Evercore ISI Utility Conference
January 12, 2017
Ameren Missouri reliability project in Downtown St. Louis
2
Cautionary Statements
Use of Non-GAAP Financial Measures
In this presentation, Ameren has presented core earnings, which is a non-GAAP measure and may not be comparable to those of other companies. A reconciliation of GAAP
to non-GAAP results is included either on the slide where the non-GAAP measure appears or on another slide referenced in this presentation. Generally, core earnings or
losses include earnings or losses attributable to Ameren common shareholders and exclude income or loss from discontinued operations and income or loss from significant
discrete items that management does not consider representative of ongoing earnings, such as the second quarter 2015 provision for discontinuing pursuit of a construction
and operating license for a second nuclear unit at the Callaway Energy Center. Ameren uses core earnings internally for financial planning and for analysis of performance.
Ameren also uses core earnings as the primary performance measurement when communicating with analysts and investors regarding our earnings results and outlook, as
the company believes that core earnings allow the company to more accurately compare its ongoing performance across periods. In providing core earnings guidance, there
could be differences between core earnings and earnings prepared in accordance with GAAP as a result of our treatment of certain items, such as those described above.
Ameren is unable to estimate the impact, if any, on GAAP earnings of any such future items.
Forward-looking Statements
Statements in this presentation not based on historical facts are considered "forward-looking" and, accordingly, involve risks and uncertainties that could cause actual results
to differ materially from those discussed. Although such forward-looking statements have been made in good faith and are based on reasonable assumptions, there is no
assurance that the expected results will be achieved. These statements include (without limitation) statements as to future expectations, beliefs, plans, strategies, objectives,
events, conditions, and financial performance. In connection with the "safe harbor" provisions of the Private Securities Litigation Reform Act of 1995, Ameren is providing this
cautionary statement to identify important factors that could cause actual results to differ materially from those anticipated. In addition to factors discussed in this
presentation, Ameren’s Annual Report on Form 10-K for the year ended December 31, 2015, and its other reports filed with the SEC under the Securities Exchange Act of
1934 contain a list of factors and a discussion of risks which could cause actual results to differ materially from management expectations suggested in such “forward-
looking” statements. All “forward-looking” statements included in this presentation are based upon information presently available, and Ameren, except to the extent required
by the federal securities laws, undertakes no obligation to update or revise publicly any “forward-looking” statements to reflect new information or current events.
Earnings Guidance and Growth Expectations
In this presentation, Ameren has presented 2016 earnings guidance that was issued and effective as of November 4, 2016, and growth expectations that were issued and
effective as of February 19, 2016. The 2016 earnings guidance assumes normal temperatures for the last three months of this year and is subject to the effects of, among
other things, changes in 30-year U.S. Treasury bond yields; regulatory, judicial and legislative actions; energy center and energy distribution operations; energy, economic,
capital and credit market conditions; severe storms; unusual or otherwise unexpected gains or losses; and other risks and uncertainties outlined, or referred to, in the
Forward-looking Statements section of this presentation and in Ameren’s periodic reports filed with the SEC.
3
Company Description
Fully rate-regulated electric and gas utility
• 2.4 million electric and 0.9 million gas customers
• 10,200 MW of regulated electric generation capability
• 4,600 circuit miles of FERC-regulated electric transmission
• Electric generation, transmission and
distribution and gas distribution
business
• Serves 1.2 million electric and 0.1
million gas customers
• 10,200 MW of total generation capability
• Regulated by MoPSC
Ameren Missouri Ameren Illinois
• Electric and gas distribution business
regulated by ICC
• Serves 1.2 million electric and 0.8
million gas customers
• Electric transmission business
regulated by FERC
Electric Transmission
• ATXI invests in regional multi-value
projects
• Ameren Illinois invests in local
reliability projects
• Regulated by FERC
Ameren Corporation
4
Our Value Proposition to Investors
Strong long-term growth outlook
• Expect ~6.5% compound annual rate base growth from 2015 through 20201
– Sustainable infrastructure investment pipeline
• Expect 5% to 8% compound annual EPS growth from 2016 through 20201
– Based on Feb. 2016 adjusted 2016 EPS guidance of $2.632
Attractive dividend
• Recently increased quarterly dividend to annualized equivalent rate of $1.76 per share
– Reflects confidence in long-term strategy
– Expect payout ratio to range between 55% to 70% of annual earnings
• Recently increased dividend rate provides 3.4%3 yield
– Above average yield compared to regulated utility peers
Attractive total return potential
• Superior combined earnings growth outlook and yield compared with regulated utility peers
• Committed to executing our strategy that we believe will deliver superior long-term value to
both customers and shareholders
1 Issued and effective as of Feb. 19, 2016 Earnings Conference Call. 2 Which was Feb. 19, 2016 guidance mid-point of $2.50 excluding then-
estimated $0.13 temporary net effect of lower sales to New Madrid smelter. 3 Based on Jan. 10 , 2017 closing share price.
Solid Operating Performance
#
Average Residential Electricity Prices1
Electric rates are low Safety has improved
Delivery system reliability
has improved
Generating plant
performance remains strong
BETTER
BETTER
BETTER
BETTER
BETTER
0
50
100
150
0
200
400
600
LostWorkday
Cases
RecordableCases
Recordable Cases Lost Workday Away Cases
60
120
180
0.6
1.0
1.4
1.8
Outageduration
(min.)
Outagefrequency
(year)
SAIFI SAIDI
0%
20%
40%
60%
80%
100%
Net Capacity Factor Equivalent Availability Factor
Distribution System Reliability2
Baseload Energy Center Performance
Safety Performance
5
1 Source: EEI Typical Bills and Average Rates Report for the twelve month period ending June 30, 2016. Includes major U.S. metropolitan areas for which EEI data is available.
2 As measured by System Average Interruption Frequency Index (SAIFI), which measures total number of interruptions per customer served and System Average Interruption
Duration Index (SAIDI), which measures the average outage duration for each customer served.
0
5
10
15
20
25
30
¢/KWh
6
Our Strategic Plan
• Investing in and operating our utilities in a manner
consistent with existing regulatory frameworks
• Enhancing regulatory frameworks and advocating for
responsible energy policies
• Creating and capitalizing on opportunities for
investment for the benefit of our customers and
shareholders
7
Our Regulatory Frameworks1
FERC-regulated electric transmission service
• Formula ratemaking; nearly eliminates regulatory lag
– Current allowed ROE is 10.82%, which includes the MISO participation adder of 50 basis points
– Rates reset each Jan. 1 based on forward-looking calculation with annual reconciliation
– Constructive rate treatment for ATXI’s three MISO-approved multi-value projects, including construction
work in progress in rate base and 56% hypothetical equity ratio during development
Illinois electric delivery service
• Formula ratemaking recently extended through 2022; nearly eliminates regulatory lag
– Allowed ROE is 580 basis points above annual average yield of 30-year U.S. Treasury
– Provides recovery of prudently incurred actual costs; based on year-end rate base
– Revenue decoupling; enhanced framework for energy efficiency
Illinois gas delivery service
• Future test year ratemaking with infrastructure rider; minimizes regulatory lag
– Allowed ROE is 9.6%
– Volume balancing adjustment for residential and small nonresidential customers
Missouri electric service
• Historical test year ratemaking; results in regulatory lag
– Allowed ROE is 9.53%
– Fuel adjustment clause recovery mechanism; pension and other postretirement benefits cost tracking
mechanism; constructive energy efficiency framework
1 See information on recent developments for: FERC on page 28; Illinois on page 12; and Missouri on pages 13-15.
Investing Strategically, Consistent with Regulatory Frameworks1
8
1 Issued and effective as of Feb. 19, 2016 Earnings Conference Call. 2 Reflects year-end rate base except for FERC-regulated transmission, which is average rate base. Includes
construction work in progress for ATXI multi-value projects. 3 Ameren Illinois and ATXI. Excludes Ameren Missouri transmission, which is included in bundled Missouri rates.
2015 to 2020E Regulated
Infrastructure Rate Base2
'15-'20E
20%
11%
6%
2%
~6.5%
5-Yr Rate
Base CAGR
Ameren
Missouri
$4.1 B
37%
Ameren
Illinois Gas
Delivery
$1.4 B
13%
Ameren
Illinois
Electric
Delivery
$2.6 B
23%
Ameren
Illinois
Transmission
$2.0 B
18%
ATXI
$1.0 B
9%
$11.1 Billion of Regulated Infrastructure
Investment 2016-2020
$7.1 $7.9
$2.4
$3.3$1.2
$2.0
$12.1
$16.7
2015 2020E
($Billions)
FERC-Regulated Transmission
Ameren Illinois Gas Delivery
Ameren Illinois Electric Delivery
Ameren Missouri
$3.5
$1.4
% of
Total
3
53%
41%
47%59%
Investing Strategically, with Focus on Transmission and Distribution
9
2015 to 2020E Regulated
Infrastructure Rate Base1
66% 73%
14%
12%4%
2%
16% 13%
100% 100%
2015 2020E
Coal Generation
Gas Generation
Nuclear and Renewables Generation
Electric and Gas Transmission and Distribution
• We will continue to be strategic and disciplined in our
investment approach
• Investing to modernize the grid to make it smarter and
to meet our customers’ future energy needs and
expectations
– Electric and gas transmission and distribution investments
are expected to comprise nearly 75% of total rate base by
the end of 2020
• Disciplined investment enables transition of generation
to a cleaner, more diverse portfolio
– Total rate base investment in coal and gas-fired generation is
expected to decline to 15% by 2020
– Meramec coal- and gas-fired energy center scheduled to
close in 2022
– New 20-year Missouri Integrated Resource Plan, to be filed
with MoPSC in Oct. 2017
1 Reflects year-end rate base except for FERC-regulated transmission, which is average rate base.
1010
2016-2020 Capital Expenditure Funding Plan1
• Return of capital through depreciation in rates
• Retained earnings
• ~$2.5-$2.6 billion of income tax deferrals and assets
– Income tax deferrals driven primarily by capital expenditures
• ~$930 million due to extension of bonus tax depreciation
– Includes ~$680 million of tax assets at Sept. 30, 2016
