An Introduction to Failure
Most projects start out as great ideas. But, somewhere
along the way, mistakes are made, communication
breaks down, and, most projects—70% of them— end
up late, over budget, and on the way to the project
dumpster.
An Introduction to Failure
The following 8 projects failed epically, but therein are
contained lessons any smart work manager can benefit
from, like:
• The value of getting project goals aligned
• The wisdom of controlling requirements and budget
• The need to set and adhere to realistic deadlines
When growth outpaced
communication, the once
unbeatable empire broke
into two empires: the
Greek in the East and the
Latin in the West.
# 8
The Outcome:
• Cultures were divided.
• Communities threw up
silos.
• Resources went unused.
# 8
It could’ve been different if
they had:
• Focused on increasing
the quality and frequency
of their communication
• Regularly aligned their
priorities around shared
goals
# 8
The Takeaway: Misaligned
goals leave a project with
scattered priorities and
complicate communication.
To keep your project on
track, find a way to facilitate
healthy collaboration and
agree on a single target –
regardless of the distance.
# 8
The roofless Sinclair C5
was supposed to be a better,
more affordable way to
commute. Unfortunately, it
went into production
without considering one
immutable fact: its market
was in the rain-heavy
United Kingdom.
# 7
The Outcome:
• The vehicle couldn’t
reverse or steer.
• Consumers bought only
17,000 units of the rain-
vulnerable design.
• Sinclair Vehicles filed
for bankruptcy 11
months later.
# 7
It could’ve been different if
they had:
• Taken more time to
understand customer
requirements before
starting
• Put proper quality
assurance checkpoints
in place during the
project
# 7
The Takeaway: Successful
projects have complete
visibility into the quality of
their products and the needs
of the customer. If the
Sinclair team would have
spent more time prioritizing
these requirements, they
might have sold more than a
paltry 17,000 units.
# 7
What would be the world’s
largest commercial aircraft,
the Airbus A380 required
production in facilities
across the globe.
Unfortunately, these teams
were using different CAD
programs.
# 6
The Outcome:
• During installation, they
discovered the parts
designed by different
teams didn’t fit together.
• As they went back to the
drawing board, the
project was set back two
years and $6.1 billion
over budget.
# 6
It could’ve been different if
they had:
• Aligned the different
teams on one software
to ensure design.
• Communicated more
regularly from team to
team, instead of waiting
for installation to see if
parts would match.
# 6
The Takeaway: Many
successful projects avoid
failure in large part by
implementing these two key
differentiators: a single
system of truth and
collaboration among teams
whether they share the same
office or occupy hallways
across the globe.
# 6
Early on, the sort-of SUV
crossover drifted down a sad
road when the production
team failed to inform the
designers that the vehicle
had to be based on an
existing minivan platform.
# 5
The Outcome:
• It was dubbed “one of the
ugliest cars ever made.”
• The vehicle’s target
audience rejected its
look, price, and add-ons.
• GM sold only 27,322
units, short even of its
modest break-even
estimates.
# 5
It could’ve been different if
they had:
• Taken more time to
understand their target
audience and their
requirements
• Increased communication
between the production
and design teams, which
came too little, too late.
# 5
The Takeaway: Successful
projects establish up front
who needs to know what and
who is responsible for
communicating that
information. The minivan
platform requirement
ultimately changed the entire
look and destiny of the
Pontiac Aztek.
# 5
The global warming epic’s
production was supposed to
be 96 days at $100 million.
Several script rewrites, one
tropical storm, and one
AWOL director later, the
shoot was way past due and
drowning in an overflowing
