4.6 million customer accounts 23,297 MW in operation A growing, diversified and financially strong company 1) Market capitalization as of May 1, 2013; 2) All other data as of March 31, 2013
  • 3. 3 NextEra Energy Resources - in 24 states and Canada
  • 4. 4 FPL provides customers with the lowest electric bill in the state, highly reliable and clean
  • 5. 5 FPL’s Turkey Point 6&7 project is in the licensing phase Turkey Point Units 6 & 7 would be the largest industrial project in the history of Florida • Energy Policy – Why is nuclear generation important to Florida? • Economic and Environmental Benefits • Regulatory reviews and relative time frames • Turkey Point 6 & 7 Project Features • Location and Technology • Water Related Infrastructure • Roadway Improvements • Transmission Lines • Recent US Construction Experience Discussion Topics
  • 6. 6 • Florida Energy Policy focuses on specific needs – Low and stable costs – Fuel Diversity & Supply Reliability – Environmental objectives • Nuclear technology uniquely addresses the needs of Floridians – Provides low cost electricity – Provides cost stability in fuel portion of customer bills – No CO2 emissions, does not contribute to climate change Over-reliance on any single fuel can expose customers to supply reliability and cost risk FPL’s Existing Power Generation Fuels Source: FPL 2011 Gas 68.6% Nuclear 19.1% Coal 9.9% Nuclear Provides Fuel Diversity New nuclear provides low cost electricity that avoids carbon emissions and diversifies the overall fuel mix
  • 7. 7 FPL’s nuclear investments are paying off for customers today and creating future opportunity The state energy policy is succeeding by creating jobs, generating fuel savings and reducing emissions Upgrades at Turkey Point and St. Lucie (532 MW) – Thousands of new jobs, regional stimulus of $10 million/month – $3.8 billion in customer fuel savings over lifetime – Full results delivered within 8 years of enacting legislation New Nuclear at Turkey Point (2200 MW) – 3,600 direct jobs, over $6 billion during construction – 800 direct jobs, over $100 million/year in tax revenues during operation – $78 billion in customer fuel savings and zero CO2 emissions – Will recycle 60 million gallons per day of reclaimed water Near Term and Long Term Investments
  • 8. 8 A nuclear project in Florida undergoes many regulatory reviews • Nuclear Regulatory Commission Combined License process – Safety and Environmental reviews • Army Corps Wetland (404b) permits • US Fish & Wildlife Consultation • Federally delegated programs (Air, Underground Injection) • State Site Certification – Umbrella program for power plants coordinated by FDEP • Public Service Commission Need Determination • County Zoning and Land Use determination • CDMP Amendments, Governmental agreements, etc. • Enabling federal and state legislation • Annual Public Service Commission review Regulatory Approvals
  • 9. 9 Turkey Point Plant • Turkey Point Plant site is approximately 25 miles south of Miami • Five generating units on the Turkey Point Plant site - including two nuclear units • 9,400 acre power plant site, including cooling canal system
  • 10. 10 Turkey Point Units 6 & 7 Turkey Point Units 6 & 7 will be located south of the current operating plants, within the cooling canal system • Two Westinghouse AP1000 units – approximately 1100 MW each – Passive Safety Design • New support facilities (e.g. administration, training buildings, substation, etc.) • Water treatment and delivery infrastructure • Roadway improvements • Transmission improvements The choice of the Turkey Point site leverages existing infrastructure and avoids greenfield impacts Turkey Point Units 6 & 7 Project Rendering
  • 11. 11 Turkey Point Units 6 & 7 – By the Numbers • Labor Hours 30,325,000 hours • Fill Material 11,258,000 cubic yards • Concrete 784,000 cubic yards • Steel 74,000 tons • Cable and Wire 800 miles • Roads & Paving 240 miles • Pre-Engineered Buildings 371,000 square feet The two AP1000 reactors and associated facilities require significant materials and labor
  • 12. 12 Layered Passive Design features • Passive core cooling system internal to containment • Passive cooling for containment as a whole • In vessel retention in event of meltdown Location, analyses and civil design • Low seismic hazard • Fully investigated tsunami scenarios • Elevated above maximum surge and flood +10% AP1000 Design Enhancements The AP1000 design is a significant evolution in design over the current generation of plants The AP1000 incorporates design improvements in reactor operations from the current safe designs
  • 13. 13 South District WWTP Turkey Point • A creative and synergistic approach to meeting large scale water needs in South Florida • Will assist County meeting reuse and ocean outfall regulatory requirements • FPL will construct and County will own/operate a 9 mile reclaimed water pipeline • Backup supply only needed when reclaimed deliveries are not sufficient – FPL has agreed to a condition limiting the use to 60 days in a 12 month period Region Specific Water Plan Turkey Point 6&7 will use reclaimed water as its primary source of cooling water, the largest user in the state Reclaimed water used by Turkey Point Units 6 & 7 will not compete with reclaimed water reserved for Everglades restoration
  • 14. 14 • Design eliminates entrapment and entrainment of fish and other species • Groundwater modeling has demonstrated no adverse impact to drinking water supplies or the environment • Caisson construction in upland areas • Laterals constructed from within caisson – no dredge and fill activities in Biscayne Bay • FPL has proposed use restrictions to limit the amount the backup supply would be used Radial Collector Wells Radial wells have been in use for over 60 years and offer and minimize environmental impacts A backup supply is commonly provided when power plants must rely on municipal waste water production for cooling * RCW location and lateral orientation illustrative
  • 15. 15 Pumping Activities At Equilibrium Not to scale
  • 16. 16 Road improvements provide a second site access and increase capacity during the construction period
  • 17. 17 Existing Paved Roadways Two access points are needed to meet project needs Additional culverts will be added as needed to increase wetland flow SW 328th St. SW 344th St. SW 359th St.