• Net operating losses, tax credit carryforwards, expected tax refunds and state over-
payments
• Parent company portion of tax assets was ~$420 million
• Expected to be realized into 2021
• No equity issuances expected
• Debt financing
• Capitalization target: ~50% equity
1 Issued and effective as of Feb. 19, 2016 Earnings Conference Call unless otherwise noted.
11
Creating and Capitalizing on Opportunities beyond 2020
Illinois Electric and Natural Gas Delivery
• System modernization projects including replacement of aging substations and electric distribution
and gas distribution infrastructure, including expected new federal safety regulations for gas systems
FERC-Regulated Electric Transmission
• Local reliability projects in our service territory, including NERC compliance, replacement of aging
infrastructure and modernization of grid
• Pursue opportunities to upgrade grid to maintain system voltages and reliability as generation closes
• FERC Order 1000 opportunities focusing on MISO, PJM and SPP regions
Missouri
• Replacement of aging transmission and distribution infrastructure
• Opportunities related to transition to cleaner, more diverse energy portfolio including installation of
renewable energy sources and transmission projects
• Incremental investments enabled by supportive energy policies including smart meters, substations
and other equipment, underground grid, transmission and renewables
Company Wide
• Information technology and cybersecurity
Customer and Community Benefits
Improved reliability and safety, greater control of energy usage and costs, market efficiency, a cleaner,
more diverse energy portfolio, enhanced cybersecurity and significant job creation
1212
• Future Energy Jobs Bill (Senate Bill 2814) enacted in Dec. 2016;
effective June 1, 2017
• Enhances and extends Ameren Illinois’ electric distribution
framework
– Extends constructive formula ratemaking through 2022
• Enables continuation of Ameren Illinois’ strong rate base growth plan
– Allows capitalization of and ability to earn return on energy efficiency spend
• Previously expensed as incurred; expect spend to average ~$110 million/year
– Provides revenue decoupling
• Eliminates margin erosion due to, among other things, energy efficiency
• Ensures consistent ability to earn allowed ROE
– Deems common equity ratio of up to and including 50% as prudent
Illinois Energy Legislation
Customer and Community Benefits
Strong customer rate impact protections; enables greater investment, incl. in energy efficiency; creates
more reliable, smarter grid; retains cleaner energy sources; and preserves jobs
13
Efforts to Enhance Missouri Regulatory Framework
• MoPSC - opened case to consider policies to improve way it regulates electric utilities
– Ameren Missouri and other electric investor-owned utilities identified several approaches to enhance
regulatory framework to support investment
– In Sept. 23 filing, Ameren Missouri outlined potential incremental investments in detail
• $1 billion over five years ending 2022, with more than $4 billion over ten years
• Smart meters, aging substations and other equipment, underground grid, transmission and renewables
– In Oct. 17 report, MoPSC Staff stated it was not opposed to several approaches for supporting
targeted investments which would continue to include strong MoPSC oversight
– In Dec. 6 report, MoPSC stated it generally agreed with and supported the Oct. Staff report and
recommended General Assembly consider certain principles in drafting any legislation that encourages
utility investment in grid modernization
• Senate Interim Committee - evaluated ways to modernize utility regulatory process
– In Dec. 28 report, Committee majority recommended legislation setting forth a new regulatory
framework for electric utilities, including a performance-based ratemaking approach that includes an
annual rate review process that more closely matches revenues with costs
• Legislation has been introduced in the Missouri Senate to modernize electric utility
regulation for the benefit of customers and the state
– Senate Bills 190, 214 and 215
Customer and Community Benefits
Enhanced regulatory framework would enable greater investment to create more reliable, smarter grid;
facilitate transition to cleaner, more diverse energy portfolio; help protect against physical and cyber security
attacks; better position Missouri for future; and create significant jobs
1414
• The Missouri Economic Development and Infrastructure
Investment Act (SB 190)
– Deferral between rate cases of depreciation on capital projects placed in-
service and of return on incremental rate base
• Deferrals added to rate base and recovered over 20 years, subject to revenue
requirement cap of 0.75% for every 12 months between rate cases
– Inclusion of transmission charges and revenues in fuel adjustment clause
– Property tax, cyber and physical security cost trackers
– MoPSC authority to utilize certain rate adjustment mechanisms to promote
modernization and replacement of infrastructure
– Economic development incentives for large electricity consumers
– Continued strong MoPSC oversight and consumer protections
Proposed Missouri Energy Legislation
Customer and Community Benefits
Enhanced regulatory framework would enable greater investment to create more reliable, smarter grid;
facilitate transition to cleaner, more diverse energy portfolio; help protect against physical and cyber
security attacks; better position Missouri for future; and create significant jobs
1515
• The 21st Century Grid Modernization and Security Act (SB 214)
– Electric utilities may participate in performance-based ratemaking framework that would
provide timely recovery of actual, prudently incurred costs
– Allowed ROE tied to yield of 30-year U.S. treasury and performance on certain metrics
– Important customer benefits including earnings caps, rate stabilization mechanisms, utility
performance standards and strong oversight by Missouri Public Service Commission
– Economic development incentives for large electricity consumers
• SB 215 allows MoPSC to utilize certain rate adjustment mechanisms to
promote modernization and replacement of electric utility infrastructure
– Directs MoPSC to support electric utility infrastructure investments for reliability, safety,
security, or automation of infrastructure
– Allows MoPSC to use partially forecasted test-years, true-ups of revenue requirement
components, tracking mechanisms, grid modernization incentive mechanisms, interim
rates, performance-based rates, decoupling, or decisional pre-approval with post
construction review for construction projects
Proposed Missouri Energy Legislation, cont’d
Customer and Community Benefits
Enhanced regulatory framework would enable greater investment to create more reliable, smarter grid;
facilitate transition to cleaner, more diverse energy portfolio; help protect against physical and cyber
security attacks; better position Missouri for future; and create significant jobs
16
Select Regulatory Proceedings and Potential Tax Reform
Illinois electric delivery service
• In Dec., the ICC approved a $14 million net annual decrease in electric delivery formula rates effective
Jan. 2017, in line with Ameren Illinois’ request
– Each year’s electric distribution service earnings are a function of the rate formula and are not directly determined
by that year’s rate update filing
Missouri electric service
• $206 million annual electric revenue increase request filed July 1 with MoPSC
– Includes recovery of, and return on, new infrastructure investments
– Removes prospectively the negative earnings effects of lower sales to New Madrid smelter
– Seeks implementation of a new transmission cost tracker
– MoPSC order expected in late April 2017 with new rates effective in late May 2017
FERC-regulated electric transmission service
• Second MISO ROE complaint case seeks to reduce allowed base ROE, which is now 10.32%
– FERC final order on first complaint case adopted ALJ’s recommended 10.32% base ROE
– FERC final order on second complaint case expected in Q2 2017; ALJ recommended 9.70% base ROE
– MISO participation adder of up to 50 basis points to base ROE results in current allowed ROE of 10.82%
Potential federal corporate tax reform
• Ameren working with utility industry to analyze and shape reform proposals
– Areas of focus include: tax rate, accelerated depreciation of capital investments, key deductions and return of
excess deferred taxes to customers
17
Our Value Proposition to Investors
Strong long-term growth outlook
• Expect ~6.5% compound annual rate base growth from 2015 through 20201
– Sustainable infrastructure investment pipeline
• Expect 5% to 8% compound annual EPS growth from 2016 through 20201
– Based on Feb. 2016 adjusted 2016 EPS guidance of $2.632
Attractive dividend
• Recently increased quarterly dividend to annualized equivalent rate of $1.76 per share
– Reflects confidence in long-term strategy
– Expect payout ratio to range between 55% to 70% of annual earnings
• Recently increased dividend rate provides 3.4%3 yield
– Above average yield compared to regulated utility peers
Attractive total return potential
• Superior combined earnings growth outlook and yield compared with regulated utility peers
• Committed to executing our strategy that we believe will deliver superior long-term value to
both customers and shareholders
1 Issued and effective as of Feb. 19, 2016 Earnings Conference Call. 2 Which was Feb. 19, 2016 guidance mid-point of $2.50 excluding then-
estimated $0.13 temporary net effect of lower sales to New Madrid smelter. 3 Based on Jan. 10, 2017 closing share price.
Financial Update
19
Earnings Analysis for Nine Months Ended Sept. 30
Key Core Earnings Variance Drivers
 Increased electric transmission and distribution infrastructure investments
by ATXI and Ameren Illinois, including changes in allowed ROEs: +$0.17
 Higher Illinois natural gas distribution service rates incorporating
increased infrastructure investments and allowed ROE: +$0.09
 Warmer summer temperatures partially offset by milder winter
temperatures: ~+$0.09
– ~+$0.11 vs. normal temperatures
 Q1 2016 tax benefits associated with share-based compensation: +$0.09
 Net effect of lower sales to New Madrid smelter: $(0.13)
 Callaway nuclear refueling and maintenance outage vs. none in 2015:
$(0.08)
 Carryover effect of Missouri 2013-2015 energy efficiency plan, net of
performance incentive award: $(0.07)
– Performance incentive award: +$0.05
 Absence of 2015 recovery of certain cumulative Ameren Illinois power
usage costs: $(0.04)
Core Diluted EPS1
YTD 2015 vs. YTD 2016
$2.44
$2.56
2015 2016
1 Core (non-GAAP) earnings per share exclude 2015 results of discontinued operations and a 2015 provision for discontinuing pursuit of a license for a second nuclear unit at the
Callaway Energy Center. See page 20 for GAAP to core results reconciliation.
20
GAAP to Core Earnings Reconciliation
(In millions, except per share
amounts)
Nine Months Ended Sept. 30,
2015 2016
GAAP Earnings / Diluted EPS $ 601 $ 2.47 $ 621 $ 2.56
Results from discontinued operations
Operating income before income tax (3) (0.01) — —