budget.
# 4
The Outcome:
• Shooting started without
a complete script,
resulting in lots of re-
shoots.
• The shoot stretched to 150
days and went $135
million over budget.
• Bad publicity doomed
the intended blockbuster
to only modest box office.
# 4
It could’ve been different if
they had:
• Secured a finished script
prior to the start of
filming
• Performed meteorological
research on the area where
they would be filming
(the Hawaiian coast) and
how weather might affect
their filming schedule
# 4
The Takeaway: Successful
projects aren’t anomalies.
They, too, deal with shifting
priorities and resource swaps.
What sets them apart from
failed projects is the ability to
foresee problems and prevent
major disasters. Much of this
battle is won in the planning
phase.
# 4
Millions were spent to make
sure people knew Windows
Vista would be the greatest
thing ever. But constant
changes delayed its release,
and Vista fell short of inflated
expectations—slower, less
secure, and less popular than
its predecessor.
# 3
The Outcome:
• One-third of all new PC
owners abandoned Vista
in favor of Windows XP.
• Delays caused Vista to be
released in the slowest
selling season of the year.
• Existing software on the
market wasn’t
compatible with Vista.
# 3
It could’ve been different if
they had:
• Nailed down a fixed set of
strategic objectives,
instead of fixating on
features
• Settled for a manageable
set of initial requirements,
then planned post-release
iterations to add the bells
and whistles
# 3
The Takeaway: Delay after
delay created an anticipation
to which few products could
measure up. In this high-
stakes context, project leaders
failed to manage
expectations, get complete
visibility into the real issues,
and follow a strict timeline
for the product’s release.
# 3
When Knight Capital was
brought on to work on new
code for a new SEC program,
an aggressive deadline was
set. It’s highly likely, experts
say, that Knight Capital, short
on time, went to production
with test code.
# 2
The Outcome:
• A glitch cost the company
$440 million in the first
30 minutes of trading—3x
their annual earnings.
• Company stock fell 75%
in just two days.
• The company nearly went
bankrupt and had to take
out a $400-million line of
credit.
# 2
It could’ve been different if
they had:
• Invested in better resource
management to forecast
how long the project
would feasibly take and
avoid setting an arbitrary
deadline
• Established a more robust
quality assurance process
# 2
The Takeaway: Successful
projects utilize the resources
they have and outsource work
they can’t complete if they’re
on a deadline. Successful
project managers build in
time for proper QA.
# 2
Malfunctioning rings. Hotels
missing floors. The worst
case of pink eye ever.
Runaway deadlines and
nonexistent transparency took
the 2014 Olympic Games
way over budget and under-
whelming in front of a global
audience.
# 1
The Outcome:
• Hotels, venues, and the
Opening Ceremonies
were riddled with
embarrassing faux pas.
• From an original $12-
billion budget, the Sochi
Games ballooned to an
astonishing $51 billion—
4x the original budget.
# 1
It could’ve been different if
they had:
• Based project completion
deadlines on historical
project data
• Made real-time reports
on all projects and tasks
transparent to all team
members and stakeholders
• Invested in increased cost
management measures
# 1
The Takeaway: Successful
projects account for all things
planned and unplanned.
Building in buffer time for
unanticipated problems and
fire-drill requests will keep
projects on track, on budget,
and on time—a lesson the
Sochi Olympic team learned
the hard way.
# 1
A Conclusion to Failure
Yes, hindsight is 20/20. However, with rare exception,
even the biggest project failures can be avoided by
improving requirements-gathering, alignment, and
estimates during the planning phase and increasing
communication and reporting during production.
The 8 Worst Managed Projects of All Time
The 8 Worst Managed Projects of All Time

