I‐595 Express Corridor Improvements Project
Kelley Hall, PE | FDOT
May 10, 2013
TYPICAL SECTIONS
PROJECT COMPONENTS
• Reversible Express Lanes
• Direct Connect to 
Florida’s Turnpike
• Open Road Tolling
• SR 84 Continuous Connection
• Florida’s Turnpike Interchange
• Broward County Greenway
• Ramp Improvements
• Auxiliary Lanes
• Braided Ramps
• Bypass Bridges
• Sound Barrier Walls
Concessionaire
Counsel
Concession Agreement
DB Contract
Technical and Legal Advice
Financing Agreements
Technical Advisor
Design‐Build Contractor
Design Subcontractor
CEI O&M 
LendersLenders
Design‐Build Contractor
Design Management
Construction/Operations 
Management
I‐595 TEAM ORGANIZATION
Bank
Syndicate/TIFIA
INNOVATIONS
• 1st DBFOM P3 in Florida
• 1st Availability Payment P3 in the US
• Reversible Toll Lanes (six lanes for the price of three)
• Congestion Pricing
• State of the Art Emergency Access and Infrastructure
 Fire suppression system 
 Emergency access gates
• 35‐year Operations and Maintenance (O&M)
• Direct Connections to Florida’s Turnpike
• Oversight CEI
• Shared‐use Drainage  
INNOVATIONS ‐ CONTRACTING
Why a Public Private Partnership (P3) was considered for the I‐595 Corridor:
• Accelerated the schedule
 Advanced noise wall construction
 Provided capacity improvements a minimum of 15 years sooner than the 
Initial (conventional) plan
• Provided financial mechanism for funding shortfall
• Potential to deliver long‐term cost savings and higher levels of service
• Industry Innovation
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Projects 1 thru 6 & 8 UNFUNDED Projects 7, 9, 10, & 10A
Projects 1 thru 10A
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Projects 1 thru 6 & 8 UNFUNDED Projects 7, 9, 10, & 10A
CONSTRUCTION YEARS
PROJECTS 1 THRU 10A
CURRENT ANTICIPATED PLAN
Projects 1 thru 10A
PROJECTS 1 THRU 10A
PUBLIC – PRIVATE
PARTNERSHIP (P3)
INNOVATIONS ‐ CONTRACTING
$0
$50
$100
$150
$200
$250
$300
2014 2015 2016 2017 2018 2019 2020 2044
20
66
50
124
71
95
123
217
4
Payments (Millions)
Year
I‐595 Express Payment Structure  
Final
Maximum Milestones Payment
Availability
Scheduled
Construction
Completion
July 2014
Design & 
Construction 
March 2009
2009
INNOVATIONS – EXPRESS LANES
Morning Movement ‐ Eastbound Access Open 
N
INNOVATIONS – EXPRESS LANES
Afternoon Movement – Westbound Access Open
N
INNOVATIONS ‐ SAFETY
Emergency Access Gates
Warning Gates
LONGITUDINAL SLIDING GATE BY ENERGY 
ABSORPTION
• 42 FT WIDE OPENING
• REMOTE CONTROL OPENING
Fire Suppression System
INNOVATIONS – PROJECT COST
Summer 2009 Summer 2010
• Right of Way Acquisition
• Shared‐Use Drainage
To
Naples
University Drive
Pine Island Road
Nob Hill Road
Hiatus Road
Flamingo Road
Davie Road
Broward Boulevard
Sunrise Boulevard
Peters Road
Griffin Road
To Miami
To West Palm Beach
To Miami
SW 136 Avenue
Port 
Everglades
FLL
Airport
Segment C
Began February 2010
82% Complete
Segment E
Began April 2011
70% Complete
Project Limits
I‐595 from I‐75/Sawgrass Expressway Interchange to west of the I‐95 Interchange
and Florida’s Turnpike from Griffin Road to Peters Road
Segment D
Began June 2010
78% Complete
Segment A/B
Began November 2010
78% Complete
CONSTRUCTION PROGRESS
I‐595 PROJECT HIGHLIGHTS
• Total Construction Completed: $633.4M
‒ Construction Completed in March 2013: $21.1M
‒ 1 remaining Milestone is on schedule 
‒ 100% of customer requests in March were responded to by 
FDOT/OCEI team within 24hrs 
• Road Ranger Services: 100% customer satisfaction rating for Q4 of 2012
• Severe Incident Response Vehicle (SIRV) and Rapid Incident Scene 
Clearance (RISC) Operations
• Traffic Management Center Operations: 24/7 – 365
• Scheduled Completion Date: Spring 2014
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
UNIVERSITY DRIVE FLYOVER RECONSTRUCTION
I‐595 Express Corridor Improvements Project
THANK YOU!
For additional project information, please visit:
www.i‐595.com

