Enviar búsqueda
Cargar
Whats Really New In Simplified Dbr Schragenheim Weisenstern
•
2 recomendaciones
•
743 vistas
Advance Operations Management School srl
Seguir
TOC1
Leer menos
Leer más
Denunciar
Compartir
Denunciar
Compartir
1 de 41
Descargar ahora
Descargar para leer sin conexión
Recomendados
How To Create and Package Irresistible Content (aka Mafia Offers)
How To Create and Package Irresistible Content (aka Mafia Offers)
Kavit Haria
Taller sobre el manejo y resolución de conflictos familiaresx
Taller sobre el manejo y resolución de conflictos familiaresx
mariapandoluzuriaga
Building mafia offers for smbs
Building mafia offers for smbs
Versli Lietuva (Enterprise Lithuania)
Theory Of Constraints 2
Theory Of Constraints 2
MOHD ARISH
Programa curso de "Escritores de Discursos con PNL e Inteligencia Emocional"
Programa curso de "Escritores de Discursos con PNL e Inteligencia Emocional"
Monica Perez de las Heras
Alta dirección: Pensamiento sistémico para la alta dirección.
Alta dirección: Pensamiento sistémico para la alta dirección.
Héctor Debernardo
Programa curso "Gestión en Tiempos de Incertidumbre"
Programa curso "Gestión en Tiempos de Incertidumbre"
Monica Perez de las Heras
How to prepare mafia offers under lithuanian circumstances (red)
How to prepare mafia offers under lithuanian circumstances (red)
Versli Lietuva (Enterprise Lithuania)
Recomendados
How To Create and Package Irresistible Content (aka Mafia Offers)
How To Create and Package Irresistible Content (aka Mafia Offers)
Kavit Haria
Taller sobre el manejo y resolución de conflictos familiaresx
Taller sobre el manejo y resolución de conflictos familiaresx
mariapandoluzuriaga
Building mafia offers for smbs
Building mafia offers for smbs
Versli Lietuva (Enterprise Lithuania)
Theory Of Constraints 2
Theory Of Constraints 2
MOHD ARISH
Programa curso de "Escritores de Discursos con PNL e Inteligencia Emocional"
Programa curso de "Escritores de Discursos con PNL e Inteligencia Emocional"
Monica Perez de las Heras
Alta dirección: Pensamiento sistémico para la alta dirección.
Alta dirección: Pensamiento sistémico para la alta dirección.
Héctor Debernardo
Programa curso "Gestión en Tiempos de Incertidumbre"
Programa curso "Gestión en Tiempos de Incertidumbre"
Monica Perez de las Heras
How to prepare mafia offers under lithuanian circumstances (red)
How to prepare mafia offers under lithuanian circumstances (red)
Versli Lietuva (Enterprise Lithuania)
B2B Growth Hacking: How to build a Growth Engine in B2B
B2B Growth Hacking: How to build a Growth Engine in B2B
Vladimir Blagojevic
Autodesarrollo del liderazgo
Autodesarrollo del liderazgo
Juan Jose Romero Crusat
Webinar Planificación Estratégica usando el Thinking Process (TOC)
Webinar Planificación Estratégica usando el Thinking Process (TOC)
Qualiplus
Trabajo en equipo y toc
Trabajo en equipo y toc
Jesus Garcia
Social Entrepreneurship
Social Entrepreneurship
Shyamsunder Panchavati
TOC for Education
TOC for Education
mcmoonitz
Capacitacion Empresarial TOC
Capacitacion Empresarial TOC
Estrategia Focalizada
Versión reducida de "Luz, cámara... TOC!. Una manera entretenida de aprender ...
Versión reducida de "Luz, cámara... TOC!. Una manera entretenida de aprender ...
Héctor Debernardo
Team Trust Canvas eng
Team Trust Canvas eng
Alexey Pikulev
The 3 Layers of Logic
The 3 Layers of Logic
HumbertoRB
Conflict resolution diagram tutorial
Conflict resolution diagram tutorial
AgileCoach.net
Book Summary of Contagious: Why Things Catch On by Jonah Berger
Book Summary of Contagious: Why Things Catch On by Jonah Berger
Amir Mohammad Redzuan
Aplicabilidad de la teoria de restricciones en las empresas
Aplicabilidad de la teoria de restricciones en las empresas
Wilmar Franco
Cómo gamificar un curso (Taller en MoodleMoot Colombia 2014)
Cómo gamificar un curso (Taller en MoodleMoot Colombia 2014)
Fernando Santamaría
How to Overcome Your Fear of Failure
How to Overcome Your Fear of Failure
Faisal Hoque
The State of My Industry
The State of My Industry
LinkedIn Editors' Picks
“Achieving Mine to Market Throughput” – Iluka South West Operations – Case...