Más contenido relacionado

La actualidad más candente

IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)
jimmcdonaldpmp
 
Project Business Case
Project Business CaseProject Business Case
Project Business Case
Nader Jarmooz
 
Strategic PMO Implementation تأسيس وتشغيل مكتب إدارة المشاريع الإستراتيجي
Strategic PMO Implementation  تأسيس وتشغيل مكتب إدارة المشاريع الإستراتيجيStrategic PMO Implementation  تأسيس وتشغيل مكتب إدارة المشاريع الإستراتيجي
Strategic PMO Implementation تأسيس وتشغيل مكتب إدارة المشاريع الإستراتيجي
Abdelrahman Elsheikh PMOC,PMP,CBAP,RMP,ACP,SP,MCITP,ITIL
 

La actualidad más candente (20)

Apm body of knowledge 6th edition
Apm body of knowledge 6th editionApm body of knowledge 6th edition
Apm body of knowledge 6th edition
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
Digital Value Realization | BPO Presentation
Digital Value Realization | BPO PresentationDigital Value Realization | BPO Presentation
Digital Value Realization | BPO Presentation
 
Patterns of Kanban Maturity
Patterns of Kanban MaturityPatterns of Kanban Maturity
Patterns of Kanban Maturity
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
PMO Charter Template
PMO Charter TemplatePMO Charter Template
PMO Charter Template
 
PMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visioPMBOK six edition dataflow diagram by english with MS-visio
PMBOK six edition dataflow diagram by english with MS-visio
 
Como crear y gestionar un Product Backlog orientado a resultados
Como crear y gestionar un Product Backlog orientado a resultadosComo crear y gestionar un Product Backlog orientado a resultados
Como crear y gestionar un Product Backlog orientado a resultados
 
RethinkingAgile_AAC2019
RethinkingAgile_AAC2019RethinkingAgile_AAC2019
RethinkingAgile_AAC2019
 
The Agile PMO: From Process Police to Adaptive Leadership
The Agile PMO: From Process Police to Adaptive LeadershipThe Agile PMO: From Process Police to Adaptive Leadership
The Agile PMO: From Process Police to Adaptive Leadership
 
Project management
Project managementProject management
Project management
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1
 
IT Demand Management and Capacity Planning: Why Estimation Is Vital to Balanc...
IT Demand Management and Capacity Planning: Why Estimation Is Vital to Balanc...IT Demand Management and Capacity Planning: Why Estimation Is Vital to Balanc...
IT Demand Management and Capacity Planning: Why Estimation Is Vital to Balanc...
 
IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)IT PMO Charter (Linkedin)
IT PMO Charter (Linkedin)
 
Project Business Case
Project Business CaseProject Business Case
Project Business Case
 
Strategic PMO Implementation تأسيس وتشغيل مكتب إدارة المشاريع الإستراتيجي
Strategic PMO Implementation  تأسيس وتشغيل مكتب إدارة المشاريع الإستراتيجيStrategic PMO Implementation  تأسيس وتشغيل مكتب إدارة المشاريع الإستراتيجي
Strategic PMO Implementation تأسيس وتشغيل مكتب إدارة المشاريع الإستراتيجي
 
P contracts
P contractsP contracts
P contracts
 
Trino: A Ludicrously Fast Query Engine - Pulsar Summit NA 2021
Trino: A Ludicrously Fast Query Engine - Pulsar Summit NA 2021Trino: A Ludicrously Fast Query Engine - Pulsar Summit NA 2021
Trino: A Ludicrously Fast Query Engine - Pulsar Summit NA 2021
 
End-to-End Grant Management
End-to-End Grant ManagementEnd-to-End Grant Management
End-to-End Grant Management
 
Project portfolio management
Project portfolio managementProject portfolio management
Project portfolio management
 

Destacado

Destacado (18)

Project Management 101: Project Request Intake
Project Management 101: Project Request IntakeProject Management 101: Project Request Intake
Project Management 101: Project Request Intake
 
81 Tips From PM Experts: How to Be a Smarter, More Effective Project Manager
81 Tips From PM Experts: How to Be a Smarter, More Effective Project Manager81 Tips From PM Experts: How to Be a Smarter, More Effective Project Manager
81 Tips From PM Experts: How to Be a Smarter, More Effective Project Manager
 
7 Ways Generations Clash in the Workplace
7 Ways Generations Clash in the Workplace7 Ways Generations Clash in the Workplace
7 Ways Generations Clash in the Workplace
 
How to Prioritize Your Work
How to Prioritize Your WorkHow to Prioritize Your Work
How to Prioritize Your Work
 
Marketers are Clueless About Agile
Marketers are Clueless About AgileMarketers are Clueless About Agile
Marketers are Clueless About Agile
 
Agile Marketing: A Beginner's Guide
Agile Marketing: A Beginner's GuideAgile Marketing: A Beginner's Guide
Agile Marketing: A Beginner's Guide
 
Marketing Predictions 2016: Q&A With Ted Rubin, Robert Rose and More
Marketing Predictions 2016: Q&A With Ted Rubin, Robert Rose and MoreMarketing Predictions 2016: Q&A With Ted Rubin, Robert Rose and More
Marketing Predictions 2016: Q&A With Ted Rubin, Robert Rose and More
 
Marketers Time Management: What's happening to it, how they cope, and how to ...
Marketers Time Management: What's happening to it, how they cope, and how to ...Marketers Time Management: What's happening to it, how they cope, and how to ...
Marketers Time Management: What's happening to it, how they cope, and how to ...
 
