SlideShare una empresa de Scribd logo
1 de 67
Descargar para leer sin conexión
Center
University of Missouri – Columbia
University of Missouri – Kansas City
University of Missouri – St. Louis
University of Nebraska at Kearney
University of Nebraska at Lincoln
University of Nebraska Medical Center
University of New Brunswick
University of New Hampshire
University of New Haven
University of North Texas
University of Northern Iowa
University of Notre Dame
University of Oregon
University of Pennsylvania
University of Redlands
University of Rhode Island
University of Rochester
University of San Diego
University of San Francisco
University of Southern Maine
University of Southern Mississippi
University of St. Thomas
University of Tennessee, Knoxville
University of Texas at Dallas
University of the Pacific
University of the Sciences in
Philadelphia
University of Toledo
University of Vermont
Vanderbilt University
Vassar College
Virginia Commonwealth University
Virginia Department of General
Services
Virginia State University
Wagner College
Wake Forest University
Washburn University
Washington University in St. Louis
Wellesley College
Wesleyan University
West Chester University
West Liberty University
West Virginia Institute of Technology
West Virginia School of Osteopathic
Take Control of Your Facilities:
Explore the Tools for Aligning
Space, Capital, and Operations
Sightlines Webinar; Presented by Jon King
October 20, 2015
Introducing Our Presenter
Jon King
Associate Director, Member Services
Sightlines
Today’s Desired Outcome
Introduction: Who is Sightlines?
Why the Roof Hasn’t Caved In
ROPA+ - Changing the Conversation
Five Strategies for Success
3
Feel Free to “Ask Sightlines”
Enter questions in the box at any time
Enter questions
here at any
point during the
webinar
Presentation slides
and webinar
recording will be
sent to each
attendee following
today’s session
Who is Sightlines?
Sightlines is a Facility Asset Advisory Firm
Identify ways to use capital more strategically and identify opportunities to
improve operational effectiveness.
Separate fact from fiction on key issues – operational performance,
annual funding needs, and project backlogs.
Document trends, provide consistent measurement, credible
benchmarking and track progress to goals.
Analytical Rigor, Common Vocabulary, Consistent Methodology, Common Platform
7
Who Partners with Sightlines?
Robust membership includes colleges, universities, consortiums and state systems
Serving the Nation’s Leading Institutions:
• 14 of the Top 20 Colleges*
• 15 of the Top 20 Universities*
• 34 Flagship State Universities
• 12 of the 14 Big 10 Institutions
• 8 of the 12 Ivy Plus Institutions
• 8 of 13 Selective Liberal Arts Colleges
* U.S. News 2015 Rankings
Sightlines is proud to
announce that:
• 450 colleges,
universities and K-12
institutions are
Sightlines clients
including over 325
ROPA members.
• 93% of ROPA
members renewed in
2014
• We have clients in 43
states, the District of
Columbia and Canada
• 100 institutions
became new members
since 2013
Sightlines advises state
systems in:
• Alaska
• California
• Connecticut
• Hawaii
• Maine
• Massachusetts
• Minnesota
• Mississippi
• Missouri
• New Hampshire
• New Jersey
• Oregon
• Pennsylvania
• Texas
• West Virginia
JP2
Slide 7
JP2 Make sure this is the most recent version of slide
Jay Pearlman, 10/7/2015
Why the Roof Hasn’t Caved In
0%
2%
4%
6%
8%
10%
12%
%ofConstructedSpace
Sightlines Database- Construction Age Sightlines Database- Renovation Age
Putting Campus Building Age in ContextPre-War
Built before 1951
Durable construction
Older but typically lasts
longer
Post-War
Built between 1951 and
1975
Lower-quality
construction
Already needing more
repairs and renovations
Modern
Built between 1975 and
1990
Quick-flash construction
Low-quality building
components
Complex
Built in 1991 and newer
Technically complex
spaces
Higher-quality, more
expensive to maintain &
repair
Pre-War Post-War Modern Complex
Percent of Total
Space 40%
Percent of Total
Space 27%
The campus age drives the overall risk profile
Space and Enrollment Growth
Space growing faster than enrollment
0%
2%
4%
6%
8%
10%
12%
2007 2008 2009 2010 2011 2012 2013 2014
Space and Enrollment Growth
National Average
Space Growth Enrollment Growth
Annual Capital Investment
2014 levels finally reach pre-recession, but with a different funding mix
$1.19 $1.18 $1.27 $1.24 $1.36 $1.50 $1.71 $1.77
$3.18
$3.63
$3.86
$3.22
$3.58 $3.44
$3.45
$3.60
$0
$1
$2
$3
$4
$5
$6
2007 2008 2009 2010 2011 2012 2013 2014
$/GSF
Capital Investment into Existing Space
Annual Capital One-Time Capital Average
Annual Capital Investment
Private campuses rely more on annual institutional capital
$0.90 $0.84 $1.03 $0.91 $1.02 $1.10 $1.19 $1.02
$2.57
$3.07
$3.14
$2.84
$3.34 $3.15
$3.31
$3.00
$0
$1
$2
$3
$4
$5
$6
$7
$8
2007 2008 2009 2010 2011 2012 2013 2014
$/GSF
$1.59 $1.68 $1.63 $1.74 $1.89 $2.12
$2.52
$2.82
$4.02
$4.44
$4.97
$3.81
$3.94
$3.91
$3.66
$4.44
2007 2008 2009 2010 2011 2012 2013 2014
Public Average Private Average
Facilities Operating Budget
Daily Service & Planned Maintenance
3.99 4.20 4.20 4.15 4.23 4.23 4.36 4.49
0.28
0.28 0.29 0.29 0.30 0.32 0.34 0.35
-
1.00
2.00
3.00
4.00
5.00
6.00
2007 2008 2009 2010 2011 2012 2013 2014
$/GSF
Facilities Operating Budget
Planned Maintenance Daily Service
Facilities Backlogs Continue to Rise
Backlog $/GSF
Public Average Private Average
0%
5%
10%
15%
20%
25%
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
2007 2008 2009 2010 2011 2012 2013 2014
$/GSF
0%
5%
10%
15%
20%
25%
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
2007 2008 2009 2010 2011 2012 2013 2014
Capital investment not enough to keep backlogs from growing
Summary of Trends
The aging campus is driven by the need to renovate or replace 1960s and 70s
buildings, many of which were poorly constructed
To add to the problem, campuses have added new square footage to address
increasing enrollment that has now leveled off or is even in decline
The demand for both “catch up” on aging buildings and “keep up” of newer buildings
is much higher than the availability of capital funding
Therefore, backlogs continue to grow even though capital funding is finally back to
pre-recession levels
Flat operating budgets have not provided relief to the backlog problem
In the face of these “bad news” trends, why have we not seen more building
failures and major facility problems on campuses?
The Predictions Have Not Become Reality – Why???
Better data to identify and manage the most critical
repair risks for campus.
Systems tend to outperform their statistical target.
Lower cost repairs to systems rather than full system
replacements have bought extra service time.
Because campuses are a collection of buildings –
the risk is diversified over the portfolio.
The functional obsolescence of space drives
investments that brings outside resources, especially
to space.
What are Campuses Doing to Manage Risk?
To keep the roof from caving in and building systems from failing
Better data to identify and manage the most critical
repair risks for campus.
Systems tend to outperform their statistical target.
Lower cost repairs to systems rather than full system
replacements have bought extra service time.
Because campuses are a collection of buildings –
the risk is diversified over the portfolio.
The functional obsolescence of space drives
investments that brings outside resources, especially
to space.
What are Campuses Doing to Manage Risk?
To keep the roof from caving in and building systems from failing
ROPA+ - Changing the
Conversation
Comprehensive Facilities Intelligence Solutions
Changing the Conversation in Higher Education
A Vocabulary for Measurement
The Return on Physical Assets – ROPASM
Asset Value Change
The annual
investment needed
to ensure buildings
will properly
perform and reach
their useful life
“Keep-Up Costs”
Annual
Stewardship
The accumulation
of repair and
modernization
needs and the
definition of
resource capacity
to correct them
“Catch-Up Costs”
Asset
Reinvestment
The effectiveness
of the facilities
operating budget,
staffing,
supervision, and
energy
management
Operational
Effectiveness
The measure of
service process,
the maintenance
quality of space
and systems, and
the customers
opinion of service
delivery
Service
Operations Success
22
Sightlines ROPA+ Service
24
ROPA+ The Process
Disciplined Methodology + Past Performance = Facilities Intelligence
• Sightlines collects and assembles data on campus to
quantify, verify, and qualify facility performance.Measure
• Through the benchmarking process, institutions have
the capability to create custom comparisons that help
them understand context and performance.
Benchmark
• Sightlines synthesizes an institution's verified data to
provide expert insight and perspective and develop
strategic directions for change.
Analyze &
Interpret
• Sightlines continues to support each campus through
our Member Portal, national thought leadership,
educational webinars, and ongoing campus
consultation.
Membership
Sightlines’ Member Portal
It’s time to get more from your data
25
More Support
Informed with live
notification to your data
More Access
Create customized
dashboard featuring
the metrics most
important to you
Seamlessly benchmark
against 300 member
institutions
More Context
My Story feature
presents Sightlines key
findings as an easy to
digest narrative
26
Collected Data Elements
Building Information Building Construction Date
Dates of Major Building Renovations
Building Function (Resident Hall, Academic, Athletic, …)
Building Gross Square Footage, Land Acres
Locations Served by Central Systems – Heating, Cooling, Electrical
Deferred Maintenance Deferred Maintenance Assessment (in-house or contracted)
Building Information Building Construction Date
Dates of Major Building Renovations
Building Function (Resident Hall, Academic, Athletic, …)
Building Gross Square Footage, Land Acres
Locations Served by Central Systems – Heating, Cooling, Electrical