“Achieving Mine to Market Throughput” – Iluka South West Operations – Case...
Robert Bolton
Supply chain logistic review by lisa ferguson
Supply chain logistic review by lisa ferguson
Utkan Uluçay, MSc., CDDP
Newparadigmdigitaloilfield
Newparadigmdigitaloilfield
Nick Warren CEng FIChemE FCMI
Retail toc get your hands dirty in the implementation - humberto baptista v1.0
Retail toc get your hands dirty in the implementation - humberto baptista v1.0
HumbertoRB
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
Nitin Sethi
Book Review-Toyota Production System
Book Review-Toyota Production System
Karthick Parasumanna Janardanan
Más contenido relacionado
Destacado
B2B Growth Hacking: How to build a Growth Engine in B2B
B2B Growth Hacking: How to build a Growth Engine in B2B
Vladimir Blagojevic
Autodesarrollo del liderazgo
Autodesarrollo del liderazgo
Juan Jose Romero Crusat
Webinar Planificación Estratégica usando el Thinking Process (TOC)
Webinar Planificación Estratégica usando el Thinking Process (TOC)
Qualiplus
Trabajo en equipo y toc
Trabajo en equipo y toc
Jesus Garcia
Social Entrepreneurship
Social Entrepreneurship
Shyamsunder Panchavati
TOC for Education
TOC for Education
mcmoonitz
Capacitacion Empresarial TOC
Capacitacion Empresarial TOC
Estrategia Focalizada
Versión reducida de "Luz, cámara... TOC!. Una manera entretenida de aprender ...
Versión reducida de "Luz, cámara... TOC!. Una manera entretenida de aprender ...
Héctor Debernardo
Team Trust Canvas eng
Team Trust Canvas eng
Alexey Pikulev
The 3 Layers of Logic
The 3 Layers of Logic
HumbertoRB
Conflict resolution diagram tutorial
Conflict resolution diagram tutorial
AgileCoach.net
Book Summary of Contagious: Why Things Catch On by Jonah Berger
Book Summary of Contagious: Why Things Catch On by Jonah Berger
Amir Mohammad Redzuan
Aplicabilidad de la teoria de restricciones en las empresas
Aplicabilidad de la teoria de restricciones en las empresas
Wilmar Franco
Cómo gamificar un curso (Taller en MoodleMoot Colombia 2014)
Cómo gamificar un curso (Taller en MoodleMoot Colombia 2014)
Fernando Santamaría
How to Overcome Your Fear of Failure
How to Overcome Your Fear of Failure
Faisal Hoque
The State of My Industry
The State of My Industry
LinkedIn Editors' Picks
Destacado
(16)
B2B Growth Hacking: How to build a Growth Engine in B2B
B2B Growth Hacking: How to build a Growth Engine in B2B
Autodesarrollo del liderazgo
Autodesarrollo del liderazgo
Webinar Planificación Estratégica usando el Thinking Process (TOC)
Webinar Planificación Estratégica usando el Thinking Process (TOC)
Trabajo en equipo y toc
Trabajo en equipo y toc
Social Entrepreneurship
Social Entrepreneurship
TOC for Education
TOC for Education
Capacitacion Empresarial TOC
Capacitacion Empresarial TOC
Versión reducida de "Luz, cámara... TOC!. Una manera entretenida de aprender ...
Versión reducida de "Luz, cámara... TOC!. Una manera entretenida de aprender ...
Team Trust Canvas eng
Team Trust Canvas eng
The 3 Layers of Logic
The 3 Layers of Logic
Conflict resolution diagram tutorial
Conflict resolution diagram tutorial
Book Summary of Contagious: Why Things Catch On by Jonah Berger
Book Summary of Contagious: Why Things Catch On by Jonah Berger
Aplicabilidad de la teoria de restricciones en las empresas
Aplicabilidad de la teoria de restricciones en las empresas
Cómo gamificar un curso (Taller en MoodleMoot Colombia 2014)
Cómo gamificar un curso (Taller en MoodleMoot Colombia 2014)
How to Overcome Your Fear of Failure
How to Overcome Your Fear of Failure
The State of My Industry
The State of My Industry
Similar a Whats Really New In Simplified Dbr Schragenheim Weisenstern
“Achieving Mine to Market Throughput” – Iluka South West Operations – Case...
“Achieving Mine to Market Throughput” – Iluka South West Operations – Case...