Más contenido relacionado

Destacado

Risks & Advantages of P3 Projects by Sid Scott, Hill International
Risks & Advantages of P3 Projects by Sid Scott, Hill InternationalRisks & Advantages of P3 Projects by Sid Scott, Hill International
Risks & Advantages of P3 Projects by Sid Scott, Hill InternationalRoland_Nikles
 
Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)AGC of California
 
Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014Fairfax County
 
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...Fairfax County
 
Oakland Global TIGER III Presentation
Oakland Global TIGER III PresentationOakland Global TIGER III Presentation
Oakland Global TIGER III PresentationMMorodomi
 
PWF March 2015 color
PWF March 2015 colorPWF March 2015 color
PWF March 2015 colorBryan Kendro
 
Public-Private Partnership Modeling and Legal Analysis - New York
Public-Private Partnership Modeling and Legal Analysis - New YorkPublic-Private Partnership Modeling and Legal Analysis - New York
Public-Private Partnership Modeling and Legal Analysis - New Yorkmmanongdo
 
COURTNEY CUNNINGHAM - Florida's High Speed Rail Opportunity
COURTNEY CUNNINGHAM - Florida's High Speed Rail OpportunityCOURTNEY CUNNINGHAM - Florida's High Speed Rail Opportunity
COURTNEY CUNNINGHAM - Florida's High Speed Rail Opportunitycourtneycunninghammiami
 
Fairfax Connector Riders Advisory Committee (RAC)
Fairfax Connector Riders Advisory Committee (RAC)Fairfax Connector Riders Advisory Committee (RAC)
Fairfax Connector Riders Advisory Committee (RAC)Fairfax County
 
How to Design Compelling Content Experiences
How to Design Compelling Content ExperiencesHow to Design Compelling Content Experiences
How to Design Compelling Content ExperiencesUberflip
 
How to Perfect Your Pitch
How to Perfect Your Pitch How to Perfect Your Pitch
How to Perfect Your Pitch Guy Kawasaki
 
Oh! The Places You Will Go! Digital Pedagogy Inspired by Dr. Seuss
Oh! The Places You Will Go! Digital Pedagogy Inspired by Dr. SeussOh! The Places You Will Go! Digital Pedagogy Inspired by Dr. Seuss
Oh! The Places You Will Go! Digital Pedagogy Inspired by Dr. SeussShelly Sanchez Terrell
 

Destacado (14)

Risks & Advantages of P3 Projects by Sid Scott, Hill International
Risks & Advantages of P3 Projects by Sid Scott, Hill InternationalRisks & Advantages of P3 Projects by Sid Scott, Hill International
Risks & Advantages of P3 Projects by Sid Scott, Hill International
 
Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)
 
Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014
 
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
Dulles Metrorail Silver Line: Status Report and Transportation Infrastructure...
 
Federal transportation funding and innovations
Federal transportation funding and innovationsFederal transportation funding and innovations
Federal transportation funding and innovations
 
Oakland Global TIGER III Presentation
Oakland Global TIGER III PresentationOakland Global TIGER III Presentation
Oakland Global TIGER III Presentation
 
Oakland dac
Oakland dacOakland dac
Oakland dac
 
PWF March 2015 color
PWF March 2015 colorPWF March 2015 color
PWF March 2015 color
 
Public-Private Partnership Modeling and Legal Analysis - New York
Public-Private Partnership Modeling and Legal Analysis - New YorkPublic-Private Partnership Modeling and Legal Analysis - New York
Public-Private Partnership Modeling and Legal Analysis - New York
 