A Beginner's Guide to IT Project Management
A Beginner's Guide to IT Project ManagementA Beginner's Guide to IT Project Management
A Beginner's Guide to IT Project Management
 
Are You a Micromanager?
Are You a Micromanager?Are You a Micromanager?
Are You a Micromanager?
 
The Battle of the Sexes in the Workplace
The Battle of the Sexes in the WorkplaceThe Battle of the Sexes in the Workplace
The Battle of the Sexes in the Workplace
 
How to Bypass Sucky Business Jargon
How to Bypass Sucky Business JargonHow to Bypass Sucky Business Jargon
How to Bypass Sucky Business Jargon
 
How Trek Bicycle kickstarted operations with AtTask
How Trek Bicycle kickstarted operations with AtTaskHow Trek Bicycle kickstarted operations with AtTask
How Trek Bicycle kickstarted operations with AtTask
 
5 Shocking Revelations From the UK Workplace
5 Shocking Revelations From the UK Workplace5 Shocking Revelations From the UK Workplace
5 Shocking Revelations From the UK Workplace
 
6 Tips for More Effective Status Meetings
6 Tips for More Effective Status Meetings6 Tips for More Effective Status Meetings
6 Tips for More Effective Status Meetings
 
Game of Phones: Phone Etiquette (and the Lack Thereof) in the Workplace
Game of Phones: Phone Etiquette (and the Lack Thereof) in the WorkplaceGame of Phones: Phone Etiquette (and the Lack Thereof) in the Workplace
Game of Phones: Phone Etiquette (and the Lack Thereof) in the Workplace
 
Four Keys to Managing Stakeholder Expectations and Delivering Value
Four Keys to Managing Stakeholder Expectations and Delivering ValueFour Keys to Managing Stakeholder Expectations and Delivering Value
Four Keys to Managing Stakeholder Expectations and Delivering Value
 
Accountability vs. Responsibility in Project Management
Accountability vs. Responsibility in Project ManagementAccountability vs. Responsibility in Project Management
Accountability vs. Responsibility in Project Management
 

Similar a The 8 Worst Managed Projects of All Time

Project failure reason 1
Project failure reason 1Project failure reason 1
Project failure reason 1
Arash Moto
 
Design ethics f
Design ethics fDesign ethics f
Design ethics f
R. Sosa
 

Similar a The 8 Worst Managed Projects of All Time (20)

Project Management Presentation.pptx
Project Management Presentation.pptxProject Management Presentation.pptx
Project Management Presentation.pptx
 
cPrime FBI Agile Success
 cPrime FBI Agile Success cPrime FBI Agile Success
cPrime FBI Agile Success
 
Managing international software projects interactively using scrum
Managing international software projects interactively using scrumManaging international software projects interactively using scrum
Managing international software projects interactively using scrum
 
Project failure reason 1
Project failure reason 1Project failure reason 1
Project failure reason 1
 
Rsc 07
Rsc 07Rsc 07
Rsc 07
 
Deterministic versus probabilistic
Deterministic versus probabilisticDeterministic versus probabilistic
Deterministic versus probabilistic
 
Eight things about hardware crowdfunding
Eight things about hardware crowdfundingEight things about hardware crowdfunding
Eight things about hardware crowdfunding
 
Digital Project Success
Digital Project SuccessDigital Project Success
Digital Project Success
 
1 Stop Shopping Program1.0
1 Stop Shopping Program1.01 Stop Shopping Program1.0
1 Stop Shopping Program1.0
 
Crowdfunding lessons learnt from Jolla Tablet & TOHKBD
Crowdfunding lessons learnt from Jolla Tablet & TOHKBDCrowdfunding lessons learnt from Jolla Tablet & TOHKBD
Crowdfunding lessons learnt from Jolla Tablet & TOHKBD
 
Liberating your Teams from Rigid Scope and Date Agreements.pdf
Liberating your Teams from Rigid Scope and Date Agreements.pdfLiberating your Teams from Rigid Scope and Date Agreements.pdf
Liberating your Teams from Rigid Scope and Date Agreements.pdf
 