Deferred Maintenance Deferred Maintenance Assessment (in-house or contracted)
CampusProfile
Staffing Table Department Organizational Chart
Distribution of Trades, Cust. and Grounds Staff by Shop Including Super.
Work Order Report Total Number of Requested and Completed
Completed Work Orders by Shop and Type (Repair, PM, Project, etc.)
Energy Profile Monthly Utility Cost and Consumption by Fuel Type (Gas, Oil, Electric)
Primary Generation Equipment Profile Including Hours of Operation
Staffing Table Department Organizational Chart
Distribution of Trades, Cust. and Grounds Staff by Shop Including Super.
Work Order Report Total Number of Requested and Completed
Completed Work Orders by Shop and Type (Repair, PM, Project, etc.)
Energy Profile Monthly Utility Cost and Consumption by Fuel Type (Gas, Oil, Electric)
Primary Generation Equipment Profile Including Hours of Operation
Operations
Institutional Financial Statement Balance Sheet and Operating Budget
Facilities Operating Budget Operating Budget and Actual by department and line item
Capital Budget Recurring & One-Time Capital budget (Plant fund, R&R account)
Institutional Financial Statement Balance Sheet and Operating Budget
Facilities Operating Budget Operating Budget and Actual by department and line item
Capital Budget Recurring & One-Time Capital budget (Plant fund, R&R account)
Finance
More Space & Smaller Buildings = Savings Opportunity
27
$39.4
$14.2
$10.6
$17.3
$8.7
$0.00
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
$35.00
$40.00
$45.00
3% Replacement Value Life Cycle Need Annual Investment Target
$inMillions
FY14 Annual Investment Target
Envelope/Mechanical Space/Program
Defining an Annual Investment Target
28
Functional obsolescence drives
investment prior to life cycles &
discounts the annual target
$0.0
$5.0
$10.0
$15.0
$20.0
$25.0
$30.0
$35.0
2006 2007 2008 2009 2010 2011 2012 2013 2014
Millions
Total Capital Investment vs. Funding Target
Annual Stewardship Asset Reinvestment Annual Investment Target Life Cycle Need
Total Capital Investment vs. Funding Target
Includes only the investment in existing facilities
Increasing Backlog & Risk
29
Increasing Net Asset Value
Lowering Risk Profile
$0
$10
$20
$30
$40
$50
$60
TotalDollars(Millions)
Current Need Renewal Need Modernization & Infrastructure
ROPA+ Prediction: Predictive Investment Model
$65
$172
$155
$0
$50
$100
$150
$200
$250
$300
$350
$400
$450
Asset Reinvestment Need
TotalDollars(Millions)
30
Asset Reinvestment
Need
10 Year Capital Forecast
Facilities Operating Expenditures
31
$-
$1.00
$2.00
$3.00
$4.00
$5.00
Total Daily Service Costs
Maintenance Custodial Grounds
Daily Service Breakout
Area of
Focus
Area of
Focus
Maintenance Staffing Profile vs. Peers
Maintenance Performance
32
More Material SpendingSimilar SupervisionCovering More Space
Demonstration Campus
Energy Consumption vs. Peers
33
• Older facilities & new
technically complex space
is driving up energy
consumption
• Older facilities should be
targeted for renovation to
reduce consumption
• Savings should be
redirected back into annual
stewardship
Peer Averages
• Peers strong investment into
infrastructure & building
systems have helps level off
energy consumption.
Multiple Perspectives on Quality of Service
Service Process, Campus Inspection, and Customer Survey
Service Process
How are requests made?
Who can make requests?
Who schedules the work?
Is there a timeline/completion date given?
Are customers made aware of request
status?
34
Multiple Perspectives on Quality of Service
Service Process, Campus Inspection, and Customer Survey
0 1 2 3 4 5
Performance…
Work Requests
Organization
Scheduling Process
Centralization
Service Process
35
Multiple Perspectives on Quality of Service
Service Process, Campus Inspection, and Customer Survey
0 1 2 3 4 5
Performance…
Work Requests
Organization
Scheduling Process
Centralization
Service Process
Campus Inspection
Sightlines completes a building and
grounds inspection rating the general
repair, cleanliness, exterior condition,
and mechanical systems spaces in a 3
hour tour
36
Multiple Perspectives on Quality of Service
Service Process, Campus Inspection, and Customer Survey
0 1 2 3 4 5
Performance…
Work Requests
Organization
Scheduling Process
Centralization
Service Process
0 1 2 3 4 5
Grounds
Exterior
Mechanical Spaces
General…
Cleanliness
Campus Inspection
37
Multiple Perspectives on Quality of Service
Service Process, Campus Inspection, and Customer Survey
0 1 2 3 4 5
Performance…
Work Requests
Organization
Scheduling Process
Centralization
Service Process
0 1 2 3 4 5
Grounds
Exterior
Mechanical Spaces
General…
Cleanliness
Campus Inspection
Customer Survey
13%
50%
32%
5%
Far Exceeds Expectations
Exceeds Expectations
Meets Expectations
Below Expectations
38
Multiple Perspectives on Quality of Service
Service Process, Campus Inspection, and Customer Survey
0 1 2 3 4 5
Performance…
Work Requests
Organization
Scheduling Process
Centralization
Service Process
0 1 2 3 4 5
Grounds
Exterior
Mechanical Spaces
General…
Cleanliness
Campus Inspection
Customer Survey
13%
50%
32%
5%
Far Exceeds Expectations
Exceeds Expectations
Meets Expectations
Below Expectations
1.00
3.00
5.00
1.00 3.00 5.00
WorkPerformance
Communication & Process
Excellent
Performance
Poor
Performance
Excellent
Performance
Best practice range
Separate report with all the
results & feedback
39
40
ROPA+ = Total Facilities Intelligence Solution
1. Stewardship falls
2. Failures increase
3. Increased operational demands
4. Customer satisfaction
decreases
5. Capital investment driven by
customers. Space wins over
systems.
6. Backlog increases
1. Focused project selection
2. Decreasing operating costs
3. Increasing stewardship
4. Reduce emergency work
5. Increased customer
satisfaction
6. Flexibility of project selection
Five Strategies for Success
Five Strategies for Success
Build
strategically
Less can
be more
Look
ahead
Keep-up
Reward
savings
Less Can Be More
> “No Net New Space” – A policy rooted in
sustainability, it states that no new space on
campus will be built without the removal of an
equal amount of deficient square footage.
> “No Net New Backlog” – A variation of no net
new space that states that no new
construction can occur without the mitigation
of an equal value of backlog.
New Policies to Control Overhead
Tracking Backlog Progress Since 2005
Campuses Taking Action
Our partnership gives them the power to act and drive results
Build Strategically
Sample: Nearly Double Peers’ Users
7,500
More users on campus
versus peer campuses
Liberal Arts Comprehensive University Urban/City School
Community
College
Users/100K GSF
Campus A
Insufficient Classroom Space?
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
%
Room Utilization – General Classrooms
Room Utilization
Difficult Scheduling
During Most of Day
Functional Obsolescence is the Real Issue
Many Small Courses, Few Small Rooms
0% 2%
43%
38%
17%
44%
23%
29%
4% 1%
41%
23%
27%
9%
0%
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
50%
0-25 26-30 31-35 36-40 40+
Distribution of Rooms
Room Capacity Fall '13 Enrollment Spring '14 Enrollment
Build Strategically
Technical
Assessment
Project
Selection
Today: No Integration in the Process
Fails to harness
operating knowledge
Does not tie to
mission, strategy or
master plans
Ignores financial
capacity
Misses opportunities
to optimize capital
resources
Technical
Assessment
Project
Selection
Today: No Integration in the Process
Tie to Operations, Mission & Finance
Technical Assessment: Conduct Building walk-
throughs and component inventory to develop
initial list of needs.
Step 1: Integrate Technical Needs
Integrate operational perspective to target
inspections and reduce overall capital needs
Step 2: Create Building Portfolios
Segment the backlog and tie projects to mission
and institutional strategy
Step 3: Develop Multi-year Capital Plan
Create outcome based strategies by portfolio
Step 4: Project Section
Pick projects that support mission, operations,
and financial capacity
Look Ahead
25%
31%
21%
45%
45%
23%
31%
24%
34%
22%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Construction
Age
Renovation
Age
Peer Renovation
Age
Buildings Under 10
Little work, “honeymoon”
period.
Low Risk
Buildings 10 to 25
Lower cost space renewal
updates and initial signs of
program pressures
Medium Risk
Buildings 25 to 50
Life cycles are coming due in envelope
and mechanical systems. Functional
obsolescence prevalent.
Higher Risk
Buildings over 50
Life cycles of major building components are
past due. Failures are possible. Core
modernization cycles are missed.
Highest risk
Unique Campus Age Profile
Under 10 10 to 25 25 to 50 Over 50
10 Year Capital Renewal Curve
10-Year Needs vs. Investment Capacity
$0
$5
$10
$15
$20
$25
$30
TotalDollars(Millions)
10 Year Total Capital Need by Year
$107
$120
$23
$100
$0
$50
$100
$150
$200
$250
Total 10 Year Need Projected
Investment
Capacity
TotalDollars(Millions)
10 Year Total Capital Need &
Capacity
Keep Up
The Multiplier Effect of Reinvested Savings
* Stewardship is the annual investment into campus facilities
$1 Invested in Stewardship* …$3 in Capital Backlog Need
Equals
…$2.70 in Annual Operating Costs
Equals
$1 Invested in Planned Maintenance
Another investment impact is....
Reward Savings
Low Energy Consumption Keeps Dropping
Increase in PM supports lower energy consumption
Regional Peer Avg.
Regional Peer Avg.
Among the top 10% of lowest
consuming institutions in Sightlines’
database
Increasing Focus on Systems, Envelope, & Infrastructure
11%
10%
20%
35%
24%
Project Spending Mix
Building Systems Envelope Infrastructure Space Renewal Safety/Code
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
FY08 FY09 FY10 FY11 FY12
$/GSF
Project Spending $/GSF
“The State of Facilities in Higher Education”
Sightlines’ annual publication on broad industry trends
JP3
Slide 64
JP3 Update to "Coming Soon - 2015 SoF"
Jay Pearlman, 10/7/2015
Questions & Discussion