COURTNEY CUNNINGHAM - Florida's High Speed Rail Opportunity
COURTNEY CUNNINGHAM - Florida's High Speed Rail OpportunityCOURTNEY CUNNINGHAM - Florida's High Speed Rail Opportunity
COURTNEY CUNNINGHAM - Florida's High Speed Rail Opportunity
 
Fairfax Connector Riders Advisory Committee (RAC)
Fairfax Connector Riders Advisory Committee (RAC)Fairfax Connector Riders Advisory Committee (RAC)
Fairfax Connector Riders Advisory Committee (RAC)
 
How to Design Compelling Content Experiences
How to Design Compelling Content ExperiencesHow to Design Compelling Content Experiences
How to Design Compelling Content Experiences
 
How to Perfect Your Pitch
How to Perfect Your Pitch How to Perfect Your Pitch
How to Perfect Your Pitch
 
Oh! The Places You Will Go! Digital Pedagogy Inspired by Dr. Seuss
Oh! The Places You Will Go! Digital Pedagogy Inspired by Dr. SeussOh! The Places You Will Go! Digital Pedagogy Inspired by Dr. Seuss
Oh! The Places You Will Go! Digital Pedagogy Inspired by Dr. Seuss
 

Similar a 2.3 i 595 improvements

RV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
RV 2014: Public Private Partnerships: The P3 Experience by Gregory BenzRV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
RV 2014: Public Private Partnerships: The P3 Experience by Gregory BenzRail~Volution
 
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27Roland_Nikles
 
Dd P3 Wkshp Procurement Schedule Key Issues 0709
Dd P3 Wkshp Procurement Schedule Key Issues 0709Dd P3 Wkshp Procurement Schedule Key Issues 0709
Dd P3 Wkshp Procurement Schedule Key Issues 0709anxora
 
General Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC ConferenceGeneral Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC ConferenceAGC of California
 
VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...
VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...
VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...Fairfax County
 
Resume LIMA, Robson
Resume LIMA, RobsonResume LIMA, Robson
Resume LIMA, RobsonRobson Lima
 
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...AamerShakoor
 
Private and Public Partnerships Move Mainstream
Private and Public Partnerships Move MainstreamPrivate and Public Partnerships Move Mainstream
Private and Public Partnerships Move MainstreamKerry Carey
 

Similar a 2.3 i 595 improvements (11)

RV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
RV 2014: Public Private Partnerships: The P3 Experience by Gregory BenzRV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
RV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
 
golden glades multimodal facility-truck travel center
golden glades multimodal facility-truck travel centergolden glades multimodal facility-truck travel center
golden glades multimodal facility-truck travel center
 
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
Aba forum division_4_aurora_light_rail_presentation_shresta_2012_11_27
 
Dd P3 Wkshp Procurement Schedule Key Issues 0709
Dd P3 Wkshp Procurement Schedule Key Issues 0709Dd P3 Wkshp Procurement Schedule Key Issues 0709
Dd P3 Wkshp Procurement Schedule Key Issues 0709
 
General Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC ConferenceGeneral Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC Conference
 
sr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e studysr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e study
 
VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...
VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...
VDOT: Fairfax County Board of Supervisors Transportation Committee: Dec. 13, ...
 
Resume LIMA, Robson
Resume LIMA, RobsonResume LIMA, Robson
Resume LIMA, Robson
 
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
Alberta Transportation's First Design-Build (DB) Project - Stony Plain Road I...
 
Private and Public Partnerships Move Mainstream
Private and Public Partnerships Move MainstreamPrivate and Public Partnerships Move Mainstream
Private and Public Partnerships Move Mainstream
 
Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19Crosstown apwa presentation2016 04-19
Crosstown apwa presentation2016 04-19
 

Más de ascemiami-dade

Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...ascemiami-dade
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...ascemiami-dade
 
K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectascemiami-dade
 
2.4 fll airport improvements
2.4 fll airport improvements2.4 fll airport improvements
2.4 fll airport improvementsascemiami-dade
 
K.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progressionK.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progressionascemiami-dade
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...ascemiami-dade
 
2.3 i 595 improvements
2.3 i 595 improvements2.3 i 595 improvements
2.3 i 595 improvementsascemiami-dade
 