The rise of the “gigaproject”
The rise of the “gigaproject”The rise of the “gigaproject”
The rise of the “gigaproject”
 
The art of execution
The art of executionThe art of execution
The art of execution
 
Ag09 Offshore Et Pratiques Agiles En
Ag09 Offshore Et Pratiques Agiles EnAg09 Offshore Et Pratiques Agiles En
Ag09 Offshore Et Pratiques Agiles En
 
Ecorl oer-al-ysb-star-up-funding-deepenings
Ecorl oer-al-ysb-star-up-funding-deepeningsEcorl oer-al-ysb-star-up-funding-deepenings
Ecorl oer-al-ysb-star-up-funding-deepenings
 
Bob Johnson: Change in the Resource Industry - An Opportunity for Innovation
Bob Johnson: Change in the Resource Industry - An Opportunity for Innovation Bob Johnson: Change in the Resource Industry - An Opportunity for Innovation
Bob Johnson: Change in the Resource Industry - An Opportunity for Innovation
 
Project Management 01
Project Management 01Project Management 01
Project Management 01
 
Profitable Website Projects - The Oreo Cookie Strategy
Profitable Website Projects - The Oreo Cookie StrategyProfitable Website Projects - The Oreo Cookie Strategy
Profitable Website Projects - The Oreo Cookie Strategy
 
Design ethics f
Design ethics fDesign ethics f
Design ethics f
 
The Top 5 Mistakes in Blockchain Projects Implementation | Bockchain Adoption...
The Top 5 Mistakes in Blockchain Projects Implementation | Bockchain Adoption...The Top 5 Mistakes in Blockchain Projects Implementation | Bockchain Adoption...
The Top 5 Mistakes in Blockchain Projects Implementation | Bockchain Adoption...
 

Más de Workfront

Más de Workfront (15)

2020 State of Work - Overview & Key Findings
2020 State of Work - Overview & Key Findings2020 State of Work - Overview & Key Findings
2020 State of Work - Overview & Key Findings
 
Create More. Tweak Less. Getting Back To Our Creative Core.
Create More. Tweak Less. Getting Back To Our Creative Core.Create More. Tweak Less. Getting Back To Our Creative Core.
Create More. Tweak Less. Getting Back To Our Creative Core.
 
#AdobeSummit - 3 Ways to Break Through the Silos Killing Your Marketing and C...
#AdobeSummit - 3 Ways to Break Through the Silos Killing Your Marketing and C...#AdobeSummit - 3 Ways to Break Through the Silos Killing Your Marketing and C...
#AdobeSummit - 3 Ways to Break Through the Silos Killing Your Marketing and C...
 
2019 #AdobeSummit Survey
2019 #AdobeSummit Survey 2019 #AdobeSummit Survey
2019 #AdobeSummit Survey
 
How We Work: 14 Stats
How We Work: 14 StatsHow We Work: 14 Stats
How We Work: 14 Stats
 
How Marketers Can Do Great Work: Tips From Ann Handley, Ian Cleary, Lee Odden...
How Marketers Can Do Great Work: Tips From Ann Handley, Ian Cleary, Lee Odden...How Marketers Can Do Great Work: Tips From Ann Handley, Ian Cleary, Lee Odden...
How Marketers Can Do Great Work: Tips From Ann Handley, Ian Cleary, Lee Odden...
 
Office Space Invaders: 5 Species of In-Your-Face, Productivity-Killing Co-Wor...
Office Space Invaders: 5 Species of In-Your-Face, Productivity-Killing Co-Wor...Office Space Invaders: 5 Species of In-Your-Face, Productivity-Killing Co-Wor...
Office Space Invaders: 5 Species of In-Your-Face, Productivity-Killing Co-Wor...
 