Robert Bolton
Supply chain logistic review by lisa ferguson
Supply chain logistic review by lisa ferguson
Utkan Uluçay, MSc., CDDP
Newparadigmdigitaloilfield
Newparadigmdigitaloilfield
Nick Warren CEng FIChemE FCMI
Retail toc get your hands dirty in the implementation - humberto baptista v1.0
Retail toc get your hands dirty in the implementation - humberto baptista v1.0
HumbertoRB
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
Nitin Sethi
Book Review-Toyota Production System
Book Review-Toyota Production System
Karthick Parasumanna Janardanan
Dermarkar
Dermarkar
hernandezgerardo
Boeing - Reliability Centered Maintenance
Boeing - Reliability Centered Maintenance
Nandhagopal Muralithar
Using sdbr in rapid response project
Using sdbr in rapid response project
Utkan Uluçay, MSc., CDDP
Decc investor simulation workshop intro presentation_v 1
Decc investor simulation workshop intro presentation_v 1
Department of Energy and Climate Change
Innovation as a Necessity in the UK Water Sector
Innovation as a Necessity in the UK Water Sector
James Dunning
Enabling product personalisation using Apache Kafka, Apache Pinot and Trino w...
Enabling product personalisation using Apache Kafka, Apache Pinot and Trino w...
HostedbyConfluent
Lubricants and Greases Manufacturing Plants
Lubricants and Greases Manufacturing Plants
Eko Kiswanto
Week 3 & 4 DND (NETWORK DESIGN IN THE SUPPLY CHAIN).pptx
Week 3 & 4 DND (NETWORK DESIGN IN THE SUPPLY CHAIN).pptx
Aznain Dogar
Synchronized manufacturing training
Synchronized manufacturing training
TonyEMadison
Synchronized Manufacturing Training
Synchronized Manufacturing Training
TonyEMadison
Commodity profile strategy
Commodity profile strategy
Rachmat Abubakar
CS Offshore Project
CS Offshore Project
Pradeep Balakrishnan Thampi
Bpcl final implementation -uVs
Bpcl final implementation -uVs
Utkarsh Vashistha
Supply chain management
Supply chain management
ARif Khan
Similar a Whats Really New In Simplified Dbr Schragenheim Weisenstern
(20)
“Achieving Mine to Market Throughput” – Iluka South West Operations – Case...
“Achieving Mine to Market Throughput” – Iluka South West Operations – Case...
Supply chain logistic review by lisa ferguson
Supply chain logistic review by lisa ferguson
Newparadigmdigitaloilfield
Newparadigmdigitaloilfield
Retail toc get your hands dirty in the implementation - humberto baptista v1.0
Retail toc get your hands dirty in the implementation - humberto baptista v1.0
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
Book Review-Toyota Production System
Book Review-Toyota Production System
Dermarkar
Dermarkar
Boeing - Reliability Centered Maintenance
Boeing - Reliability Centered Maintenance
Using sdbr in rapid response project
Using sdbr in rapid response project
Decc investor simulation workshop intro presentation_v 1
Decc investor simulation workshop intro presentation_v 1
Innovation as a Necessity in the UK Water Sector
Innovation as a Necessity in the UK Water Sector
Enabling product personalisation using Apache Kafka, Apache Pinot and Trino w...
Enabling product personalisation using Apache Kafka, Apache Pinot and Trino w...
Lubricants and Greases Manufacturing Plants
Lubricants and Greases Manufacturing Plants
Week 3 & 4 DND (NETWORK DESIGN IN THE SUPPLY CHAIN).pptx
Week 3 & 4 DND (NETWORK DESIGN IN THE SUPPLY CHAIN).pptx
Synchronized manufacturing training
Synchronized manufacturing training
Synchronized Manufacturing Training
Synchronized Manufacturing Training
Commodity profile strategy
Commodity profile strategy
CS Offshore Project
CS Offshore Project
Bpcl final implementation -uVs
Bpcl final implementation -uVs
Supply chain management
Supply chain management
Más de Advance Operations Management School srl
Applicare concretamente la metodologia Lean per ridurre le scorte senza impat...
Applicare concretamente la metodologia Lean per ridurre le scorte senza impat...
Advance Operations Management School srl
Webinar operational excellence 28 july last - Case study Samsonite - Advance ...
Webinar operational excellence 28 july last - Case study Samsonite - Advance ...