  • 18. 18 Significant agency, local government consultation and community outreach was used to develop the corridors • Integration requires new lines – All lines remain within Miami-Dade – Extensive outreach to residents was incorporated into siting study – Utilizes existing rights of way where practicable • Five new power lines are being proposed – Approximately 70% within existing rights-of-way – Connect site substations – Eastern corridor (blue) – One 230 kV line – Suburban and urban areas – Western corridor (green) – One 230 kV line, Two 500 kV lines – Preferred corridor requires land exchange in area of ENP
  • 19. 19 Local Government and Public Outreach efforts are an integral part of the Transmission siting process • Input from the public and local governments was solicited up front in the route selection process and considered in the selection – Agency workshops, – Open houses, – Meetings with business, civic and homeowner groups, – E-surveys for customer input • FPL encouraged other parties to file alternate transmission line corridors for consideration in the process – Local governments, groups or individuals can submit alternates Extensive Outreach Open House at Elks Club, South Miami
  • 20. 20 The choice to allow alternate corridors will ensure all credible alternates are reviewed on an equal footing • FPL encouraged other parties to file alternate transmission line corridors for consideration in the process – Local governments, groups or individuals can submit alternates • Five alternate corridors have been filed and accepted in the PPSA review process – Village of Pinecrest/City of Coral Gables provided an eastern alternate – National Parks Conservation Association provided a western alternate completely out of ENP – Miami-Dade Limestone Producers Association offered several western alternates Alternate Corridors
  • 22. 22 Undergrounding Basics • Cost range: $13.3-$18.5 MM/mile, versus $2 MM/mile for overhead • Factors affecting cost include: – Surface and sub-surface conditions – Available easements – Transmission conductor and vault design • Funding mechanisms include: – Special assessment, collected by local government or via local tariff on electric bill – Chapter 170 and 190, Florida Statutes – Dedication of property tax revenues Undergrounding, while an option, is a local decision and investment Installing underground duct bank system Trench construction Underground line construction is possible, but intensive and costly
  • 23. 23 Unprecedented job creation and resulting economic impact on the regional economy • Creation of approximately 4,000 direct onsite jobs and 4,000 indirect jobs at peak construction • Annual total wages will average $230 million during construction* • $8 billion to $11 billion in total economic output over the construction period Turkey Point 6 & 7 Regional Economic Benefits The investment will pay dividends in the near term and for generations to come *Direct & Indirect Impacts Included $0 $50 $100 $150 $200 $250 $300 $350 $400 WageImpacts($millions) 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Year College-age students Middle & High school students Grade school students
  • 24. 24 Use of Turkey Point plant property minimizes impacts and builds on current environmental benefits • Land • Minimizes impact by locating within the existing Industrial Waste Water Facility • Threatened and Endangered Species • Protects significant habitat for wildlife and wetlands • Respectful of Water Resources • Recycles reclaimed waste water supporting County obligations • Significant Reduction in Emissions • Avoids 7 million tons of CO2 per year • Regional Mitigation Projects • Projects restore natural environments in vicinity of Biscayne National Park Turkey Point Units 6 & 7 Project continues FPL’s longstanding record in environmental stewardship Regional Environmental Benefits

Notas del editor

  1. NextEra Energy Resources now has operations in 26 states and three Canadian provinces. Energy Resources is the largest producer of wind power in North America and the second largest in the world. We are also the nation’s leading producer of solar energy and own nuclear plants in New Hampshire, Wisconsin, and Iowa. Over the past decade, Energy Resources has become a Fortune 500 company in its own right. The company has $4.4 billion in revenue and nearly 5,000 employees, more than 1,000 of them based in Palm Beach County.
  2. We are the largest investor-owned electric utility in Florida, covering roughly half the state. Nationally, FPL is the third-largest utility by number of customers. We are delivering superior value for our customers. Our typical monthly customer bills are the lowest of all 55 utilities in the state and 24 percent below the national average. We provide our customers with 99.98 percent service reliability. And our power plants are among the cleanest in the entire industry, with a CO2 emissions profile 35 percent better than the national average.
  3. Another choice that local governments and individuals have if they do not like the corridor that FPL chose is to submit an alternate corridor. To meet the PPSA requirements, an alternate corridor must connect the terminal and other substation points, and it must be a route that is feasible from an engineering standpoint. The proponent will present the alternate corridor at the certification hearing and put on testimony of why this is a better route. On the last TLSA project, 14 alternate corridors were submitted and one was certified in most of its entirely. Alternate routes have been submitted by landowners, homeowners groups, agencies and individuals. FPL is available to consult with anyone submitting an alternate corridor.
  4. Another choice that local governments and individuals have if they do not like the corridor that FPL chose is to submit an alternate corridor. To meet the PPSA requirements, an alternate corridor must connect the terminal and other substation points, and it must be a route that is feasible from an engineering standpoint. The proponent will present the alternate corridor at the certification hearing and put on testimony of why this is a better route. On the last TLSA project, 14 alternate corridors were submitted and one was certified in most of its entirely. Alternate routes have been submitted by landowners, homeowners groups, agencies and individuals. FPL is available to consult with anyone submitting an alternate corridor.
  5. Another choice that local governments and individuals have if they do not like the corridor that FPL chose is to submit an alternate corridor. To meet the PPSA requirements, an alternate corridor must connect the terminal and other substation points, and it must be a route that is feasible from an engineering standpoint. The proponent will present the alternate corridor at the certification hearing and put on testimony of why this is a better route. On the last TLSA project, 14 alternate corridors were submitted and one was certified in most of its entirely. Alternate routes have been submitted by landowners, homeowners groups, agencies and individuals. FPL is available to consult with anyone submitting an alternate corridor.