Más contenido relacionado

La actualidad más candente

Building the Ship as it Sails: Challenges and Strategies to Assess and Enhanc...
Building the Ship as it Sails: Challenges and Strategies to Assess and Enhanc...Building the Ship as it Sails: Challenges and Strategies to Assess and Enhanc...
Building the Ship as it Sails: Challenges and Strategies to Assess and Enhanc...MEASURE Evaluation
 
Implementing the Researcher Development Framework
Implementing the Researcher Development FrameworkImplementing the Researcher Development Framework
Implementing the Researcher Development FrameworkEmma Gillaspy
 
Asset management presentation at owea collections conference
Asset management presentation at owea collections conferenceAsset management presentation at owea collections conference
Asset management presentation at owea collections conferencestevendsanders
 
Available funding for_research_and_factors_that_make_for_success-dr_faisal_al...
Available funding for_research_and_factors_that_make_for_success-dr_faisal_al...Available funding for_research_and_factors_that_make_for_success-dr_faisal_al...
Available funding for_research_and_factors_that_make_for_success-dr_faisal_al...Mosab-Khayat
 
University Futures, Library Futures: aligning aligning academic library servi...
University Futures, Library Futures: aligning aligning academic library servi...University Futures, Library Futures: aligning aligning academic library servi...
University Futures, Library Futures: aligning aligning academic library servi...Constance Malpas
 
An Integrative Study of Measles Outbreaks in the City of Cape Town, South Afr...
An Integrative Study of Measles Outbreaks in the City of Cape Town, South Afr...An Integrative Study of Measles Outbreaks in the City of Cape Town, South Afr...
An Integrative Study of Measles Outbreaks in the City of Cape Town, South Afr...Global Risk Forum GRFDavos
 

La actualidad más candente (9)

Fostering Human Capital in Agricultural R&D: Challenges and Opportunities for...
Fostering Human Capital in Agricultural R&D: Challenges and Opportunities for...Fostering Human Capital in Agricultural R&D: Challenges and Opportunities for...
Fostering Human Capital in Agricultural R&D: Challenges and Opportunities for...
 