Advance Operations Management School srl
Leadership nell'industria - Live Webinar Advance School
Leadership nell'industria - Live Webinar Advance School
Advance Operations Management School srl
Six Sigma Eliminare la difettosità e garantire il time to market
Six Sigma Eliminare la difettosità e garantire il time to market
Advance Operations Management School srl
Demand Driven MRP - Come implementarlo con successo in azienda
Demand Driven MRP - Come implementarlo con successo in azienda
Advance Operations Management School srl
Top Workshop - Come impostare i parametri MRP/MPS su SAP
Top Workshop - Come impostare i parametri MRP/MPS su SAP
Advance Operations Management School srl
Lean Six Sigma: Best Practice per gestire la performance - Manager a confronto
Lean Six Sigma: Best Practice per gestire la performance - Manager a confronto
Advance Operations Management School srl
Mettere i fornitori al centro dell'azienda
Mettere i fornitori al centro dell'azienda
Advance Operations Management School srl
BIQ, Built in Quality- verso la Lean Transformation - CAT
BIQ, Built in Quality- verso la Lean Transformation - CAT
Advance Operations Management School srl
Articolo lean manufacturing in Italia
Articolo lean manufacturing in Italia
Advance Operations Management School srl
Western LEAN -Evolution
Western LEAN -Evolution
Advance Operations Management School srl
Automated Receiving System - A. Caradonna - J&J - Workshop Supply Chain Unin...
Automated Receiving System - A. Caradonna - J&J - Workshop Supply Chain Unin...
Advance Operations Management School srl
Space hunters 14 07 15 Pfizer - Workshop Unindustria AD-net
Space hunters 14 07 15 Pfizer - Workshop Unindustria AD-net
Advance Operations Management School srl
ll vantaggio competitivo derivante dall’inserimento di nuovi fornitori estern...
ll vantaggio competitivo derivante dall’inserimento di nuovi fornitori estern...
Advance Operations Management School srl
CIRCOR S&OP with Suppliers_ 19 feb_2015
CIRCOR S&OP with Suppliers_ 19 feb_2015
Advance Operations Management School srl
ST- Turning supply chain disruptions into a competitive advantage
ST- Turning supply chain disruptions into a competitive advantage
Advance Operations Management School srl
Presentation_TOC_2_december_Vettor_CUOA
Presentation_TOC_2_december_Vettor_CUOA
Advance Operations Management School srl
Lean a commessa_a_gatto_ottobre_2014
Lean a commessa_a_gatto_ottobre_2014
Advance Operations Management School srl
Articolo daloiso informatizzazione_magazzino_set_2014
Articolo daloiso informatizzazione_magazzino_set_2014
Advance Operations Management School srl
Articolo Mari rating-fornitori_ad-net_giugno_2014
Articolo Mari rating-fornitori_ad-net_giugno_2014
Advance Operations Management School srl
Más de Advance Operations Management School srl
(20)
Applicare concretamente la metodologia Lean per ridurre le scorte senza impat...
Applicare concretamente la metodologia Lean per ridurre le scorte senza impat...
Webinar operational excellence 28 july last - Case study Samsonite - Advance ...
Webinar operational excellence 28 july last - Case study Samsonite - Advance ...
Leadership nell'industria - Live Webinar Advance School
Leadership nell'industria - Live Webinar Advance School
Six Sigma Eliminare la difettosità e garantire il time to market
Six Sigma Eliminare la difettosità e garantire il time to market
Demand Driven MRP - Come implementarlo con successo in azienda
Demand Driven MRP - Come implementarlo con successo in azienda
Top Workshop - Come impostare i parametri MRP/MPS su SAP
Top Workshop - Come impostare i parametri MRP/MPS su SAP
Lean Six Sigma: Best Practice per gestire la performance - Manager a confronto
Lean Six Sigma: Best Practice per gestire la performance - Manager a confronto
Mettere i fornitori al centro dell'azienda
Mettere i fornitori al centro dell'azienda
BIQ, Built in Quality- verso la Lean Transformation - CAT
BIQ, Built in Quality- verso la Lean Transformation - CAT
Articolo lean manufacturing in Italia
Articolo lean manufacturing in Italia
Western LEAN -Evolution
Western LEAN -Evolution
Automated Receiving System - A. Caradonna - J&J - Workshop Supply Chain Unin...
Automated Receiving System - A. Caradonna - J&J - Workshop Supply Chain Unin...
Space hunters 14 07 15 Pfizer - Workshop Unindustria AD-net
Space hunters 14 07 15 Pfizer - Workshop Unindustria AD-net
ll vantaggio competitivo derivante dall’inserimento di nuovi fornitori estern...
ll vantaggio competitivo derivante dall’inserimento di nuovi fornitori estern...
CIRCOR S&OP with Suppliers_ 19 feb_2015
CIRCOR S&OP with Suppliers_ 19 feb_2015
ST- Turning supply chain disruptions into a competitive advantage
ST- Turning supply chain disruptions into a competitive advantage
Presentation_TOC_2_december_Vettor_CUOA
Presentation_TOC_2_december_Vettor_CUOA
Lean a commessa_a_gatto_ottobre_2014
Lean a commessa_a_gatto_ottobre_2014
Articolo daloiso informatizzazione_magazzino_set_2014
Articolo daloiso informatizzazione_magazzino_set_2014
Articolo Mari rating-fornitori_ad-net_giugno_2014
Articolo Mari rating-fornitori_ad-net_giugno_2014
Whats Really New In Simplified Dbr Schragenheim Weisenstern
1.