Income tax benefit (49) (0.20) — —
Income from discontinued operations, net of taxes (52) (0.21) — —
Provision for discontinuing pursuit of license for
second nuclear unit at Callaway Energy Center
Provision before income tax 69 0.29 — —
Income tax expense (26) (0.11) — —
Provision, net of taxes 43 0.18 — —
Core Earnings / Diluted EPS $ 592 $ 2.44 $ 621 $ 2.56
21
2016 EPS Guidance1: Select Balance of Year Considerations
Q4 2016E compared to Q4 2015:
 Return to normal temperatures: ~+$0.08
 Increased electric transmission and distribution service infrastructure
investments by ATXI and Ameren Illinois partially offset by lower Illinois
electric delivery service allowed ROE
 Higher Illinois natural gas distribution service rates incorporating
increased rate base and allowed ROE
 Unfavorable carryover impacts of Missouri 2015 energy efficiency plan
partially offset by additional performance incentive award recognition:
~$(0.08)
 Lower Missouri electric sales to New Madrid smelter: ~$(0.02)
 Increased Missouri depreciation and transmission expenses
2016E Diluted EPS
$2.65
$2.75
1 Issued and effective as of Nov. 4, 2016 Earnings Conference Call.
22
Select 2017 Earnings Considerations1
1 Issued and effective as of Nov. 4, 2016 Earnings Conference Call. 2 Estimated FERC-regulated average rate base for Ameren Illinois and ATXI are $1.4 billion and $1.1 billion for
2017, respectively, compared to $1.2 billion and $0.9 billion for 2016, respectively.
FERC-Regulated
Electric Transmission
 Higher average estimated rate base: ~$2.52 billion compared to estimated ~$2.12 billion in 2016
reflecting infrastructure investments made under formula ratemaking
• Expect lower projected weighted average allowed ROE vs. 2016
Ameren Illinois
Electric and Gas
Delivery
 Higher year-end rate base for electric delivery reflecting infrastructure investments made under
formula ratemaking
• Allowed ROE will be 2017 average 30-year Treasury yield plus 5.8%
 Gas distribution infrastructure investments qualifying for rider treatment
Ameren Missouri
 Increased electric service rates expected in late May 2017
• Reflecting new infrastructure investments, as well as more recent sales and cost levels
• Removal of negative effect of lower sales to New Madrid smelter: ~+$0.12
 Increased depreciation, transmission and property tax expenses
 Absence of 2016 performance incentive award related to 2013-2015 energy efficiency plan: $(0.07)
▬ Callaway refueling and maintenance outage scheduled for fall 2017 vs. spring 2016
Parent and Other  Lower tax benefits associated with share-based compensation
 Return to normal temperatures:
~($0.11) through Sept. 30, 2016
Appendix
Significant FERC-Regulated Transmission Investment
Planned $3.0 billion investment – 2016-20201
• $1.0 billion of regional multi-value projects at ATXI
• $2.0 billion of local reliability and connecting portions of regional multi-
value projects at Ameren Illinois
Total Multi-Value Project Costs2
• Illinois Rivers Project - $1.4 billion
– ATXI ~$1.3 billion; Ameren Illinois ~$100 million
– Under construction; expect to complete in 2019
• Spoon River Project - $150 million
– ATXI ~$145 million; Ameren Illinois ~$5 million
– ICC issued CPCN in Sept. 2015; line clearing has begun and significant line
construction expected to begin in Jan. 2017 with completion in 2018
• Mark Twain Project - $225 million
– 100% ATXI project
• CCN for Mark Twain approved by MoPSC; pursuing county assents for
road crossings
– Anticipate construction to begin in 2017 with completion in 2018/2019
Regional
Multi-Value Projects
24
1 Issued and effective as of Feb. 19, 2016 Earnings Conference Call. 2 Includes pre-2016 expenditures.
25
Pending Missouri Electric Rate Case
PROCEDURAL SCHEDULE
KEY DATES:
Dec. 9, 2016
Revenue requirement testimony
of MoPSC Staff and intervenors
was filed
Feb. 24, 2017
MoPSC Staff reconciliation of
parties’ positions due
Feb. 27, 2017
Evidentiary hearings begin
Late April 2017
MoPSC order expected
May 28, 2017
New rates effective by this date
• $206 million annual electric revenue increase request filed July 1, 2016
with MoPSC, which would result in an average 7.8% increase in base
rates
– ROE: 9.9% vs. 9.53% in April 2015 order
– Equity ratio: 51.8% (Dec. 31, 2016 estimate) vs. same ratio in April 2015 order
– Rate base: $7.2 billion (Dec. 31, 2016 estimate) vs. $7.0 billion in April 2015 order
– Test year ended Mar. 31, 2016, with certain pro-forma adjustments through Dec. 31,
20161
• Continuation of fuel adjustment clause
– Continued 95%/5% sharing of variances from net energy costs included in base rates
• Cost tracking mechanisms
– Continuation of pension and OPEB tracker
– Continuation of uncertain income tax positions tracker
– Implementation of a new transmission tracker
1 Through Jan. 1, 2017 for fuel, transportation, MISO multi-value transmission project expenses and payroll costs.
2626
Pending Missouri Electric Rate Case, cont’d
• Key drivers of requested $206 million annual revenue increase
– New electric infrastructure investments: +$74 million
• Depreciation: $39 million; return on rate base: $25 million; and property taxes1: $10 million
– Reduced customer sales, less related net energy costs2: +$51 million
• Removes prospectively the negative earnings effects of lower sales to New Madrid smelter
– Recovery of increased transmission expenses: +$34 million
• Includes Jan. 1, 2017 rates for MISO multi-value projects
– Changes to tracked pension/OPEB and solar rebate expenses: $(24) million and
$(15) million, respectively
– Increased net energy costs, excluding reduced New Madrid smelter and other sales:
+$23 million
– Increased income taxes: +$15 million
– Amortization over 10 years of estimated $81 million of lost fixed costs due to lower sales
to New Madrid smelter: +$8 million
– Other, net - largely to recover increased expenses: +$40 million
1 On new investments and from higher property tax rates.
2 Net energy costs, as defined in the FAC, include fuel and purchased power costs, including transportation but excluding transmission
revenues and substantially all transmission charges, net of off-system sales revenues.
27
Pending Missouri Electric Rate Case, cont’d1
• MoPSC Staff recommended $52 million annual rate increase on Dec. 9
– ROE: 8.75% (7.9% to 8.85% range) vs. 9.9% request
• MIEC and MECG recommended 9.2% (9.0% to 9.4% range)
– Equity ratio: use of Ameren consolidated 50.5% vs. Ameren Missouri’s 51.8% request
• MoPSC has historically used Ameren Missouri’s equity ratio
– Rate base: $7.1 billion vs. $7.2 billion request
• Key observations of Staff recommendation ($ difference compared to request)
– ROE: $(67) million; Equity ratio: $(8) million
– Removed prospectively negative earnings effects of lower sales to New Madrid smelter
– Continuation of fuel adjustment clause
– Reflected update for transmission costs effective Jan. 1, 2017, but opposed tracker2
– Continuation of pension/OPEB and uncertain income tax positions trackers
– No significant difference in net energy costs or income taxes
– Opposed amortization of lost fixed costs due to New Madrid smelter2: $(8) million
– Various other cost and amortization updates, normalizations and disallowances
1 Ameren Missouri‘s analysis and estimates. Ameren request and Staff and Intervenor recommendations to be trued-up through Dec. 31, 2016 for
select items. 2 MIEC supports Staff recommendation to oppose.
2828
• Cases sought to reduce Ameren Illinois’ and ATXI’s transmission service allowed
base ROE
– In first case, FERC final order issued Sept. 28, 2016 confirmed ALJ initial
recommendation of a 10.32% base ROE
• Maximum ROE including incentives not to exceed 11.35%
– In second case, ALJ initial decision issued June 30, 2016 recommended a 9.70%
base ROE
• FERC final order expected in Q2 2017
• Reserve for potential refunds
• FERC approved adder of up to 50 basis points to base ROE, effective Jan. 6, 2015,
for MISO participation
– Subject to “zone of reasonableness”
– Results in current FERC allowed ROE of 10.82%
FERC MISO Complaint Cases Regarding MISO base ROE
29
Select Regulatory and Legislative Matters
Illinois Commerce Commission
• Electric distribution rate update: Docket No. 16-0262
• Website: http://www.icc.illinois.gov
Missouri General Assembly / Missouri Public Service Commission
• Senate Bills 190, 214 and 215: http://www.senate.mo.gov/17info/BTS_Web/BillList.aspx?SessionType=R
• Report of Senate Interim Committee on Utility Regulation and Infrastructure Investment:
http://www.senate.mo.gov/16info/Comm/Interim/SIRI-Final-Rpt.pdf
• 2016 electric rate case: Docket No. ER-2016-0179
• MoPSC order granting CCN for ATXI’s Mark Twain transmission project: Docket No. EA-2015-0146
• MoPSC working case to consider policies to improve electric utility regulation: Docket No. EW-2016-0313
• MoPSC website: https://www.efis.psc.mo.gov/mpsc/DocketSheet.html
Federal Energy Regulatory Commission
• Complaint challenging MISO base ROE: Docket No. EL15-45
• Website: http://elibrary.ferc.gov/idmws/search/fercadvsearch.asp
Other Filings
• Ameren Illinois & ATXI Projected 2017 Attachment O:
http://www.oasis.oati.com/woa/docs/AMRN/AMRNdocs/2017_Transmission_Rates_List.html
Investor Relations Calendar
30
• Jan 12 Evercore ISI Utility Conference
• Jan 14 Q4 quiet period begins
JANUARY 2017
SUN. MON. TUES. WED. THUR. FRI. SAT.
1 2 3 4 5 6 7
8 9 10 11 12 13 14
Evercore
ISI Utility
Conf.
Q4 Quiet
Period
begins
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
FEBRUARY 2017
SUN. MON. TUES. WED. THUR. FRI. SAT.
1 2 3 4
Q4 Quiet
Period
cont’d
5 6 7 8 9 10 11
12 13 14 15 16 17 18
Q4
Earnings
Release
19 20 21 22 23 24 25
29 30 31
• Feb. 16 Q4 2016 earnings release and call
(tentative)
31
Glossary of Terms and Abbreviations
ALJ – Administrative Law Judge.
AMI – Automated Meter Infrastructure.
ATXI – Ameren Transmission Company of Illinois.
B – Billion.
CAGR – Compound annual growth rate.
CCN – Certificate of Convenience and Necessity.
Core – (Non-GAAP) earnings exclude income or loss from
discontinued operations and income or loss from significant
discrete items that management does not consider
representative of ongoing earnings. See page 20 for GAAP to
core results reconciliations for the nine months ended
September 30, 2015.
CPCN – Certificate of Public Convenience and Necessity.
E – Estimated.
EPS – Earnings per share.
FAC – Fuel adjustment clause.
FERC – Federal Energy Regulatory Commission.
GAAP – Generally Accepted Accounting Principles.
ICC – Illinois Commerce Commission.
M – Million.
MECG – Midwest Energy Consumers Group.
MIEC – Missouri Industrial Energy Consumers.
MISO – Midcontinent Independent System Operator, Inc.
MoPSC – Missouri Public Service Commission.
MWh – Megawatthour.
NERC – North American Electric Reliability Corporation.
New Madrid smelter – New Madrid, Missouri aluminum smelter,
(formerly owned by Noranda).
Noranda – Noranda Aluminum, Inc.
OPEB – Other Post-Employment Benefits.
PJM – PJM Interconnection.
GAAP – Generally Accepted Accounting Principles.
SB – Senate Bill.
SEC – U.S. Securities and Exchange Commission.
SPP – Southwest Power Pool.