Iled process 20160330
Iled process 20160330Iled process 20160330
Iled process 20160330
 
Building the Ship as it Sails: Challenges and Strategies to Assess and Enhanc...
Building the Ship as it Sails: Challenges and Strategies to Assess and Enhanc...Building the Ship as it Sails: Challenges and Strategies to Assess and Enhanc...
Building the Ship as it Sails: Challenges and Strategies to Assess and Enhanc...
 
Implementing the Researcher Development Framework
Implementing the Researcher Development FrameworkImplementing the Researcher Development Framework
Implementing the Researcher Development Framework
 
Asset management presentation at owea collections conference
Asset management presentation at owea collections conferenceAsset management presentation at owea collections conference
Asset management presentation at owea collections conference
 
Creating Successful Research Projects: Navigating the Process (New Faculty Or...
Creating Successful Research Projects: Navigating the Process (New Faculty Or...Creating Successful Research Projects: Navigating the Process (New Faculty Or...
Creating Successful Research Projects: Navigating the Process (New Faculty Or...
 
Available funding for_research_and_factors_that_make_for_success-dr_faisal_al...
Available funding for_research_and_factors_that_make_for_success-dr_faisal_al...Available funding for_research_and_factors_that_make_for_success-dr_faisal_al...
Available funding for_research_and_factors_that_make_for_success-dr_faisal_al...
 
University Futures, Library Futures: aligning aligning academic library servi...
University Futures, Library Futures: aligning aligning academic library servi...University Futures, Library Futures: aligning aligning academic library servi...
University Futures, Library Futures: aligning aligning academic library servi...
 
An Integrative Study of Measles Outbreaks in the City of Cape Town, South Afr...
An Integrative Study of Measles Outbreaks in the City of Cape Town, South Afr...An Integrative Study of Measles Outbreaks in the City of Cape Town, South Afr...
An Integrative Study of Measles Outbreaks in the City of Cape Town, South Afr...
 

Destacado

Enhancing the Value of Streets for Pedestrians, Bicyclists, and Motorists
Enhancing the Value of Streets for Pedestrians, Bicyclists, and MotoristsEnhancing the Value of Streets for Pedestrians, Bicyclists, and Motorists
Enhancing the Value of Streets for Pedestrians, Bicyclists, and MotoristsAndy Boenau
 
Selenium: What Is It Good For
Selenium: What Is It Good ForSelenium: What Is It Good For
Selenium: What Is It Good ForAllan Chappell
 
Pg connects bangalore re engagment advertising a dummies guide
Pg connects bangalore re engagment advertising a dummies guidePg connects bangalore re engagment advertising a dummies guide
Pg connects bangalore re engagment advertising a dummies guideFiksu
 
Backlog, Deferred Maintenance and its use in Planning
Backlog, Deferred Maintenance and its use in PlanningBacklog, Deferred Maintenance and its use in Planning
Backlog, Deferred Maintenance and its use in PlanningSightlines
 
Kakamega County Audit Report 2014/2015
Kakamega County Audit Report 2014/2015Kakamega County Audit Report 2014/2015
Kakamega County Audit Report 2014/2015The Star Newspaper
 
Make your pitch perfect, using competitive and emotional intelligence - SEOZONE
Make your pitch perfect, using competitive and emotional intelligence - SEOZONEMake your pitch perfect, using competitive and emotional intelligence - SEOZONE
Make your pitch perfect, using competitive and emotional intelligence - SEOZONEAlexandraTachalova
 
JAWS FESTA TOKAIDO 2016
JAWS FESTA TOKAIDO 2016JAWS FESTA TOKAIDO 2016
JAWS FESTA TOKAIDO 2016陽平 山口
 
Lire Rythme, une nouvelle de Chaplin
Lire Rythme, une nouvelle de ChaplinLire Rythme, une nouvelle de Chaplin
Lire Rythme, une nouvelle de ChaplinLaila Methnani
 
Spartan challenge 10 11
Spartan challenge 10 11Spartan challenge 10 11
Spartan challenge 10 11Robjenna
 
Create content according to buyer's journey
Create content according to buyer's journeyCreate content according to buyer's journey
Create content according to buyer's journeyPengyuan Zhao
 
交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業
交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業 交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業
交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業 交點
 
14 Machine Learning Single Layer Perceptron
14 Machine Learning Single Layer Perceptron14 Machine Learning Single Layer Perceptron
14 Machine Learning Single Layer PerceptronAndres Mendez-Vazquez
 
Connected health
Connected healthConnected health
Connected healthDeloitte UK
 
TOP Growth Hacking acquisition Tools for 2017 - BY Akshay Gaur
TOP Growth Hacking acquisition Tools for 2017 - BY Akshay GaurTOP Growth Hacking acquisition Tools for 2017 - BY Akshay Gaur
TOP Growth Hacking acquisition Tools for 2017 - BY Akshay GaurAkshay Gaur
 

Destacado (17)

Enhancing the Value of Streets for Pedestrians, Bicyclists, and Motorists
Enhancing the Value of Streets for Pedestrians, Bicyclists, and MotoristsEnhancing the Value of Streets for Pedestrians, Bicyclists, and Motorists
Enhancing the Value of Streets for Pedestrians, Bicyclists, and Motorists
 
Selenium: What Is It Good For
Selenium: What Is It Good ForSelenium: What Is It Good For
Selenium: What Is It Good For
 
More than a score - Using Ratings and Reviews in Real Estate
More than a score - Using Ratings and Reviews in Real EstateMore than a score - Using Ratings and Reviews in Real Estate
More than a score - Using Ratings and Reviews in Real Estate
 
Pg connects bangalore re engagment advertising a dummies guide
Pg connects bangalore re engagment advertising a dummies guidePg connects bangalore re engagment advertising a dummies guide
Pg connects bangalore re engagment advertising a dummies guide
 
Backlog, Deferred Maintenance and its use in Planning
Backlog, Deferred Maintenance and its use in PlanningBacklog, Deferred Maintenance and its use in Planning
Backlog, Deferred Maintenance and its use in Planning
 
Kakamega County Audit Report 2014/2015
Kakamega County Audit Report 2014/2015Kakamega County Audit Report 2014/2015
Kakamega County Audit Report 2014/2015
 
Make your pitch perfect, using competitive and emotional intelligence - SEOZONE
Make your pitch perfect, using competitive and emotional intelligence - SEOZONEMake your pitch perfect, using competitive and emotional intelligence - SEOZONE
Make your pitch perfect, using competitive and emotional intelligence - SEOZONE
 