How to Write a Business Case: 4 Steps to a Perfect Business Case Template
How to Write a Business Case: 4 Steps to a Perfect Business Case TemplateHow to Write a Business Case: 4 Steps to a Perfect Business Case Template
How to Write a Business Case: 4 Steps to a Perfect Business Case Template
 
4 KPIs Every Creative Team Should Be Tracking
4 KPIs Every Creative Team Should Be Tracking4 KPIs Every Creative Team Should Be Tracking
4 KPIs Every Creative Team Should Be Tracking
 
6 Shocking Findings From Adobe Digital Summit 2017
6 Shocking Findings From Adobe Digital Summit 20176 Shocking Findings From Adobe Digital Summit 2017
6 Shocking Findings From Adobe Digital Summit 2017
 
31 Productivity Tips
31 Productivity Tips31 Productivity Tips
31 Productivity Tips
 
A Quick Guide to Making Change Happen in Your Organization
A Quick Guide to Making Change Happen in Your OrganizationA Quick Guide to Making Change Happen in Your Organization
A Quick Guide to Making Change Happen in Your Organization
 
What's Happening in UK Marketing Departments?
What's Happening in UK Marketing Departments?What's Happening in UK Marketing Departments?
What's Happening in UK Marketing Departments?
 
10 Highlights From the 2016 State of Marketing Work Report
10 Highlights From the 2016 State of Marketing Work Report10 Highlights From the 2016 State of Marketing Work Report
10 Highlights From the 2016 State of Marketing Work Report
 
Lessons Learned From Five of Marketing's Top Minds - starring Robert Rose, An...
Lessons Learned From Five of Marketing's Top Minds - starring Robert Rose, An...Lessons Learned From Five of Marketing's Top Minds - starring Robert Rose, An...
Lessons Learned From Five of Marketing's Top Minds - starring Robert Rose, An...
 

Último

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 

Último (20)