Más contenido relacionado

La actualidad más candente

Jp energy barclays mlp corporate access day
Jp energy   barclays mlp corporate access dayJp energy   barclays mlp corporate access day
Jp energy barclays mlp corporate access dayir_jpenergy
 
dte_Q12008_er
dte_Q12008_erdte_Q12008_er
dte_Q12008_erfinance41
 
Trc q2 2016 earnings slides final
Trc q2 2016 earnings slides finalTrc q2 2016 earnings slides final
Trc q2 2016 earnings slides finaltrcsolutions
 
.integrysgroup 02/26/2009_slides
.integrysgroup  02/26/2009_slides.integrysgroup  02/26/2009_slides
.integrysgroup 02/26/2009_slidesfinance26
 
AES Q4 & FY 2016 Financial Review
AES Q4 & FY 2016 Financial ReviewAES Q4 & FY 2016 Financial Review
AES Q4 & FY 2016 Financial ReviewAES_BigSky
 
3 q2016 earnings_ppt_final
3 q2016 earnings_ppt_final3 q2016 earnings_ppt_final
3 q2016 earnings_ppt_finalInfraREIT
 
southern 2008 3rd Earnings Package
southern  2008 3rd	Earnings Packagesouthern  2008 3rd	Earnings Package
southern 2008 3rd Earnings Packagefinance17
 
DTE Energy Year End 2014 Earnings Conference Call Slide Deck
DTE Energy Year End 2014 Earnings Conference Call Slide DeckDTE Energy Year End 2014 Earnings Conference Call Slide Deck
DTE Energy Year End 2014 Earnings Conference Call Slide DeckMarcellus Drilling News
 
ameren InvestorMeetings
ameren InvestorMeetingsameren InvestorMeetings
ameren InvestorMeetingsfinance30
 
southern Earnings Package 2008 1st
southern Earnings Package 2008 1stsouthern Earnings Package 2008 1st
southern Earnings Package 2008 1stfinance17
 
Trc q3 2016 earnings slides final
Trc q3 2016 earnings slides finalTrc q3 2016 earnings slides final
Trc q3 2016 earnings slides finaltrcsolutions
 
southern 2008 2nd
southern  2008 2ndsouthern  2008 2nd
southern 2008 2ndfinance17
 
.integrysgroup 05/08/2008_text
.integrysgroup 05/08/2008_text.integrysgroup 05/08/2008_text
.integrysgroup 05/08/2008_textfinance26
 
Trc q4 2016 earnings slides final
Trc q4 2016 earnings slides finalTrc q4 2016 earnings slides final
Trc q4 2016 earnings slides finaltrcsolutions
 

La actualidad más candente (19)

TDS Third Quarter 2016 Results
TDS Third Quarter 2016 ResultsTDS Third Quarter 2016 Results
TDS Third Quarter 2016 Results
 
Jp energy barclays mlp corporate access day
Jp energy   barclays mlp corporate access dayJp energy   barclays mlp corporate access day
Jp energy barclays mlp corporate access day
 
dte_Q12008_er
dte_Q12008_erdte_Q12008_er
dte_Q12008_er
 
Trc q2 2016 earnings slides final
Trc q2 2016 earnings slides finalTrc q2 2016 earnings slides final
Trc q2 2016 earnings slides final
 
.integrysgroup 02/26/2009_slides
.integrysgroup  02/26/2009_slides.integrysgroup  02/26/2009_slides
.integrysgroup 02/26/2009_slides
 
AES Q4 & FY 2016 Financial Review
AES Q4 & FY 2016 Financial ReviewAES Q4 & FY 2016 Financial Review
AES Q4 & FY 2016 Financial Review
 
3 q2016 earnings_ppt_final
3 q2016 earnings_ppt_final3 q2016 earnings_ppt_final
3 q2016 earnings_ppt_final
 
southern 2008 3rd Earnings Package
southern  2008 3rd	Earnings Packagesouthern  2008 3rd	Earnings Package
southern 2008 3rd Earnings Package
 
DTE Energy Year End 2014 Earnings Conference Call Slide Deck
DTE Energy Year End 2014 Earnings Conference Call Slide DeckDTE Energy Year End 2014 Earnings Conference Call Slide Deck
DTE Energy Year End 2014 Earnings Conference Call Slide Deck
 
ameren InvestorMeetings
ameren InvestorMeetingsameren InvestorMeetings
ameren InvestorMeetings
 
southern Earnings Package 2008 1st
southern Earnings Package 2008 1stsouthern Earnings Package 2008 1st
southern Earnings Package 2008 1st
 
Trc q3 2016 earnings slides final
Trc q3 2016 earnings slides finalTrc q3 2016 earnings slides final
Trc q3 2016 earnings slides final
 
3 q 2017 operating results final
3 q 2017 operating results final3 q 2017 operating results final
3 q 2017 operating results final
 
southern 2008 2nd
southern  2008 2ndsouthern  2008 2nd
southern 2008 2nd
 
.integrysgroup 05/08/2008_text
.integrysgroup 05/08/2008_text.integrysgroup 05/08/2008_text
.integrysgroup 05/08/2008_text
 
dte_q304er
dte_q304erdte_q304er
dte_q304er
 
Trc q4 2016 earnings slides final
Trc q4 2016 earnings slides finalTrc q4 2016 earnings slides final
Trc q4 2016 earnings slides final
 
Awk red chip slides final without notes
Awk red chip slides final without notesAwk red chip slides final without notes
Awk red chip slides final without notes
 
dte_q105er
dte_q105erdte_q105er
dte_q105er
 

Destacado

MomentumPR Presentation
MomentumPR PresentationMomentumPR Presentation
MomentumPR PresentationMomentumPR
 
Kingsdale Presentation - June 25, 2010
Kingsdale Presentation - June 25, 2010Kingsdale Presentation - June 25, 2010
Kingsdale Presentation - June 25, 2010CNSX
 
CIRI Financial Modeling Workshop
CIRI Financial Modeling WorkshopCIRI Financial Modeling Workshop
CIRI Financial Modeling WorkshopCIRI2014
 
Strategic Investor Relations and Public Disclosure
Strategic Investor Relations and Public DisclosureStrategic Investor Relations and Public Disclosure
Strategic Investor Relations and Public DisclosureKenny Ong
 
TIP- presentation: “Lugano Small & Mid Cap Investor Day”
TIP- presentation: “Lugano Small & Mid Cap Investor Day” TIP- presentation: “Lugano Small & Mid Cap Investor Day”
TIP- presentation: “Lugano Small & Mid Cap Investor Day” Tamburi Investment Partners
 
Securing ASP.NET MVC 5 Web Applications
Securing ASP.NET MVC 5 Web ApplicationsSecuring ASP.NET MVC 5 Web Applications
Securing ASP.NET MVC 5 Web ApplicationsMartin Åhlin
 
CanniMed Therapeutics Inc. Investor Deck February 2017
CanniMed Therapeutics Inc. Investor Deck February 2017CanniMed Therapeutics Inc. Investor Deck February 2017
CanniMed Therapeutics Inc. Investor Deck February 2017CannimedTherapeutics
 
How to present your company as an investment opportunity
How to present your company as an investment opportunityHow to present your company as an investment opportunity
How to present your company as an investment opportunityJacob Segal
 
Content strategy for investor_relations
Content strategy for investor_relationsContent strategy for investor_relations
Content strategy for investor_relationsDiffero Oy
 
Top 10 investor relations interview questions with answers
Top 10 investor relations interview questions with answersTop 10 investor relations interview questions with answers
Top 10 investor relations interview questions with answersthomasgabriel033
 