What’s really new
in Simplified DBR? TOCICO 2006 Conference Eli Schragenheim Amir Weisenstern Amir Schragenheim © 2006 TOCICO. All rights reserved. 1
2.
The good old
DBR TOCICO 2006 Conference • DBR was developed in the mid 80s as a relatively simple, yet effective, production planning methodology. • DBR centers on detailed finite capacity scheduling of the capacity resource constraint (CCR). • DBR was developed under the assumption of getting orders from the sales, without truly impacting the committed dates, and coming up with the best planning possible under the circumstances. 2 © 2006 TOCICO. All rights reserved.
3.
The main benefits
of scheduling the CCR that we do not want to lose TOCICO 2006 Conference 1. Being able to tie the Rope so that the CCR will not starve and will not waste its capacity • Exploiting the CCR capacity 2. Being able to know whether the delivery dates, which we get from Sales, are safe • Proper subordination to the market 3. Smooth the load on the whole shop to prevent from too large temporary peaks of load • Enabling the full subordination of the non-constraints 3 © 2006 TOCICO. All rights reserved.
4.
Finite capacity scheduling
of the CCR Is the focus absolutely right? TOCICO 2006 Conference • The focus of Operations is on the exploitation of the capacity of the CCR − Many times it leads to problematic subordination to the market − Orders that have relatively low T/CU are pushed forward in time − The identity of the client and the impact on the reputation are not always taken into consideration − There is a huge difficulty to deal with urgent orders − A policy of “adherence to the CCR schedule” makes it difficult to enter changes caused by customers who have new priorities − The result is that the response to the market demand lacks flexibility 4 © 2006 TOCICO. All rights reserved.
5.
Finite capacity scheduling
of the CCR Is it right for make-to-stock? TOCICO 2006 Conference • The need for better flexibility is especially noted in orders that are made to stock − Because the true priority of a stock order is not known at the time of the scheduling − The priority of stock orders depends on the finished goods stock versus the demand. This could change in a day • The current practice is to assign a date to the stock order and then base the CCR schedule on that date, like any make-to-order − The date is based on forecast − Many times the derived priorities of the schedule are wrong 5 © 2006 TOCICO. All rights reserved.
6.
Finite capacity scheduling
of the CCR Three buffers to maintain TOCICO 2006 Conference • The CCR detailed schedule forces three different buffers to be implemented, without good priority mechanism between them − The Shipping Buffer protects the due-dates − The CCR Buffer protects the detailed schedule − The Assembly Buffer – controls the material release of non-CCR parts − What does it really protect? Isn’t it just an extension of the shipping buffer? 6 © 2006 TOCICO. All rights reserved.
7.
Finite capacity scheduling
of the CCR not always simple TOCICO 2006 Conference • In certain cases the finite capacity scheduling of the CCR is especially complex − Depended setups and other technical limitations that forbid certain sequences − Time-per-batch operations, like ovens, that work on several orders together provided certain conditions apply to all orders − Many machines, which are NOT identical, are the CCR − CCR operations that feed other CCR operations • Very few, if at all, existing DBR program can handle those complexities 7 © 2006 TOCICO. All rights reserved.
8.
When one is
used to focus on the one CCR TOCICO 2006 Conference • When the market fluctuates, even a real CCR should have periods of low load − Thus, at those times the constraint is just the market − Should we still focus on the CCR also at those times? • Sometimes the CCR shifts from one resource to another − It could be because Sales took T/CU too seriously − The equilibrium is jeopardized – all the subordination processes change − A lot of data has to be checked, maintained and fed into the DBR software − Note especially that all the buffers change! 8 © 2006 TOCICO. All rights reserved.
9.
Current practice of
coping with the negatives TOCICO 2006 Conference • Frequent re-scheduling − Thus considering the most updated information − Alas, new problems rise from re-scheduling − A local change causes a significant change all over: − Dates promised are not safe − Frequent changes to the material release schedule could cause chaos and inferior confidence in the planning − A lot of reporting needs to be done accurately between re-scheduling 9 © 2006 TOCICO. All rights reserved.
10.