John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 

The 8 Worst Managed Projects of All Time

  • 1. The 8 Worst-Managed Projects of All Time How you can learn from history with better planning, communication, and foresight
  • 2. An Introduction to Failure Most projects start out as great ideas. But, somewhere along the way, mistakes are made, communication breaks down, and, most projects—70% of them— end up late, over budget, and on the way to the project dumpster.
  • 3. An Introduction to Failure The following 8 projects failed epically, but therein are contained lessons any smart work manager can benefit from, like: • The value of getting project goals aligned • The wisdom of controlling requirements and budget • The need to set and adhere to realistic deadlines
  • 4. When growth outpaced communication, the once unbeatable empire broke into two empires: the Greek in the East and the Latin in the West. # 8
  • 5. The Outcome: • Cultures were divided. • Communities threw up silos. • Resources went unused. # 8
  • 6. It could’ve been different if they had: • Focused on increasing the quality and frequency of their communication • Regularly aligned their priorities around shared goals # 8
  • 7. The Takeaway: Misaligned goals leave a project with scattered priorities and complicate communication. To keep your project on track, find a way to facilitate healthy collaboration and agree on a single target – regardless of the distance. # 8
  • 8. The roofless Sinclair C5 was supposed to be a better, more affordable way to commute. Unfortunately, it went into production without considering one immutable fact: its market was in the rain-heavy United Kingdom. # 7
  • 9. The Outcome: • The vehicle couldn’t reverse or steer. • Consumers bought only 17,000 units of the rain- vulnerable design. • Sinclair Vehicles filed for bankruptcy 11 months later. # 7
  • 10. It could’ve been different if they had: • Taken more time to understand customer requirements before starting • Put proper quality assurance checkpoints in place during the project # 7
  • 11. The Takeaway: Successful projects have complete visibility into the quality of their products and the needs of the customer. If the Sinclair team would have spent more time prioritizing these requirements, they might have sold more than a paltry 17,000 units. # 7
  • 12. What would be the world’s largest commercial aircraft, the Airbus A380 required production in facilities across the globe. Unfortunately, these teams were using different CAD programs. # 6
  • 13. The Outcome: • During installation, they discovered the parts designed by different teams didn’t fit together. • As they went back to the drawing board, the project was set back two years and $6.1 billion over budget. # 6
  • 14. It could’ve been different if they had: • Aligned the different teams on one software to ensure design. • Communicated more regularly from team to team, instead of waiting for installation to see if parts would match. # 6
  • 15. The Takeaway: Many successful projects avoid failure in large part by implementing these two key differentiators: a single system of truth and collaboration among teams whether they share the same office or occupy hallways across the globe. # 6
  • 16. Early on, the sort-of SUV crossover drifted down a sad road when the production team failed to inform the designers that the vehicle had to be based on an existing minivan platform. # 5
  • 17. The Outcome: • It was dubbed “one of the ugliest cars ever made.” • The vehicle’s target audience rejected its look, price, and add-ons. • GM sold only 27,322 units, short even of its modest break-even estimates. # 5
  • 18. It could’ve been different if they had: • Taken more time to understand their target audience and their requirements • Increased communication between the production and design teams, which came too little, too late. # 5
  • 19. The Takeaway: Successful projects establish up front who needs to know what and who is responsible for communicating that information. The minivan platform requirement ultimately changed the entire look and destiny of the Pontiac Aztek. # 5
  • 20. The global warming epic’s production was supposed to be 96 days at $100 million. Several script rewrites, one tropical storm, and one AWOL director later, the shoot was way past due and drowning in an overflowing budget. # 4
  • 21. The Outcome: • Shooting started without a complete script, resulting in lots of re- shoots. • The shoot stretched to 150 days and went $135 million over budget. • Bad publicity doomed the intended blockbuster to only modest box office. # 4
  • 22. It could’ve been different if they had: • Secured a finished script prior to the start of filming • Performed meteorological research on the area where they would be filming (the Hawaiian coast) and how weather might affect their filming schedule # 4
  • 23. The Takeaway: Successful projects aren’t anomalies. They, too, deal with shifting priorities and resource swaps. What sets them apart from failed projects is the ability to foresee problems and prevent major disasters. Much of this battle is won in the planning phase. # 4
  • 24. Millions were spent to make sure people knew Windows Vista would be the greatest thing ever. But constant changes delayed its release, and Vista fell short of inflated expectations—slower, less secure, and less popular than its predecessor. # 3
  • 25. The Outcome: • One-third of all new PC owners abandoned Vista in favor of Windows XP. • Delays caused Vista to be released in the slowest selling season of the year. • Existing software on the market wasn’t compatible with Vista. # 3
  • 26. It could’ve been different if they had: • Nailed down a fixed set of strategic objectives, instead of fixating on features • Settled for a manageable set of initial requirements, then planned post-release iterations to add the bells and whistles # 3
  • 27. The Takeaway: Delay after delay created an anticipation to which few products could measure up. In this high- stakes context, project leaders failed to manage expectations, get complete visibility into the real issues, and follow a strict timeline for the product’s release. # 3
  • 28. When Knight Capital was brought on to work on new code for a new SEC program, an aggressive deadline was set. It’s highly likely, experts say, that Knight Capital, short on time, went to production with test code. # 2
  • 29. The Outcome: • A glitch cost the company $440 million in the first 30 minutes of trading—3x their annual earnings. • Company stock fell 75% in just two days. • The company nearly went bankrupt and had to take out a $400-million line of credit. # 2
  • 30. It could’ve been different if they had: • Invested in better resource management to forecast how long the project would feasibly take and avoid setting an arbitrary deadline • Established a more robust quality assurance process # 2
  • 31. The Takeaway: Successful projects utilize the resources they have and outsource work they can’t complete if they’re on a deadline. Successful project managers build in time for proper QA. # 2
  • 32. Malfunctioning rings. Hotels missing floors. The worst case of pink eye ever. Runaway deadlines and nonexistent transparency took the 2014 Olympic Games way over budget and under- whelming in front of a global audience. # 1
  • 33. The Outcome: • Hotels, venues, and the Opening Ceremonies were riddled with embarrassing faux pas. • From an original $12- billion budget, the Sochi Games ballooned to an astonishing $51 billion— 4x the original budget. # 1
  • 34. It could’ve been different if they had: • Based project completion deadlines on historical project data • Made real-time reports on all projects and tasks transparent to all team members and stakeholders • Invested in increased cost management measures # 1
  • 35. The Takeaway: Successful projects account for all things planned and unplanned. Building in buffer time for unanticipated problems and fire-drill requests will keep projects on track, on budget, and on time—a lesson the Sochi Olympic team learned the hard way. # 1
  • 36. A Conclusion to Failure Yes, hindsight is 20/20. However, with rare exception, even the biggest project failures can be avoided by improving requirements-gathering, alignment, and estimates during the planning phase and increasing communication and reporting during production.