Canvas
CanvasCanvas
Canvas
 
JAWS FESTA TOKAIDO 2016
JAWS FESTA TOKAIDO 2016JAWS FESTA TOKAIDO 2016
JAWS FESTA TOKAIDO 2016
 
Lire Rythme, une nouvelle de Chaplin
Lire Rythme, une nouvelle de ChaplinLire Rythme, une nouvelle de Chaplin
Lire Rythme, une nouvelle de Chaplin
 
Spartan challenge 10 11
Spartan challenge 10 11Spartan challenge 10 11
Spartan challenge 10 11
 
Create content according to buyer's journey
Create content according to buyer's journeyCreate content according to buyer's journey
Create content according to buyer's journey
 
交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業
交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業 交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業
交點台中2016.3月 - 簡正強 - 青銀世代,翻轉農業
 
14 Machine Learning Single Layer Perceptron
14 Machine Learning Single Layer Perceptron14 Machine Learning Single Layer Perceptron
14 Machine Learning Single Layer Perceptron
 
My favourite game
My favourite gameMy favourite game
My favourite game
 
Connected health
Connected healthConnected health
Connected health
 
TOP Growth Hacking acquisition Tools for 2017 - BY Akshay Gaur
TOP Growth Hacking acquisition Tools for 2017 - BY Akshay GaurTOP Growth Hacking acquisition Tools for 2017 - BY Akshay Gaur
TOP Growth Hacking acquisition Tools for 2017 - BY Akshay Gaur
 

Similar a Take Control of Your Facilities: Explore the Tools for Aligning Space, Capital, and Operations

Changing the Conversation: Making the Case for Funding Deferred Maintenance [...
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...Changing the Conversation: Making the Case for Funding Deferred Maintenance [...
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...Sightlines
 
Focusing a Campus Investment Strategy - NCAPPA 2016
Focusing a Campus Investment Strategy - NCAPPA 2016Focusing a Campus Investment Strategy - NCAPPA 2016
Focusing a Campus Investment Strategy - NCAPPA 2016Sightlines
 
The State of Facilities at cIcu Institutions
The State of Facilities at cIcu InstitutionsThe State of Facilities at cIcu Institutions
The State of Facilities at cIcu InstitutionsSightlines
 
The State of Facilities in Higher Education: An In-Depth Look at the 2015 Tre...
The State of Facilities in Higher Education: An In-Depth Look at the 2015 Tre...The State of Facilities in Higher Education: An In-Depth Look at the 2015 Tre...
The State of Facilities in Higher Education: An In-Depth Look at the 2015 Tre...Sightlines
 
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...Sightlines
 
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...Sightlines
 
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...Sightlines
 
Changing the Conversation in Facilities Management - A Step Towards Total Cam...
Changing the Conversation in Facilities Management - A Step Towards Total Cam...Changing the Conversation in Facilities Management - A Step Towards Total Cam...
Changing the Conversation in Facilities Management - A Step Towards Total Cam...Sightlines
 
Take Control of Your Facilities: Explore the Tools for Creating a New Convers...
Take Control of Your Facilities: Explore the Tools for Creating a New Convers...Take Control of Your Facilities: Explore the Tools for Creating a New Convers...
Take Control of Your Facilities: Explore the Tools for Creating a New Convers...Sightlines
 
Change the Conversation to Address Deferred Maintenance - NACUBO 2015
Change the Conversation to Address Deferred Maintenance - NACUBO 2015Change the Conversation to Address Deferred Maintenance - NACUBO 2015
Change the Conversation to Address Deferred Maintenance - NACUBO 2015Sightlines
 
Go "Beyond Benchmarking" with Sightlines' ROPA+ Services
Go "Beyond Benchmarking" with Sightlines' ROPA+ ServicesGo "Beyond Benchmarking" with Sightlines' ROPA+ Services
Go "Beyond Benchmarking" with Sightlines' ROPA+ ServicesSightlines
 
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]Sightlines
 
How Sightlines Can Change the Conversation on Your Campus
How Sightlines Can Change the Conversation on Your CampusHow Sightlines Can Change the Conversation on Your Campus
How Sightlines Can Change the Conversation on Your CampusSightlines
 
Doing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited BudgetDoing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited BudgetSightlines
 
2016 State of Facilities in Higher Education
2016 State of Facilities in Higher Education2016 State of Facilities in Higher Education
2016 State of Facilities in Higher EducationSightlines
 
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on CampusPut Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on CampusSightlines
 
Challenges to the Physical Campus: How to Change the Conversation about Facil...
Challenges to the Physical Campus: How to Change the Conversation about Facil...Challenges to the Physical Campus: How to Change the Conversation about Facil...
Challenges to the Physical Campus: How to Change the Conversation about Facil...Sightlines
 
Transformation: Phase 2 Presentation 5/25/2016
Transformation: Phase 2 Presentation 5/25/2016Transformation: Phase 2 Presentation 5/25/2016
Transformation: Phase 2 Presentation 5/25/2016Houston Community College
 
Unleash the Power of Prediction with ROPA+
Unleash the Power of Prediction with ROPA+Unleash the Power of Prediction with ROPA+
Unleash the Power of Prediction with ROPA+Sightlines
 
EDUCA Leveraging Analytics FINAL
EDUCA Leveraging Analytics FINALEDUCA Leveraging Analytics FINAL
EDUCA Leveraging Analytics FINALEllen Wagner
 

Similar a Take Control of Your Facilities: Explore the Tools for Aligning Space, Capital, and Operations (20)

Changing the Conversation: Making the Case for Funding Deferred Maintenance [...
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...Changing the Conversation: Making the Case for Funding Deferred Maintenance [...
Changing the Conversation: Making the Case for Funding Deferred Maintenance [...
 
Focusing a Campus Investment Strategy - NCAPPA 2016
Focusing a Campus Investment Strategy - NCAPPA 2016Focusing a Campus Investment Strategy - NCAPPA 2016
Focusing a Campus Investment Strategy - NCAPPA 2016
 
The State of Facilities at cIcu Institutions
The State of Facilities at cIcu InstitutionsThe State of Facilities at cIcu Institutions
The State of Facilities at cIcu Institutions
 
The State of Facilities in Higher Education: An In-Depth Look at the 2015 Tre...
The State of Facilities in Higher Education: An In-Depth Look at the 2015 Tre...The State of Facilities in Higher Education: An In-Depth Look at the 2015 Tre...
The State of Facilities in Higher Education: An In-Depth Look at the 2015 Tre...
 
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...
7 Essential Questions Highly Effective Facilities Leaders Must Answer_SRAPPA ...
 
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
The State of Facilities: Preventing Your Biggest Asset from Becoming Your Big...
 
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
Is Your Facilities Data Fact, Fiction, or Crap? - Creating Facilities Intelli...
 
Changing the Conversation in Facilities Management - A Step Towards Total Cam...
Changing the Conversation in Facilities Management - A Step Towards Total Cam...Changing the Conversation in Facilities Management - A Step Towards Total Cam...
Changing the Conversation in Facilities Management - A Step Towards Total Cam...
 
Take Control of Your Facilities: Explore the Tools for Creating a New Convers...
Take Control of Your Facilities: Explore the Tools for Creating a New Convers...Take Control of Your Facilities: Explore the Tools for Creating a New Convers...
Take Control of Your Facilities: Explore the Tools for Creating a New Convers...
 