Some Key Observations
TOCICO 2006 Conference • The market demand is a major constraint even when a capacity constraint resource is active − Failing to subordinate to the market could lead to a significant dive down of the market demand − Elevating the internal constraint won’t improve anything unless the market demand is elevated as well • In such a case how do we exploit both constraints? − Not disappointing the market − Not losing too much precious capacity of the CCR 10 © 2006 TOCICO. All rights reserved.
11.
The initial direction
of the solution: the basic SDBR TOCICO 2006 Conference • As the market is the major constraint, let’s protect the market with just the shipping buffer − All materials are released based on due-date minus the shipping buffer − The sequence at the CCR is not planned • The less detailed is the planning the more critical is the quality of the decisions taken at the execution • The role of the execution control is now critical: dictating the right priorities on the floor 11 © 2006 TOCICO. All rights reserved.
12.
The initial direction
of the solution: More focus on buffer management TOCICO 2006 Conference • Generally speaking every single order is given enough time to flow through the shop floor • The Rope ensures that only orders to be delivered within the shipping buffer time are released to the floor • At each work center, including the CCR, the sensible decision which order to do next depends on the state of the buffers of the relevant orders • Definition: the buffer status of the order is the percentage of the buffer consumed • The higher the buffer status is the higher the priority of the order 12 © 2006 TOCICO. All rights reserved.
13.
The benefits of
the SDBR direction TOCICO 2006 Conference • Simpler to implement • Having just one buffer makes the priority list clear at all times • Maintaining much more flexibility to meet the changing requirements of the clients • Signals clearly that the major constraint is the market demand, thus even the CCR should subordinate to it 13 © 2006 TOCICO. All rights reserved.
14.
Concerns / negative
branches of SDBR TOCICO 2006 Conference 1. Failing to exploit the capacity of the CCR 2. Overloading the CCR, thus causing disruption of the due-date performance 3. Maintaining too large buffers, causing some materials to be released too soon • This is the least concerning NBR and we won’t discuss it Do we agree so far? Are the above your main concerns? 14 © 2006 TOCICO. All rights reserved.
15.
A common basic
conflict to consider TOCICO 2006 Conference B D Ensure smooth Implement a very execution and simple solution implementation A Have a successful By how much the results would be compromised working solution using the simple Conflict in place solution? C D’ Implement a Draw the best results sophisticated out of the solution solution 15 © 2006 TOCICO. All rights reserved.
16.
Failing to exploit
the CCR capacity TOCICO 2006 Conference • Three types of miss-exploitation of the CCR 1. Starvation, meaning there is enough planned work for the CCR to do, but none of it is ready at the CCR at this time 2. The sequence at which the work arrives to the CCR forces waste of capacity of the CCR 3. The CCR works on things that are not truly needed • The third type is controlled by the master production schedule, not by the CCR schedule • The second type is relevant only when dependent setups have a major impact − In that case we need to come back to DBR, with some changes Let’s concentrate on how to prevent starvation in SDBR 16 © 2006 TOCICO. All rights reserved.
17.
Preventing starvation in
SDBR TOCICO 2006 Conference • When the market demand is recognized as the major constraint, we expect that even the CCR be able to subordinate to the market − Ensure excellent due-date performance, even when Murphy hits the CCR itself − Be able to respond within the tolerance of the market − All the above make it necessary to maintain some protected capacity of the CCR itself − Hence, some very limited starvation does not impact the profit • The shipping buffer is usually long enough to provide enough WIP at the weakest link (the CCR) − Assuming the RoadRunner ethics is in place • The work at the CCR should be monitored daily 17 © 2006 TOCICO. All rights reserved.
18.
Facing the second
concern: overloading the CCR TOCICO 2006 Conference • Definition: Planned load is the accumulation of the derived load on the CCR (the weakest link) of all the firm orders that have to be delivered within a certain horizon of time • The planned load is a number of hours/days − it is NOT a description of the spread of the load over time − Suppose we have only three orders in the backlog, estimated CCR time are: 50, 125 and 55 hours − The planned load is 230 hours − The sequence is not determined 18 © 2006 TOCICO. All rights reserved.
19.
What does the
planned load tell us? TOCICO 2006 Conference • The planned load is a rough estimation of the time when the specific resource would be able to work on a new order − Assuming the resource is able to work all the time without starvation − Assuming the new order has no special priority relative to the other orders • When we monitor the planned load of the CCR we get a pretty good idea of the lead time − The planned load plus enough safety for the downstream operations 19 © 2006 TOCICO. All rights reserved.
20.
An example: what
do we know on the environment just from what we see? TOCICO 2006 Conference • The red bar shows the planned load of 192 hours of CCR work • The green bar shows the orders already reside at the CCR site • This information is harder to get • We can easily assume the minimum safe lead time for a new order is around 240 working hours from now • Assuming 40 plus hours are more than enough from the CCR to completion • Assuming the new order could easily reach the CCR in 192 hours 20 © 2006 TOCICO. All rights reserved.