An Understanding Of Financial Communications And Investor Relations
An Understanding Of Financial Communications And Investor RelationsAn Understanding Of Financial Communications And Investor Relations
An Understanding Of Financial Communications And Investor RelationsMSL
 
Investor Presentation Template
Investor Presentation TemplateInvestor Presentation Template
Investor Presentation TemplateShai Goldman
 

Destacado (15)

MomentumPR Presentation
MomentumPR PresentationMomentumPR Presentation
MomentumPR Presentation
 
Kingsdale Presentation - June 25, 2010
Kingsdale Presentation - June 25, 2010Kingsdale Presentation - June 25, 2010
Kingsdale Presentation - June 25, 2010
 
CIRI Financial Modeling Workshop
CIRI Financial Modeling WorkshopCIRI Financial Modeling Workshop
CIRI Financial Modeling Workshop
 
NIRI White Paper: 2014 Compensation and the IRO
NIRI White Paper: 2014 Compensation and the IRO NIRI White Paper: 2014 Compensation and the IRO
NIRI White Paper: 2014 Compensation and the IRO
 
Strategic Investor Relations and Public Disclosure
Strategic Investor Relations and Public DisclosureStrategic Investor Relations and Public Disclosure
Strategic Investor Relations and Public Disclosure
 
TIP- presentation: “Lugano Small & Mid Cap Investor Day”
TIP- presentation: “Lugano Small & Mid Cap Investor Day” TIP- presentation: “Lugano Small & Mid Cap Investor Day”
TIP- presentation: “Lugano Small & Mid Cap Investor Day”
 
Securing ASP.NET MVC 5 Web Applications
Securing ASP.NET MVC 5 Web ApplicationsSecuring ASP.NET MVC 5 Web Applications
Securing ASP.NET MVC 5 Web Applications
 
CanniMed Therapeutics Inc. Investor Deck February 2017
CanniMed Therapeutics Inc. Investor Deck February 2017CanniMed Therapeutics Inc. Investor Deck February 2017
CanniMed Therapeutics Inc. Investor Deck February 2017
 
How to present your company as an investment opportunity
How to present your company as an investment opportunityHow to present your company as an investment opportunity
How to present your company as an investment opportunity
 
Content strategy for investor_relations
Content strategy for investor_relationsContent strategy for investor_relations
Content strategy for investor_relations
 
Top 10 investor relations interview questions with answers
Top 10 investor relations interview questions with answersTop 10 investor relations interview questions with answers
Top 10 investor relations interview questions with answers
 
What is Investor Relations?
What is Investor Relations?What is Investor Relations?
What is Investor Relations?
 
2014 Study on How Investment Horizon and Expectations of Shareholder Base Imp...
2014 Study on How Investment Horizon and Expectations of Shareholder Base Imp...2014 Study on How Investment Horizon and Expectations of Shareholder Base Imp...
2014 Study on How Investment Horizon and Expectations of Shareholder Base Imp...
 
An Understanding Of Financial Communications And Investor Relations
An Understanding Of Financial Communications And Investor RelationsAn Understanding Of Financial Communications And Investor Relations
An Understanding Of Financial Communications And Investor Relations
 
Investor Presentation Template
Investor Presentation TemplateInvestor Presentation Template
Investor Presentation Template
 

Similar a Aee 2017 evercore conference final

Morgan stanley mlp bus tour jan. 26 - final
Morgan stanley mlp bus tour   jan. 26 - finalMorgan stanley mlp bus tour   jan. 26 - final
Morgan stanley mlp bus tour jan. 26 - finalEnLinkMidstreamLLC
 
EnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor CallEnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor CallEnLinkMidstreamLLC
 
Jp morgan okc bus tour may 16 16 - final
Jp morgan okc bus tour   may 16 16 - finalJp morgan okc bus tour   may 16 16 - final
Jp morgan okc bus tour may 16 16 - finalEnLinkMidstreamLLC
 
OC Roadshow Hosted by Bank of America Merrill Lynch – Philadelphia
OC Roadshow Hosted by Bank of America Merrill Lynch – PhiladelphiaOC Roadshow Hosted by Bank of America Merrill Lynch – Philadelphia
OC Roadshow Hosted by Bank of America Merrill Lynch – PhiladelphiaCorning_Owens
 
Q1 16 operations report - final
Q1 16 operations report - finalQ1 16 operations report - final
Q1 16 operations report - finalEnLinkMidstreamLLC
 
2017 05 19 boston rbc
2017 05 19 boston rbc2017 05 19 boston rbc
2017 05 19 boston rbcCorning_Owens
 
Wells Fargo Real Estate Securities Conference – New York
Wells Fargo Real Estate Securities Conference – New YorkWells Fargo Real Estate Securities Conference – New York
Wells Fargo Real Estate Securities Conference – New YorkCorning_Owens
 
consoliddated edison 2003_annual
consoliddated edison 2003_annual consoliddated edison 2003_annual
consoliddated edison 2003_annual finance20
 
edison international 2003_annual_sce_1166
edison international 2003_annual_sce_1166edison international 2003_annual_sce_1166
edison international 2003_annual_sce_1166finance21
 
Q3 presentation v1 (1)
Q3 presentation v1 (1)Q3 presentation v1 (1)
Q3 presentation v1 (1)Corning_Owens
 

Similar a Aee 2017 evercore conference final (20)

Morgan stanley mlp bus tour jan. 26 - final
Morgan stanley mlp bus tour   jan. 26 - finalMorgan stanley mlp bus tour   jan. 26 - final
Morgan stanley mlp bus tour jan. 26 - final
 
Q2 presentation v3
Q2 presentation v3Q2 presentation v3
Q2 presentation v3
 
EnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor CallEnLink Midstream / Tall Oak Midstream Acquisition Investor Call
EnLink Midstream / Tall Oak Midstream Acquisition Investor Call
 
Jp morgan okc bus tour may 16 16 - final
Jp morgan okc bus tour   may 16 16 - finalJp morgan okc bus tour   may 16 16 - final
Jp morgan okc bus tour may 16 16 - final
 
Q2 presentation v2
Q2 presentation v2Q2 presentation v2
Q2 presentation v2
 
Q3 presentation-v8
Q3 presentation-v8Q3 presentation-v8
Q3 presentation-v8
 
Q1 presentation v1
Q1 presentation v1Q1 presentation v1
Q1 presentation v1
 
Q1 presentation v6
Q1 presentation v6Q1 presentation v6
Q1 presentation v6
 
Q3 presentation v6
Q3 presentation v6Q3 presentation v6
Q3 presentation v6
 
Q1 presentation v5
Q1 presentation v5Q1 presentation v5
Q1 presentation v5
 
OC Roadshow Hosted by Bank of America Merrill Lynch – Philadelphia
OC Roadshow Hosted by Bank of America Merrill Lynch – PhiladelphiaOC Roadshow Hosted by Bank of America Merrill Lynch – Philadelphia
OC Roadshow Hosted by Bank of America Merrill Lynch – Philadelphia
 
Q1 16 operations report - final
Q1 16 operations report - finalQ1 16 operations report - final
Q1 16 operations report - final
 
2017 05 19 boston rbc
2017 05 19 boston rbc2017 05 19 boston rbc
2017 05 19 boston rbc
 
Q4 presentation v1
Q4 presentation v1Q4 presentation v1
Q4 presentation v1
 
Wells Fargo Real Estate Securities Conference – New York
Wells Fargo Real Estate Securities Conference – New YorkWells Fargo Real Estate Securities Conference – New York
Wells Fargo Real Estate Securities Conference – New York
 
Q2 presentation v5
Q2 presentation v5Q2 presentation v5
Q2 presentation v5
 
consoliddated edison 2003_annual
consoliddated edison 2003_annual consoliddated edison 2003_annual
consoliddated edison 2003_annual
 
edison international 2003_annual_sce_1166
edison international 2003_annual_sce_1166edison international 2003_annual_sce_1166
edison international 2003_annual_sce_1166
 
2014 investor overview
2014 investor overview2014 investor overview
2014 investor overview
 
Q3 presentation v1 (1)
Q3 presentation v1 (1)Q3 presentation v1 (1)
Q3 presentation v1 (1)
 

Último

Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...USDAReapgrants.com
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfFrancenel Paul
 
Best investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discountingBest investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discountingFalcon Invoice Discounting
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfsansanir
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfProbe Gold
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 

Último (15)

Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdf
 
Best investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discountingBest investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discounting
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdf
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdf
 