Change the Conversation to Address Deferred Maintenance - NACUBO 2015
Change the Conversation to Address Deferred Maintenance - NACUBO 2015Change the Conversation to Address Deferred Maintenance - NACUBO 2015
Change the Conversation to Address Deferred Maintenance - NACUBO 2015
 
Go "Beyond Benchmarking" with Sightlines' ROPA+ Services
Go "Beyond Benchmarking" with Sightlines' ROPA+ ServicesGo "Beyond Benchmarking" with Sightlines' ROPA+ Services
Go "Beyond Benchmarking" with Sightlines' ROPA+ Services
 
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
More with Less: Five Strategies for Facilities Success [MAPPA-CAPPA 2017]
 
How Sightlines Can Change the Conversation on Your Campus
How Sightlines Can Change the Conversation on Your CampusHow Sightlines Can Change the Conversation on Your Campus
How Sightlines Can Change the Conversation on Your Campus
 
Doing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited BudgetDoing More with Less: Solutions for Managing Facilities on a Limited Budget
Doing More with Less: Solutions for Managing Facilities on a Limited Budget
 
2016 State of Facilities in Higher Education
2016 State of Facilities in Higher Education2016 State of Facilities in Higher Education
2016 State of Facilities in Higher Education
 
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on CampusPut Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
Put Your Facilities Data to Work: 5 Steps for Strengthening Your Case on Campus
 
Challenges to the Physical Campus: How to Change the Conversation about Facil...
Challenges to the Physical Campus: How to Change the Conversation about Facil...Challenges to the Physical Campus: How to Change the Conversation about Facil...
Challenges to the Physical Campus: How to Change the Conversation about Facil...
 
Transformation: Phase 2 Presentation 5/25/2016
Transformation: Phase 2 Presentation 5/25/2016Transformation: Phase 2 Presentation 5/25/2016
Transformation: Phase 2 Presentation 5/25/2016
 
Unleash the Power of Prediction with ROPA+
Unleash the Power of Prediction with ROPA+Unleash the Power of Prediction with ROPA+
Unleash the Power of Prediction with ROPA+
 
EDUCA Leveraging Analytics FINAL
EDUCA Leveraging Analytics FINALEDUCA Leveraging Analytics FINAL
EDUCA Leveraging Analytics FINAL
 

Más de Sightlines

State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017Sightlines
 
2017 State of Facilities in Higher Education
2017 State of Facilities in Higher Education2017 State of Facilities in Higher Education
2017 State of Facilities in Higher EducationSightlines
 
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]Sightlines
 
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]Sightlines
 
Making the Case for Campus Sustainability
Making the Case for Campus SustainabilityMaking the Case for Campus Sustainability
Making the Case for Campus SustainabilitySightlines
 
Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016Sightlines
 
How UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlogHow UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlogSightlines
 
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...Sightlines
 
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...Sightlines
 
Prepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th CommencementPrepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th CommencementSightlines
 
Sightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with GordianSightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with GordianSightlines
 
Data & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates SuccessData & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates SuccessSightlines
 
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...Sightlines
 
Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016Sightlines
 
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master PlanDon't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master PlanSightlines
 
The State of Facilities at Pacific Coast Institutions May2016
The State of Facilities at Pacific Coast Institutions May2016The State of Facilities at Pacific Coast Institutions May2016
The State of Facilities at Pacific Coast Institutions May2016Sightlines
 
Leveraging New Analytics to Change the Conversation around Facilities on Campus
Leveraging New Analytics to Change the Conversation around Facilities on Campus Leveraging New Analytics to Change the Conversation around Facilities on Campus
Leveraging New Analytics to Change the Conversation around Facilities on Campus Sightlines
 
Plan More, React Less: Building & Expanding Your Planned Maintenance Program
Plan More, React Less: Building & Expanding Your Planned Maintenance ProgramPlan More, React Less: Building & Expanding Your Planned Maintenance Program
Plan More, React Less: Building & Expanding Your Planned Maintenance ProgramSightlines
 
Out with the Old - Creating a New Paradigm Around the Fate of Your Buildings
Out with the Old - Creating a New Paradigm Around the Fate of Your BuildingsOut with the Old - Creating a New Paradigm Around the Fate of Your Buildings
Out with the Old - Creating a New Paradigm Around the Fate of Your BuildingsSightlines
 
Using Metrics for Facilities Resource Advocacy at the University of North Tex...
Using Metrics for Facilities Resource Advocacy at the University of North Tex...Using Metrics for Facilities Resource Advocacy at the University of North Tex...
Using Metrics for Facilities Resource Advocacy at the University of North Tex...Sightlines
 

Más de Sightlines (20)

State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017State of Sustainability in Higher Education 2017
State of Sustainability in Higher Education 2017
 
2017 State of Facilities in Higher Education
2017 State of Facilities in Higher Education2017 State of Facilities in Higher Education
2017 State of Facilities in Higher Education
 
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
Developing the Capital Plan is Only Half the Battle [ERAPPA 2017]
 
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
The State of Housing Facilities: Trends & Best Practices [ACUHO-i/APPA 2017]
 
Making the Case for Campus Sustainability
Making the Case for Campus SustainabilityMaking the Case for Campus Sustainability
Making the Case for Campus Sustainability
 
Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016Exploring the State of Sustainability in Higher Education 2016
Exploring the State of Sustainability in Higher Education 2016
 
How UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlogHow UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlog
 
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
When You Come to a Fork in the Road, Take It: Rutgers & Sightlines ERAPPA 201...
 
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
From Boiler Room to Board Room: Creating Alignment with Non-Facilities Profes...
 
Prepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th CommencementPrepping for the President: Planning Rutgers' 250th Commencement
Prepping for the President: Planning Rutgers' 250th Commencement
 
Sightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with GordianSightlines Membership Update - The Value of Integration with Gordian
Sightlines Membership Update - The Value of Integration with Gordian
 
Data & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates SuccessData & Sustainability: How the Right Data Creates Success
Data & Sustainability: How the Right Data Creates Success
 
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
Taming Deferred Maintenance Before the Roof Caves In (2016 Sightlines NACUBO ...
 
Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016Creating Alignment with Non-Facilities Professionals - APPA 2016
Creating Alignment with Non-Facilities Professionals - APPA 2016
 
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master PlanDon't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
Don't Leave Your Facilities Needs to Chance: From Game Plan to Master Plan
 
The State of Facilities at Pacific Coast Institutions May2016
The State of Facilities at Pacific Coast Institutions May2016The State of Facilities at Pacific Coast Institutions May2016
The State of Facilities at Pacific Coast Institutions May2016
 
Leveraging New Analytics to Change the Conversation around Facilities on Campus
Leveraging New Analytics to Change the Conversation around Facilities on Campus Leveraging New Analytics to Change the Conversation around Facilities on Campus
Leveraging New Analytics to Change the Conversation around Facilities on Campus
 
Plan More, React Less: Building & Expanding Your Planned Maintenance Program
Plan More, React Less: Building & Expanding Your Planned Maintenance ProgramPlan More, React Less: Building & Expanding Your Planned Maintenance Program
Plan More, React Less: Building & Expanding Your Planned Maintenance Program
 
Out with the Old - Creating a New Paradigm Around the Fate of Your Buildings
Out with the Old - Creating a New Paradigm Around the Fate of Your BuildingsOut with the Old - Creating a New Paradigm Around the Fate of Your Buildings
Out with the Old - Creating a New Paradigm Around the Fate of Your Buildings
 
Using Metrics for Facilities Resource Advocacy at the University of North Tex...
Using Metrics for Facilities Resource Advocacy at the University of North Tex...Using Metrics for Facilities Resource Advocacy at the University of North Tex...
Using Metrics for Facilities Resource Advocacy at the University of North Tex...
 