21.
The difference between
a finite-capacity schedule and the planned load TOCICO 2006 Conference • On the face of it the planned load is a schedule − It is similar to “forward loading” process − But, there is no sophistication in the sequence of orders − No efforts are done to validate the material would really arrive to the CCR on the time predicted by the planned load − The planned load should not be treated as a schedule – it should not dictate any sequence the operator has to follow • The most important asset of the planned load is the rough determination of the time a new order has to wait for the CCR 21 © 2006 TOCICO. All rights reserved.
22.
Dealing with the
overloading concern TOCICO 2006 Conference • The planned load of the CCR, at any given time, should be compared to the standard lead time required by the market − Certainly we expect the planned load to be LESS than the standard lead-time • There is, yet, no guaranty that the load on the CCR would be smooth − A cluster of orders to be shipped at the same date could be problematic • We need to take another step and control the promised dates of deliveries according to the CCR’s planned load 22 © 2006 TOCICO. All rights reserved.
23.
Promising delivery dates
based on the planned load TOCICO 2006 Conference • In order to achieve reliable delivery dates Sales and Operations must synchronize their actions • Instead of Sales promising delivery dates and then Operations trying to meet as many of the dates as possible, let’s build a mechanism to determine the dates that Operation can commit to deliver • As the planned load is a rough estimation of the time a new order would be processed by the CCR, we should add a time buffer to the planned load and get a “safe delivery date” for the order − Let’s decide to add ½ of the total shipping buffer 23 © 2006 TOCICO. All rights reserved.
24.
This is how
it looks like TOCICO 2006 Conference All the required CCR load for the orders that have a committed delivery date have been accumulated here Daily 50% of buffer We can Load safely deliver here The planned load Time (days) 24 © 2006 TOCICO. All rights reserved.
25.
And this is
how we tie the Rope to the Planned Load TOCICO 2006 Conference 50% of buffer 50% of buffer Daily We can Load safely deliver here full buffer Release point Time (days) The same approach, assuming the new order would be processed roughly at the current planned load time, leads us also to release the raw materials at half of the total shipping buffer before that time. All in all we have a full buffer between the release and delivery 25 © 2006 TOCICO. All rights reserved.
26.
The dilemma of
quoting short lead-times TOCICO 2006 Conference • When the planned load is close to the standard lead-time or longer, then we know we must quote the safe date • But, what happens when the safe-date is much shorter than the standard quoted lead-time? Should we quote short quoted lead times whenever possible? • On one hand we could attract more clients now • On the other hand, the clients would expect those short deliveries as the regular service also in the future and for the same price 26 © 2006 TOCICO. All rights reserved.
27.
The dilemma of
quoting short lead-times TOCICO 2006 Conference • The solution is offering a service of very fast deliveries for a considerable markup, while keeping the regular prices for standard time, but fully reliable, deliveries • Then we have to deal with orders with very short lead-time, while the regular orders have much longer lead-times − We’ll handle the negative ramifications, already mentioned earlier, later in the presentation 27 © 2006 TOCICO. All rights reserved.
28.
The shipping buffer
when the safe date is earlier than the quoted lead time TOCICO 2006 Conference Daily Safe Load delivery Addition to full buffer the buffer We promise standard release lead time point Standard lead time Time (days) The actual shipping buffer for this order is expanded from the release date, dictated by the planned load minus half of the original buffer, until the formal date for the regular price 28 © 2006 TOCICO. All rights reserved.
29.
Points of discussion
so far TOCICO 2006 Conference • Assuming dependent setups are not significant, what are the negative branches of using SDBR in general? − Would DBR work better? At what situations? − Do we need more injections to make SDBR (one buffer planning) work properly? • How should we treat quoting times that are later than the internal safe-date? − Should we keep the shipping buffer fixed and release the materials accordingly? − We thus force idle time on the weakest link. What are the possible ramifications? 29 © 2006 TOCICO. All rights reserved.
30.
The complication of
depended setups TOCICO 2006 Conference • Depended setups means significant dependency of the setup time on the previous product processed at the specific resource • The first question to raise: if the machine would process according to an arbitrary sequence, would it become a true bottleneck? − If the answer is NO, then there is no problem whatsoever to implement SDBR/BM without distortion − Many times it is worthwhile to invest in adding capacity, or coming up with engineering innovation, to get rid of the negative impact of dependent setups − Otherwise we have you yield to a preferred sequence imposed by the dependent setups 30 © 2006 TOCICO. All rights reserved.
31.