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 

Aee 2017 evercore conference final

  • 1. Making Impactan Evercore ISI Utility Conference January 12, 2017 Ameren Missouri reliability project in Downtown St. Louis
  • 2. 2 Cautionary Statements Use of Non-GAAP Financial Measures In this presentation, Ameren has presented core earnings, which is a non-GAAP measure and may not be comparable to those of other companies. A reconciliation of GAAP to non-GAAP results is included either on the slide where the non-GAAP measure appears or on another slide referenced in this presentation. Generally, core earnings or losses include earnings or losses attributable to Ameren common shareholders and exclude income or loss from discontinued operations and income or loss from significant discrete items that management does not consider representative of ongoing earnings, such as the second quarter 2015 provision for discontinuing pursuit of a construction and operating license for a second nuclear unit at the Callaway Energy Center. Ameren uses core earnings internally for financial planning and for analysis of performance. Ameren also uses core earnings as the primary performance measurement when communicating with analysts and investors regarding our earnings results and outlook, as the company believes that core earnings allow the company to more accurately compare its ongoing performance across periods. In providing core earnings guidance, there could be differences between core earnings and earnings prepared in accordance with GAAP as a result of our treatment of certain items, such as those described above. Ameren is unable to estimate the impact, if any, on GAAP earnings of any such future items. Forward-looking Statements Statements in this presentation not based on historical facts are considered "forward-looking" and, accordingly, involve risks and uncertainties that could cause actual results to differ materially from those discussed. Although such forward-looking statements have been made in good faith and are based on reasonable assumptions, there is no assurance that the expected results will be achieved. These statements include (without limitation) statements as to future expectations, beliefs, plans, strategies, objectives, events, conditions, and financial performance. In connection with the "safe harbor" provisions of the Private Securities Litigation Reform Act of 1995, Ameren is providing this cautionary statement to identify important factors that could cause actual results to differ materially from those anticipated. In addition to factors discussed in this presentation, Ameren’s Annual Report on Form 10-K for the year ended December 31, 2015, and its other reports filed with the SEC under the Securities Exchange Act of 1934 contain a list of factors and a discussion of risks which could cause actual results to differ materially from management expectations suggested in such “forward- looking” statements. All “forward-looking” statements included in this presentation are based upon information presently available, and Ameren, except to the extent required by the federal securities laws, undertakes no obligation to update or revise publicly any “forward-looking” statements to reflect new information or current events. Earnings Guidance and Growth Expectations In this presentation, Ameren has presented 2016 earnings guidance that was issued and effective as of November 4, 2016, and growth expectations that were issued and effective as of February 19, 2016. The 2016 earnings guidance assumes normal temperatures for the last three months of this year and is subject to the effects of, among other things, changes in 30-year U.S. Treasury bond yields; regulatory, judicial and legislative actions; energy center and energy distribution operations; energy, economic, capital and credit market conditions; severe storms; unusual or otherwise unexpected gains or losses; and other risks and uncertainties outlined, or referred to, in the Forward-looking Statements section of this presentation and in Ameren’s periodic reports filed with the SEC.
  • 3. 3 Company Description Fully rate-regulated electric and gas utility • 2.4 million electric and 0.9 million gas customers • 10,200 MW of regulated electric generation capability • 4,600 circuit miles of FERC-regulated electric transmission • Electric generation, transmission and distribution and gas distribution business • Serves 1.2 million electric and 0.1 million gas customers • 10,200 MW of total generation capability • Regulated by MoPSC Ameren Missouri Ameren Illinois • Electric and gas distribution business regulated by ICC • Serves 1.2 million electric and 0.8 million gas customers • Electric transmission business regulated by FERC Electric Transmission • ATXI invests in regional multi-value projects • Ameren Illinois invests in local reliability projects • Regulated by FERC Ameren Corporation
  • 4. 4 Our Value Proposition to Investors Strong long-term growth outlook • Expect ~6.5% compound annual rate base growth from 2015 through 20201 – Sustainable infrastructure investment pipeline • Expect 5% to 8% compound annual EPS growth from 2016 through 20201 – Based on Feb. 2016 adjusted 2016 EPS guidance of $2.632 Attractive dividend • Recently increased quarterly dividend to annualized equivalent rate of $1.76 per share – Reflects confidence in long-term strategy – Expect payout ratio to range between 55% to 70% of annual earnings • Recently increased dividend rate provides 3.4%3 yield – Above average yield compared to regulated utility peers Attractive total return potential • Superior combined earnings growth outlook and yield compared with regulated utility peers • Committed to executing our strategy that we believe will deliver superior long-term value to both customers and shareholders 1 Issued and effective as of Feb. 19, 2016 Earnings Conference Call. 2 Which was Feb. 19, 2016 guidance mid-point of $2.50 excluding then- estimated $0.13 temporary net effect of lower sales to New Madrid smelter. 3 Based on Jan. 10 , 2017 closing share price.
  • 5. Solid Operating Performance # Average Residential Electricity Prices1 Electric rates are low Safety has improved Delivery system reliability has improved Generating plant performance remains strong BETTER BETTER BETTER BETTER BETTER 0 50 100 150 0 200 400 600 LostWorkday Cases RecordableCases Recordable Cases Lost Workday Away Cases 60 120 180 0.6 1.0 1.4 1.8 Outageduration (min.) Outagefrequency (year) SAIFI SAIDI 0% 20% 40% 60% 80% 100% Net Capacity Factor Equivalent Availability Factor Distribution System Reliability2 Baseload Energy Center Performance Safety Performance 5 1 Source: EEI Typical Bills and Average Rates Report for the twelve month period ending June 30, 2016. Includes major U.S. metropolitan areas for which EEI data is available. 2 As measured by System Average Interruption Frequency Index (SAIFI), which measures total number of interruptions per customer served and System Average Interruption Duration Index (SAIDI), which measures the average outage duration for each customer served. 0 5 10 15 20 25 30 ¢/KWh
  • 6. 6 Our Strategic Plan • Investing in and operating our utilities in a manner consistent with existing regulatory frameworks • Enhancing regulatory frameworks and advocating for responsible energy policies • Creating and capitalizing on opportunities for investment for the benefit of our customers and shareholders
  • 7. 7 Our Regulatory Frameworks1 FERC-regulated electric transmission service • Formula ratemaking; nearly eliminates regulatory lag – Current allowed ROE is 10.82%, which includes the MISO participation adder of 50 basis points – Rates reset each Jan. 1 based on forward-looking calculation with annual reconciliation – Constructive rate treatment for ATXI’s three MISO-approved multi-value projects, including construction work in progress in rate base and 56% hypothetical equity ratio during development Illinois electric delivery service • Formula ratemaking recently extended through 2022; nearly eliminates regulatory lag – Allowed ROE is 580 basis points above annual average yield of 30-year U.S. Treasury – Provides recovery of prudently incurred actual costs; based on year-end rate base – Revenue decoupling; enhanced framework for energy efficiency Illinois gas delivery service • Future test year ratemaking with infrastructure rider; minimizes regulatory lag – Allowed ROE is 9.6% – Volume balancing adjustment for residential and small nonresidential customers Missouri electric service • Historical test year ratemaking; results in regulatory lag – Allowed ROE is 9.53% – Fuel adjustment clause recovery mechanism; pension and other postretirement benefits cost tracking mechanism; constructive energy efficiency framework 1 See information on recent developments for: FERC on page 28; Illinois on page 12; and Missouri on pages 13-15.
  • 8. Investing Strategically, Consistent with Regulatory Frameworks1 8 1 Issued and effective as of Feb. 19, 2016 Earnings Conference Call. 2 Reflects year-end rate base except for FERC-regulated transmission, which is average rate base. Includes construction work in progress for ATXI multi-value projects. 3 Ameren Illinois and ATXI. Excludes Ameren Missouri transmission, which is included in bundled Missouri rates. 2015 to 2020E Regulated Infrastructure Rate Base2 '15-'20E 20% 11% 6% 2% ~6.5% 5-Yr Rate Base CAGR Ameren Missouri $4.1 B 37% Ameren Illinois Gas Delivery $1.4 B 13% Ameren Illinois Electric Delivery $2.6 B 23% Ameren Illinois Transmission $2.0 B 18% ATXI $1.0 B 9% $11.1 Billion of Regulated Infrastructure Investment 2016-2020 $7.1 $7.9 $2.4 $3.3$1.2 $2.0 $12.1 $16.7 2015 2020E ($Billions) FERC-Regulated Transmission Ameren Illinois Gas Delivery Ameren Illinois Electric Delivery Ameren Missouri $3.5 $1.4 % of Total 3 53% 41% 47%59%
  • 9. Investing Strategically, with Focus on Transmission and Distribution 9 2015 to 2020E Regulated Infrastructure Rate Base1 66% 73% 14% 12%4% 2% 16% 13% 100% 100% 2015 2020E Coal Generation Gas Generation Nuclear and Renewables Generation Electric and Gas Transmission and Distribution • We will continue to be strategic and disciplined in our investment approach • Investing to modernize the grid to make it smarter and to meet our customers’ future energy needs and expectations – Electric and gas transmission and distribution investments are expected to comprise nearly 75% of total rate base by the end of 2020 • Disciplined investment enables transition of generation to a cleaner, more diverse portfolio – Total rate base investment in coal and gas-fired generation is expected to decline to 15% by 2020 – Meramec coal- and gas-fired energy center scheduled to close in 2022 – New 20-year Missouri Integrated Resource Plan, to be filed with MoPSC in Oct. 2017 1 Reflects year-end rate base except for FERC-regulated transmission, which is average rate base.