Último

How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 

Último (20)

LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 

Take Control of Your Facilities: Explore the Tools for Aligning Space, Capital, and Operations

  • 1. Center University of Missouri – Columbia University of Missouri – Kansas City University of Missouri – St. Louis University of Nebraska at Kearney University of Nebraska at Lincoln University of Nebraska Medical Center University of New Brunswick University of New Hampshire University of New Haven University of North Texas University of Northern Iowa University of Notre Dame University of Oregon University of Pennsylvania University of Redlands University of Rhode Island University of Rochester University of San Diego University of San Francisco University of Southern Maine University of Southern Mississippi University of St. Thomas University of Tennessee, Knoxville University of Texas at Dallas University of the Pacific University of the Sciences in Philadelphia University of Toledo University of Vermont Vanderbilt University Vassar College Virginia Commonwealth University Virginia Department of General Services Virginia State University Wagner College Wake Forest University Washburn University Washington University in St. Louis Wellesley College Wesleyan University West Chester University West Liberty University West Virginia Institute of Technology West Virginia School of Osteopathic Take Control of Your Facilities: Explore the Tools for Aligning Space, Capital, and Operations Sightlines Webinar; Presented by Jon King October 20, 2015
  • 2. Introducing Our Presenter Jon King Associate Director, Member Services Sightlines
  • 3. Today’s Desired Outcome Introduction: Who is Sightlines? Why the Roof Hasn’t Caved In ROPA+ - Changing the Conversation Five Strategies for Success 3
  • 4. Feel Free to “Ask Sightlines” Enter questions in the box at any time Enter questions here at any point during the webinar Presentation slides and webinar recording will be sent to each attendee following today’s session
  • 6. Sightlines is a Facility Asset Advisory Firm Identify ways to use capital more strategically and identify opportunities to improve operational effectiveness. Separate fact from fiction on key issues – operational performance, annual funding needs, and project backlogs. Document trends, provide consistent measurement, credible benchmarking and track progress to goals. Analytical Rigor, Common Vocabulary, Consistent Methodology, Common Platform
  • 7. 7 Who Partners with Sightlines? Robust membership includes colleges, universities, consortiums and state systems Serving the Nation’s Leading Institutions: • 14 of the Top 20 Colleges* • 15 of the Top 20 Universities* • 34 Flagship State Universities • 12 of the 14 Big 10 Institutions • 8 of the 12 Ivy Plus Institutions • 8 of 13 Selective Liberal Arts Colleges * U.S. News 2015 Rankings Sightlines is proud to announce that: • 450 colleges, universities and K-12 institutions are Sightlines clients including over 325 ROPA members. • 93% of ROPA members renewed in 2014 • We have clients in 43 states, the District of Columbia and Canada • 100 institutions became new members since 2013 Sightlines advises state systems in: • Alaska • California • Connecticut • Hawaii • Maine • Massachusetts • Minnesota • Mississippi • Missouri • New Hampshire • New Jersey • Oregon • Pennsylvania • Texas • West Virginia JP2
  • 8. Slide 7 JP2 Make sure this is the most recent version of slide Jay Pearlman, 10/7/2015
  • 9. Why the Roof Hasn’t Caved In
  • 10. 0% 2% 4% 6% 8% 10% 12% %ofConstructedSpace Sightlines Database- Construction Age Sightlines Database- Renovation Age Putting Campus Building Age in ContextPre-War Built before 1951 Durable construction Older but typically lasts longer Post-War Built between 1951 and 1975 Lower-quality construction Already needing more repairs and renovations Modern Built between 1975 and 1990 Quick-flash construction Low-quality building components Complex Built in 1991 and newer Technically complex spaces Higher-quality, more expensive to maintain & repair Pre-War Post-War Modern Complex Percent of Total Space 40% Percent of Total Space 27% The campus age drives the overall risk profile
  • 11. Space and Enrollment Growth Space growing faster than enrollment 0% 2% 4% 6% 8% 10% 12% 2007 2008 2009 2010 2011 2012 2013 2014 Space and Enrollment Growth National Average Space Growth Enrollment Growth
  • 12. Annual Capital Investment 2014 levels finally reach pre-recession, but with a different funding mix $1.19 $1.18 $1.27 $1.24 $1.36 $1.50 $1.71 $1.77 $3.18 $3.63 $3.86 $3.22 $3.58 $3.44 $3.45 $3.60 $0 $1 $2 $3 $4 $5 $6 2007 2008 2009 2010 2011 2012 2013 2014 $/GSF Capital Investment into Existing Space Annual Capital One-Time Capital Average
  • 13. Annual Capital Investment Private campuses rely more on annual institutional capital $0.90 $0.84 $1.03 $0.91 $1.02 $1.10 $1.19 $1.02 $2.57 $3.07 $3.14 $2.84 $3.34 $3.15 $3.31 $3.00 $0 $1 $2 $3 $4 $5 $6 $7 $8 2007 2008 2009 2010 2011 2012 2013 2014 $/GSF $1.59 $1.68 $1.63 $1.74 $1.89 $2.12 $2.52 $2.82 $4.02 $4.44 $4.97 $3.81 $3.94 $3.91 $3.66 $4.44 2007 2008 2009 2010 2011 2012 2013 2014 Public Average Private Average
  • 14. Facilities Operating Budget Daily Service & Planned Maintenance 3.99 4.20 4.20 4.15 4.23 4.23 4.36 4.49 0.28 0.28 0.29 0.29 0.30 0.32 0.34 0.35 - 1.00 2.00 3.00 4.00 5.00 6.00 2007 2008 2009 2010 2011 2012 2013 2014 $/GSF Facilities Operating Budget Planned Maintenance Daily Service
  • 15. Facilities Backlogs Continue to Rise Backlog $/GSF Public Average Private Average 0% 5% 10% 15% 20% 25% 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 2007 2008 2009 2010 2011 2012 2013 2014 $/GSF 0% 5% 10% 15% 20% 25% 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00 2007 2008 2009 2010 2011 2012 2013 2014 Capital investment not enough to keep backlogs from growing
  • 16. Summary of Trends The aging campus is driven by the need to renovate or replace 1960s and 70s buildings, many of which were poorly constructed To add to the problem, campuses have added new square footage to address increasing enrollment that has now leveled off or is even in decline The demand for both “catch up” on aging buildings and “keep up” of newer buildings is much higher than the availability of capital funding Therefore, backlogs continue to grow even though capital funding is finally back to pre-recession levels Flat operating budgets have not provided relief to the backlog problem In the face of these “bad news” trends, why have we not seen more building failures and major facility problems on campuses?
  • 17. The Predictions Have Not Become Reality – Why???
  • 18. Better data to identify and manage the most critical repair risks for campus. Systems tend to outperform their statistical target. Lower cost repairs to systems rather than full system replacements have bought extra service time. Because campuses are a collection of buildings – the risk is diversified over the portfolio. The functional obsolescence of space drives investments that brings outside resources, especially to space. What are Campuses Doing to Manage Risk? To keep the roof from caving in and building systems from failing