3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...ascemiami-dade
 
3.2 wpb transit village
3.2 wpb transit village3.2 wpb transit village
3.2 wpb transit villageascemiami-dade
 
3.3 everglades restoration plans
3.3 everglades restoration plans3.3 everglades restoration plans
3.3 everglades restoration plansascemiami-dade
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
 
2.1 port of miami tunnel cei
2.1 port of miami tunnel cei2.1 port of miami tunnel cei
2.1 port of miami tunnel ceiascemiami-dade
 
1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoir1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoirascemiami-dade
 
1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoir1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoirascemiami-dade
 

Más de ascemiami-dade (20)

Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
Joint fsawwa region vii asce-ewri pipeline rehabilitation presentation ro 11-...
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...
 
K.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 projectK.1 turkey point units 6 & 7 project
K.1 turkey point units 6 & 7 project
 
2.4 fll airport improvements
2.4 fll airport improvements2.4 fll airport improvements
2.4 fll airport improvements
 
K.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progressionK.2 vogtle units 3 and 4 nuclear development early site construction progression
K.2 vogtle units 3 and 4 nuclear development early site construction progression
 
3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...3.1 defining level of service based on dynamic environmental, economic, and s...
3.1 defining level of service based on dynamic environmental, economic, and s...
 
2.3 i 595 improvements
2.3 i 595 improvements2.3 i 595 improvements
2.3 i 595 improvements
 
4 public policy panel
4   public policy panel4   public policy panel
4 public policy panel
 
3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...3.4 northern everglades payment for environmental services a public private p...
3.4 northern everglades payment for environmental services a public private p...
 
4 cards
4   cards4   cards
4 cards
 
3.2 wpb transit village
3.2 wpb transit village3.2 wpb transit village
3.2 wpb transit village
 
3.3 everglades restoration plans
3.3 everglades restoration plans3.3 everglades restoration plans
3.3 everglades restoration plans
 
3 climate change
3   climate change3   climate change
3 climate change
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
 
2.1 port of miami tunnel cei
2.1 port of miami tunnel cei2.1 port of miami tunnel cei
2.1 port of miami tunnel cei
 
1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoir1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoir
 
2 transportation
2   transportation2   transportation
2 transportation
 
1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoir1.4 l 8 feb and c51 reservoir
1.4 l 8 feb and c51 reservoir
 
1.3 pbcwud update
1.3 pbcwud update1.3 pbcwud update
1.3 pbcwud update
 

Último

Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Kaya Weers
 
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Jeffrey Haguewood
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 
All These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDFAll These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDFMichael Gough
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesKari Kakkonen
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxfnnc6jmgwh
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
4. Cobus Valentine- Cybersecurity Threats and Solutions for the Public Sector
4. Cobus Valentine- Cybersecurity Threats and Solutions for the Public Sector4. Cobus Valentine- Cybersecurity Threats and Solutions for the Public Sector
4. Cobus Valentine- Cybersecurity Threats and Solutions for the Public Sectoritnewsafrica
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integrationmarketing932765
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical InfrastructureVarsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructureitnewsafrica
 
Kuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialKuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialJoão Esperancinha
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observabilityitnewsafrica
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesThousandEyes
 
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)Mark Simos
 

Último (20)

Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)
 
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 
All These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDFAll These Sophisticated Attacks, Can We Really Detect Them - PDF
All These Sophisticated Attacks, Can We Really Detect Them - PDF
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examples
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
4. Cobus Valentine- Cybersecurity Threats and Solutions for the Public Sector
4. Cobus Valentine- Cybersecurity Threats and Solutions for the Public Sector4. Cobus Valentine- Cybersecurity Threats and Solutions for the Public Sector
4. Cobus Valentine- Cybersecurity Threats and Solutions for the Public Sector
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical InfrastructureVarsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
Varsha Sewlal- Cyber Attacks on Critical Critical Infrastructure
 
Kuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorialKuma Meshes Part I - The basics - A tutorial
Kuma Meshes Part I - The basics - A tutorial
 
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
 
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
Tampa BSides - The No BS SOC (slides from April 6, 2024 talk)
 

2.3 i 595 improvements