  • 10. 1010 2016-2020 Capital Expenditure Funding Plan1 • Return of capital through depreciation in rates • Retained earnings • ~$2.5-$2.6 billion of income tax deferrals and assets – Income tax deferrals driven primarily by capital expenditures • ~$930 million due to extension of bonus tax depreciation – Includes ~$680 million of tax assets at Sept. 30, 2016 • Net operating losses, tax credit carryforwards, expected tax refunds and state over- payments • Parent company portion of tax assets was ~$420 million • Expected to be realized into 2021 • No equity issuances expected • Debt financing • Capitalization target: ~50% equity 1 Issued and effective as of Feb. 19, 2016 Earnings Conference Call unless otherwise noted.
  • 11. 11 Creating and Capitalizing on Opportunities beyond 2020 Illinois Electric and Natural Gas Delivery • System modernization projects including replacement of aging substations and electric distribution and gas distribution infrastructure, including expected new federal safety regulations for gas systems FERC-Regulated Electric Transmission • Local reliability projects in our service territory, including NERC compliance, replacement of aging infrastructure and modernization of grid • Pursue opportunities to upgrade grid to maintain system voltages and reliability as generation closes • FERC Order 1000 opportunities focusing on MISO, PJM and SPP regions Missouri • Replacement of aging transmission and distribution infrastructure • Opportunities related to transition to cleaner, more diverse energy portfolio including installation of renewable energy sources and transmission projects • Incremental investments enabled by supportive energy policies including smart meters, substations and other equipment, underground grid, transmission and renewables Company Wide • Information technology and cybersecurity Customer and Community Benefits Improved reliability and safety, greater control of energy usage and costs, market efficiency, a cleaner, more diverse energy portfolio, enhanced cybersecurity and significant job creation
  • 12. 1212 • Future Energy Jobs Bill (Senate Bill 2814) enacted in Dec. 2016; effective June 1, 2017 • Enhances and extends Ameren Illinois’ electric distribution framework – Extends constructive formula ratemaking through 2022 • Enables continuation of Ameren Illinois’ strong rate base growth plan – Allows capitalization of and ability to earn return on energy efficiency spend • Previously expensed as incurred; expect spend to average ~$110 million/year – Provides revenue decoupling • Eliminates margin erosion due to, among other things, energy efficiency • Ensures consistent ability to earn allowed ROE – Deems common equity ratio of up to and including 50% as prudent Illinois Energy Legislation Customer and Community Benefits Strong customer rate impact protections; enables greater investment, incl. in energy efficiency; creates more reliable, smarter grid; retains cleaner energy sources; and preserves jobs
  • 13. 13 Efforts to Enhance Missouri Regulatory Framework • MoPSC - opened case to consider policies to improve way it regulates electric utilities – Ameren Missouri and other electric investor-owned utilities identified several approaches to enhance regulatory framework to support investment – In Sept. 23 filing, Ameren Missouri outlined potential incremental investments in detail • $1 billion over five years ending 2022, with more than $4 billion over ten years • Smart meters, aging substations and other equipment, underground grid, transmission and renewables – In Oct. 17 report, MoPSC Staff stated it was not opposed to several approaches for supporting targeted investments which would continue to include strong MoPSC oversight – In Dec. 6 report, MoPSC stated it generally agreed with and supported the Oct. Staff report and recommended General Assembly consider certain principles in drafting any legislation that encourages utility investment in grid modernization • Senate Interim Committee - evaluated ways to modernize utility regulatory process – In Dec. 28 report, Committee majority recommended legislation setting forth a new regulatory framework for electric utilities, including a performance-based ratemaking approach that includes an annual rate review process that more closely matches revenues with costs • Legislation has been introduced in the Missouri Senate to modernize electric utility regulation for the benefit of customers and the state – Senate Bills 190, 214 and 215 Customer and Community Benefits Enhanced regulatory framework would enable greater investment to create more reliable, smarter grid; facilitate transition to cleaner, more diverse energy portfolio; help protect against physical and cyber security attacks; better position Missouri for future; and create significant jobs
  • 14. 1414 • The Missouri Economic Development and Infrastructure Investment Act (SB 190) – Deferral between rate cases of depreciation on capital projects placed in- service and of return on incremental rate base • Deferrals added to rate base and recovered over 20 years, subject to revenue requirement cap of 0.75% for every 12 months between rate cases – Inclusion of transmission charges and revenues in fuel adjustment clause – Property tax, cyber and physical security cost trackers – MoPSC authority to utilize certain rate adjustment mechanisms to promote modernization and replacement of infrastructure – Economic development incentives for large electricity consumers – Continued strong MoPSC oversight and consumer protections Proposed Missouri Energy Legislation Customer and Community Benefits Enhanced regulatory framework would enable greater investment to create more reliable, smarter grid; facilitate transition to cleaner, more diverse energy portfolio; help protect against physical and cyber security attacks; better position Missouri for future; and create significant jobs
  • 15. 1515 • The 21st Century Grid Modernization and Security Act (SB 214) – Electric utilities may participate in performance-based ratemaking framework that would provide timely recovery of actual, prudently incurred costs – Allowed ROE tied to yield of 30-year U.S. treasury and performance on certain metrics – Important customer benefits including earnings caps, rate stabilization mechanisms, utility performance standards and strong oversight by Missouri Public Service Commission – Economic development incentives for large electricity consumers • SB 215 allows MoPSC to utilize certain rate adjustment mechanisms to promote modernization and replacement of electric utility infrastructure – Directs MoPSC to support electric utility infrastructure investments for reliability, safety, security, or automation of infrastructure – Allows MoPSC to use partially forecasted test-years, true-ups of revenue requirement components, tracking mechanisms, grid modernization incentive mechanisms, interim rates, performance-based rates, decoupling, or decisional pre-approval with post construction review for construction projects Proposed Missouri Energy Legislation, cont’d Customer and Community Benefits Enhanced regulatory framework would enable greater investment to create more reliable, smarter grid; facilitate transition to cleaner, more diverse energy portfolio; help protect against physical and cyber security attacks; better position Missouri for future; and create significant jobs
  • 16. 16 Select Regulatory Proceedings and Potential Tax Reform Illinois electric delivery service • In Dec., the ICC approved a $14 million net annual decrease in electric delivery formula rates effective Jan. 2017, in line with Ameren Illinois’ request – Each year’s electric distribution service earnings are a function of the rate formula and are not directly determined by that year’s rate update filing Missouri electric service • $206 million annual electric revenue increase request filed July 1 with MoPSC – Includes recovery of, and return on, new infrastructure investments – Removes prospectively the negative earnings effects of lower sales to New Madrid smelter – Seeks implementation of a new transmission cost tracker – MoPSC order expected in late April 2017 with new rates effective in late May 2017 FERC-regulated electric transmission service • Second MISO ROE complaint case seeks to reduce allowed base ROE, which is now 10.32% – FERC final order on first complaint case adopted ALJ’s recommended 10.32% base ROE – FERC final order on second complaint case expected in Q2 2017; ALJ recommended 9.70% base ROE – MISO participation adder of up to 50 basis points to base ROE results in current allowed ROE of 10.82% Potential federal corporate tax reform • Ameren working with utility industry to analyze and shape reform proposals – Areas of focus include: tax rate, accelerated depreciation of capital investments, key deductions and return of excess deferred taxes to customers
  • 17. 17 Our Value Proposition to Investors Strong long-term growth outlook • Expect ~6.5% compound annual rate base growth from 2015 through 20201 – Sustainable infrastructure investment pipeline • Expect 5% to 8% compound annual EPS growth from 2016 through 20201 – Based on Feb. 2016 adjusted 2016 EPS guidance of $2.632 Attractive dividend • Recently increased quarterly dividend to annualized equivalent rate of $1.76 per share – Reflects confidence in long-term strategy – Expect payout ratio to range between 55% to 70% of annual earnings • Recently increased dividend rate provides 3.4%3 yield – Above average yield compared to regulated utility peers Attractive total return potential • Superior combined earnings growth outlook and yield compared with regulated utility peers • Committed to executing our strategy that we believe will deliver superior long-term value to both customers and shareholders 1 Issued and effective as of Feb. 19, 2016 Earnings Conference Call. 2 Which was Feb. 19, 2016 guidance mid-point of $2.50 excluding then- estimated $0.13 temporary net effect of lower sales to New Madrid smelter. 3 Based on Jan. 10, 2017 closing share price.
  • 19. 19 Earnings Analysis for Nine Months Ended Sept. 30 Key Core Earnings Variance Drivers  Increased electric transmission and distribution infrastructure investments by ATXI and Ameren Illinois, including changes in allowed ROEs: +$0.17  Higher Illinois natural gas distribution service rates incorporating increased infrastructure investments and allowed ROE: +$0.09  Warmer summer temperatures partially offset by milder winter temperatures: ~+$0.09 – ~+$0.11 vs. normal temperatures  Q1 2016 tax benefits associated with share-based compensation: +$0.09  Net effect of lower sales to New Madrid smelter: $(0.13)  Callaway nuclear refueling and maintenance outage vs. none in 2015: $(0.08)  Carryover effect of Missouri 2013-2015 energy efficiency plan, net of performance incentive award: $(0.07) – Performance incentive award: +$0.05  Absence of 2015 recovery of certain cumulative Ameren Illinois power usage costs: $(0.04) Core Diluted EPS1 YTD 2015 vs. YTD 2016 $2.44 $2.56 2015 2016 1 Core (non-GAAP) earnings per share exclude 2015 results of discontinued operations and a 2015 provision for discontinuing pursuit of a license for a second nuclear unit at the Callaway Energy Center. See page 20 for GAAP to core results reconciliation.