Regarding dependent setups
TOCICO 2006 Conference • It could be the case that the preferred sequence is dictated by another resource – not the CCR • A preferred sequence is not necessarily a well- defined unique sequence, but a general sequence between families of items that within the family the setup is relatively short • The assumption is that violating the sequence would turn the resource into a bottleneck − Certainly we need to consider a situation where few violations of the sequence would not create a bottleneck 31 © 2006 TOCICO. All rights reserved.
32.
Dealing with dependent
setups: two main approaches TOCICO 2006 Conference • In a situation where we cannot afford an arbitrary sequence on the CCR, like in dependent setups, two optional approaches should be checked 1. The shipping buffer is long enough to provide enough choice for the foreman, considering the priorities of the orders − In this case SDBR is still the preferable method 2. A fixed sequence determined for the CCR ahead of time, which is protected by a CCR buffer − Note that what is critical point is the sequence, NOT the exact quantity to be produced! 32 © 2006 TOCICO. All rights reserved.
33.
Dealing with more
than one standard lead time TOCICO 2006 Conference • Defining the problem: When a company has different commitments to lead times, then promising reliable due-dates is problematic because not all the orders are known at the time • This problem includes different categories: 1. The Rapid Response viable vision template 2. Commitment to a strategic client to fast response 3. Maintaining product mix with highly variable standard lead times in the industry 4. Items that are make to stock 33 © 2006 TOCICO. All rights reserved.
34.
Reserving capacity for
the faster items TOCICO 2006 Conference Only this portion is free for allocation to normal orders Reserved Super fast Fast Standard lead time The proposed approach is to dedicate certain percentage of the capacity for the faster response items. The calculation of the planned load for determining the safe dates is now based on (100 – ReservedPercentage) of the available capacity 34 © 2006 TOCICO. All rights reserved.
35.
Managing the reserved
capacity TOCICO 2006 Conference • How much reserved capacity we need? − Like in the determination of buffer size a good initial guess is all we can hope for − Then, we need to look for a way to assess whether the current reservation level is about right 35 © 2006 TOCICO. All rights reserved.
36.
What do we
lose from determining a too high reservation level? TOCICO 2006 Conference • Do we lose precious CCR capacity when we have reserved too much capacity for the “special” items? − We do not really mean that every day the CCR will work X% on the special orders and (100-x)% on regular orders − The CCR should work on whatever is available, taking into account the buffer statuses − Thus, when there is not much work for the special orders, then most regular orders would be processed earlier than predicted − We are not going to move the due-dates backwards in time − But, it is easy to move the release of materials backwards when it is evident the CCR would be able to process them earlier 36 © 2006 TOCICO. All rights reserved.
37.
What do we
lose from determining a too high reservation level? TOCICO 2006 Conference • When we plan with high reservation of capacity the safe-dates are too conservative • So, when the safe-dates lie beyond the standard lead-time, we might lose market demand • Then we lose something substantial, which makes it worth to re-check the amount of reservation 37 © 2006 TOCICO. All rights reserved.
38.
What happens when
the reservation level is too low? TOCICO 2006 Conference • The high number of special orders would push the completion of regular orders later in time − As long as the calculated safe dates for regular orders are far from the standard lead times the situation is under control − When the buffers of the regular order are not extended, then more regular orders are pushed into the red, and the number of red orders rises sharply − Then there is a need to increase the reservation level, causing the safe dates to be later in time, possibly causing losing some sales 38 © 2006 TOCICO. All rights reserved.
39.
Tools for managing
the reservation level TOCICO 2006 Conference • Monitoring the two parts of the planned load − The first part is the regular planned load, consisting of all the regular commitments, and how the front of the planned load stands relative to the standard lead time − The second part contains the special orders assuming only the reserved capacity is available for them and how close they are to the short lead-times references 39 © 2006 TOCICO. All rights reserved.
40.
Tools for managing
the reservation level TOCICO 2006 Conference • Eventually we need to control the overall capacity and how it is used for both regular and special orders • For that we need full planned load for the shortest lead-time (like super-fast) − All the orders that need to be worked on within the short lead time − The planned load needs to show some excess capacity within the short time frame 40 © 2006 TOCICO. All rights reserved.
41.
Main Discussion
TOCICO 2006 Conference • The planned load as a major planning tool (dictating due- dates) − Effectiveness and how accurate it has to be? − Ways of calculating the planned load (with or without setups and maintenance) − After how many resources we need to monitor their planned load? • The planned load as support to execution decisions (temporary increase of buffer) − How does the planned load interact with buffer management? • When the safe-date is much earlier than standard – why extending the buffers? If so, why not extend just the green? • Other questions / reservations 41 © 2006 TOCICO. All rights reserved.