  • 20. 20 GAAP to Core Earnings Reconciliation (In millions, except per share amounts) Nine Months Ended Sept. 30, 2015 2016 GAAP Earnings / Diluted EPS $ 601 $ 2.47 $ 621 $ 2.56 Results from discontinued operations Operating income before income tax (3) (0.01) — — Income tax benefit (49) (0.20) — — Income from discontinued operations, net of taxes (52) (0.21) — — Provision for discontinuing pursuit of license for second nuclear unit at Callaway Energy Center Provision before income tax 69 0.29 — — Income tax expense (26) (0.11) — — Provision, net of taxes 43 0.18 — — Core Earnings / Diluted EPS $ 592 $ 2.44 $ 621 $ 2.56
  • 21. 21 2016 EPS Guidance1: Select Balance of Year Considerations Q4 2016E compared to Q4 2015:  Return to normal temperatures: ~+$0.08  Increased electric transmission and distribution service infrastructure investments by ATXI and Ameren Illinois partially offset by lower Illinois electric delivery service allowed ROE  Higher Illinois natural gas distribution service rates incorporating increased rate base and allowed ROE  Unfavorable carryover impacts of Missouri 2015 energy efficiency plan partially offset by additional performance incentive award recognition: ~$(0.08)  Lower Missouri electric sales to New Madrid smelter: ~$(0.02)  Increased Missouri depreciation and transmission expenses 2016E Diluted EPS $2.65 $2.75 1 Issued and effective as of Nov. 4, 2016 Earnings Conference Call.
  • 22. 22 Select 2017 Earnings Considerations1 1 Issued and effective as of Nov. 4, 2016 Earnings Conference Call. 2 Estimated FERC-regulated average rate base for Ameren Illinois and ATXI are $1.4 billion and $1.1 billion for 2017, respectively, compared to $1.2 billion and $0.9 billion for 2016, respectively. FERC-Regulated Electric Transmission  Higher average estimated rate base: ~$2.52 billion compared to estimated ~$2.12 billion in 2016 reflecting infrastructure investments made under formula ratemaking • Expect lower projected weighted average allowed ROE vs. 2016 Ameren Illinois Electric and Gas Delivery  Higher year-end rate base for electric delivery reflecting infrastructure investments made under formula ratemaking • Allowed ROE will be 2017 average 30-year Treasury yield plus 5.8%  Gas distribution infrastructure investments qualifying for rider treatment Ameren Missouri  Increased electric service rates expected in late May 2017 • Reflecting new infrastructure investments, as well as more recent sales and cost levels • Removal of negative effect of lower sales to New Madrid smelter: ~+$0.12  Increased depreciation, transmission and property tax expenses  Absence of 2016 performance incentive award related to 2013-2015 energy efficiency plan: $(0.07) ▬ Callaway refueling and maintenance outage scheduled for fall 2017 vs. spring 2016 Parent and Other  Lower tax benefits associated with share-based compensation  Return to normal temperatures: ~($0.11) through Sept. 30, 2016
  • 24. Significant FERC-Regulated Transmission Investment Planned $3.0 billion investment – 2016-20201 • $1.0 billion of regional multi-value projects at ATXI • $2.0 billion of local reliability and connecting portions of regional multi- value projects at Ameren Illinois Total Multi-Value Project Costs2 • Illinois Rivers Project - $1.4 billion – ATXI ~$1.3 billion; Ameren Illinois ~$100 million – Under construction; expect to complete in 2019 • Spoon River Project - $150 million – ATXI ~$145 million; Ameren Illinois ~$5 million – ICC issued CPCN in Sept. 2015; line clearing has begun and significant line construction expected to begin in Jan. 2017 with completion in 2018 • Mark Twain Project - $225 million – 100% ATXI project • CCN for Mark Twain approved by MoPSC; pursuing county assents for road crossings – Anticipate construction to begin in 2017 with completion in 2018/2019 Regional Multi-Value Projects 24 1 Issued and effective as of Feb. 19, 2016 Earnings Conference Call. 2 Includes pre-2016 expenditures.
  • 25. 25 Pending Missouri Electric Rate Case PROCEDURAL SCHEDULE KEY DATES: Dec. 9, 2016 Revenue requirement testimony of MoPSC Staff and intervenors was filed Feb. 24, 2017 MoPSC Staff reconciliation of parties’ positions due Feb. 27, 2017 Evidentiary hearings begin Late April 2017 MoPSC order expected May 28, 2017 New rates effective by this date • $206 million annual electric revenue increase request filed July 1, 2016 with MoPSC, which would result in an average 7.8% increase in base rates – ROE: 9.9% vs. 9.53% in April 2015 order – Equity ratio: 51.8% (Dec. 31, 2016 estimate) vs. same ratio in April 2015 order – Rate base: $7.2 billion (Dec. 31, 2016 estimate) vs. $7.0 billion in April 2015 order – Test year ended Mar. 31, 2016, with certain pro-forma adjustments through Dec. 31, 20161 • Continuation of fuel adjustment clause – Continued 95%/5% sharing of variances from net energy costs included in base rates • Cost tracking mechanisms – Continuation of pension and OPEB tracker – Continuation of uncertain income tax positions tracker – Implementation of a new transmission tracker 1 Through Jan. 1, 2017 for fuel, transportation, MISO multi-value transmission project expenses and payroll costs.
  • 26. 2626 Pending Missouri Electric Rate Case, cont’d • Key drivers of requested $206 million annual revenue increase – New electric infrastructure investments: +$74 million • Depreciation: $39 million; return on rate base: $25 million; and property taxes1: $10 million – Reduced customer sales, less related net energy costs2: +$51 million • Removes prospectively the negative earnings effects of lower sales to New Madrid smelter – Recovery of increased transmission expenses: +$34 million • Includes Jan. 1, 2017 rates for MISO multi-value projects – Changes to tracked pension/OPEB and solar rebate expenses: $(24) million and $(15) million, respectively – Increased net energy costs, excluding reduced New Madrid smelter and other sales: +$23 million – Increased income taxes: +$15 million – Amortization over 10 years of estimated $81 million of lost fixed costs due to lower sales to New Madrid smelter: +$8 million – Other, net - largely to recover increased expenses: +$40 million 1 On new investments and from higher property tax rates. 2 Net energy costs, as defined in the FAC, include fuel and purchased power costs, including transportation but excluding transmission revenues and substantially all transmission charges, net of off-system sales revenues.
  • 27. 27 Pending Missouri Electric Rate Case, cont’d1 • MoPSC Staff recommended $52 million annual rate increase on Dec. 9 – ROE: 8.75% (7.9% to 8.85% range) vs. 9.9% request • MIEC and MECG recommended 9.2% (9.0% to 9.4% range) – Equity ratio: use of Ameren consolidated 50.5% vs. Ameren Missouri’s 51.8% request • MoPSC has historically used Ameren Missouri’s equity ratio – Rate base: $7.1 billion vs. $7.2 billion request • Key observations of Staff recommendation ($ difference compared to request) – ROE: $(67) million; Equity ratio: $(8) million – Removed prospectively negative earnings effects of lower sales to New Madrid smelter – Continuation of fuel adjustment clause – Reflected update for transmission costs effective Jan. 1, 2017, but opposed tracker2 – Continuation of pension/OPEB and uncertain income tax positions trackers – No significant difference in net energy costs or income taxes – Opposed amortization of lost fixed costs due to New Madrid smelter2: $(8) million – Various other cost and amortization updates, normalizations and disallowances 1 Ameren Missouri‘s analysis and estimates. Ameren request and Staff and Intervenor recommendations to be trued-up through Dec. 31, 2016 for select items. 2 MIEC supports Staff recommendation to oppose.
  • 28. 2828 • Cases sought to reduce Ameren Illinois’ and ATXI’s transmission service allowed base ROE – In first case, FERC final order issued Sept. 28, 2016 confirmed ALJ initial recommendation of a 10.32% base ROE • Maximum ROE including incentives not to exceed 11.35% – In second case, ALJ initial decision issued June 30, 2016 recommended a 9.70% base ROE • FERC final order expected in Q2 2017 • Reserve for potential refunds • FERC approved adder of up to 50 basis points to base ROE, effective Jan. 6, 2015, for MISO participation – Subject to “zone of reasonableness” – Results in current FERC allowed ROE of 10.82% FERC MISO Complaint Cases Regarding MISO base ROE
  • 29. 29 Select Regulatory and Legislative Matters Illinois Commerce Commission • Electric distribution rate update: Docket No. 16-0262 • Website: http://www.icc.illinois.gov Missouri General Assembly / Missouri Public Service Commission • Senate Bills 190, 214 and 215: http://www.senate.mo.gov/17info/BTS_Web/BillList.aspx?SessionType=R • Report of Senate Interim Committee on Utility Regulation and Infrastructure Investment: http://www.senate.mo.gov/16info/Comm/Interim/SIRI-Final-Rpt.pdf • 2016 electric rate case: Docket No. ER-2016-0179 • MoPSC order granting CCN for ATXI’s Mark Twain transmission project: Docket No. EA-2015-0146 • MoPSC working case to consider policies to improve electric utility regulation: Docket No. EW-2016-0313 • MoPSC website: https://www.efis.psc.mo.gov/mpsc/DocketSheet.html Federal Energy Regulatory Commission • Complaint challenging MISO base ROE: Docket No. EL15-45 • Website: http://elibrary.ferc.gov/idmws/search/fercadvsearch.asp Other Filings • Ameren Illinois & ATXI Projected 2017 Attachment O: http://www.oasis.oati.com/woa/docs/AMRN/AMRNdocs/2017_Transmission_Rates_List.html
  • 30. Investor Relations Calendar 30 • Jan 12 Evercore ISI Utility Conference • Jan 14 Q4 quiet period begins JANUARY 2017 SUN. MON. TUES. WED. THUR. FRI. SAT. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Evercore ISI Utility Conf. Q4 Quiet Period begins 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 FEBRUARY 2017 SUN. MON. TUES. WED. THUR. FRI. SAT. 1 2 3 4 Q4 Quiet Period cont’d 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Q4 Earnings Release 19 20 21 22 23 24 25 29 30 31 • Feb. 16 Q4 2016 earnings release and call (tentative)
  • 31. 31 Glossary of Terms and Abbreviations ALJ – Administrative Law Judge. AMI – Automated Meter Infrastructure. ATXI – Ameren Transmission Company of Illinois. B – Billion. CAGR – Compound annual growth rate. CCN – Certificate of Convenience and Necessity. Core – (Non-GAAP) earnings exclude income or loss from discontinued operations and income or loss from significant discrete items that management does not consider representative of ongoing earnings. See page 20 for GAAP to core results reconciliations for the nine months ended September 30, 2015. CPCN – Certificate of Public Convenience and Necessity. E – Estimated. EPS – Earnings per share. FAC – Fuel adjustment clause. FERC – Federal Energy Regulatory Commission. GAAP – Generally Accepted Accounting Principles. ICC – Illinois Commerce Commission. M – Million. MECG – Midwest Energy Consumers Group. MIEC – Missouri Industrial Energy Consumers. MISO – Midcontinent Independent System Operator, Inc. MoPSC – Missouri Public Service Commission. MWh – Megawatthour. NERC – North American Electric Reliability Corporation. New Madrid smelter – New Madrid, Missouri aluminum smelter, (formerly owned by Noranda). Noranda – Noranda Aluminum, Inc. OPEB – Other Post-Employment Benefits. PJM – PJM Interconnection. GAAP – Generally Accepted Accounting Principles. SB – Senate Bill. SEC – U.S. Securities and Exchange Commission. SPP – Southwest Power Pool.