  • 19. Better data to identify and manage the most critical repair risks for campus. Systems tend to outperform their statistical target. Lower cost repairs to systems rather than full system replacements have bought extra service time. Because campuses are a collection of buildings – the risk is diversified over the portfolio. The functional obsolescence of space drives investments that brings outside resources, especially to space. What are Campuses Doing to Manage Risk? To keep the roof from caving in and building systems from failing
  • 20. ROPA+ - Changing the Conversation
  • 22. Changing the Conversation in Higher Education
  • 23. A Vocabulary for Measurement The Return on Physical Assets – ROPASM Asset Value Change The annual investment needed to ensure buildings will properly perform and reach their useful life “Keep-Up Costs” Annual Stewardship The accumulation of repair and modernization needs and the definition of resource capacity to correct them “Catch-Up Costs” Asset Reinvestment The effectiveness of the facilities operating budget, staffing, supervision, and energy management Operational Effectiveness The measure of service process, the maintenance quality of space and systems, and the customers opinion of service delivery Service Operations Success 22
  • 25. 24 ROPA+ The Process Disciplined Methodology + Past Performance = Facilities Intelligence • Sightlines collects and assembles data on campus to quantify, verify, and qualify facility performance.Measure • Through the benchmarking process, institutions have the capability to create custom comparisons that help them understand context and performance. Benchmark • Sightlines synthesizes an institution's verified data to provide expert insight and perspective and develop strategic directions for change. Analyze & Interpret • Sightlines continues to support each campus through our Member Portal, national thought leadership, educational webinars, and ongoing campus consultation. Membership
  • 26. Sightlines’ Member Portal It’s time to get more from your data 25 More Support Informed with live notification to your data More Access Create customized dashboard featuring the metrics most important to you Seamlessly benchmark against 300 member institutions More Context My Story feature presents Sightlines key findings as an easy to digest narrative
  • 27. 26 Collected Data Elements Building Information Building Construction Date Dates of Major Building Renovations Building Function (Resident Hall, Academic, Athletic, …) Building Gross Square Footage, Land Acres Locations Served by Central Systems – Heating, Cooling, Electrical Deferred Maintenance Deferred Maintenance Assessment (in-house or contracted) Building Information Building Construction Date Dates of Major Building Renovations Building Function (Resident Hall, Academic, Athletic, …) Building Gross Square Footage, Land Acres Locations Served by Central Systems – Heating, Cooling, Electrical Deferred Maintenance Deferred Maintenance Assessment (in-house or contracted) CampusProfile Staffing Table Department Organizational Chart Distribution of Trades, Cust. and Grounds Staff by Shop Including Super. Work Order Report Total Number of Requested and Completed Completed Work Orders by Shop and Type (Repair, PM, Project, etc.) Energy Profile Monthly Utility Cost and Consumption by Fuel Type (Gas, Oil, Electric) Primary Generation Equipment Profile Including Hours of Operation Staffing Table Department Organizational Chart Distribution of Trades, Cust. and Grounds Staff by Shop Including Super. Work Order Report Total Number of Requested and Completed Completed Work Orders by Shop and Type (Repair, PM, Project, etc.) Energy Profile Monthly Utility Cost and Consumption by Fuel Type (Gas, Oil, Electric) Primary Generation Equipment Profile Including Hours of Operation Operations Institutional Financial Statement Balance Sheet and Operating Budget Facilities Operating Budget Operating Budget and Actual by department and line item Capital Budget Recurring & One-Time Capital budget (Plant fund, R&R account) Institutional Financial Statement Balance Sheet and Operating Budget Facilities Operating Budget Operating Budget and Actual by department and line item Capital Budget Recurring & One-Time Capital budget (Plant fund, R&R account) Finance
  • 28. More Space & Smaller Buildings = Savings Opportunity 27
  • 29. $39.4 $14.2 $10.6 $17.3 $8.7 $0.00 $5.00 $10.00 $15.00 $20.00 $25.00 $30.00 $35.00 $40.00 $45.00 3% Replacement Value Life Cycle Need Annual Investment Target $inMillions FY14 Annual Investment Target Envelope/Mechanical Space/Program Defining an Annual Investment Target 28 Functional obsolescence drives investment prior to life cycles & discounts the annual target
  • 30. $0.0 $5.0 $10.0 $15.0 $20.0 $25.0 $30.0 $35.0 2006 2007 2008 2009 2010 2011 2012 2013 2014 Millions Total Capital Investment vs. Funding Target Annual Stewardship Asset Reinvestment Annual Investment Target Life Cycle Need Total Capital Investment vs. Funding Target Includes only the investment in existing facilities Increasing Backlog & Risk 29 Increasing Net Asset Value Lowering Risk Profile
  • 31. $0 $10 $20 $30 $40 $50 $60 TotalDollars(Millions) Current Need Renewal Need Modernization & Infrastructure ROPA+ Prediction: Predictive Investment Model $65 $172 $155 $0 $50 $100 $150 $200 $250 $300 $350 $400 $450 Asset Reinvestment Need TotalDollars(Millions) 30 Asset Reinvestment Need 10 Year Capital Forecast
  • 32. Facilities Operating Expenditures 31 $- $1.00 $2.00 $3.00 $4.00 $5.00 Total Daily Service Costs Maintenance Custodial Grounds Daily Service Breakout Area of Focus Area of Focus
  • 33. Maintenance Staffing Profile vs. Peers Maintenance Performance 32 More Material SpendingSimilar SupervisionCovering More Space
  • 34. Demonstration Campus Energy Consumption vs. Peers 33 • Older facilities & new technically complex space is driving up energy consumption • Older facilities should be targeted for renovation to reduce consumption • Savings should be redirected back into annual stewardship Peer Averages • Peers strong investment into infrastructure & building systems have helps level off energy consumption.
  • 35. Multiple Perspectives on Quality of Service Service Process, Campus Inspection, and Customer Survey Service Process How are requests made? Who can make requests? Who schedules the work? Is there a timeline/completion date given? Are customers made aware of request status? 34
  • 36. Multiple Perspectives on Quality of Service Service Process, Campus Inspection, and Customer Survey 0 1 2 3 4 5 Performance… Work Requests Organization Scheduling Process Centralization Service Process 35
  • 37. Multiple Perspectives on Quality of Service Service Process, Campus Inspection, and Customer Survey 0 1 2 3 4 5 Performance… Work Requests Organization Scheduling Process Centralization Service Process Campus Inspection Sightlines completes a building and grounds inspection rating the general repair, cleanliness, exterior condition, and mechanical systems spaces in a 3 hour tour 36
  • 38. Multiple Perspectives on Quality of Service Service Process, Campus Inspection, and Customer Survey 0 1 2 3 4 5 Performance… Work Requests Organization Scheduling Process Centralization Service Process 0 1 2 3 4 5 Grounds Exterior Mechanical Spaces General… Cleanliness Campus Inspection 37
  • 39. Multiple Perspectives on Quality of Service Service Process, Campus Inspection, and Customer Survey 0 1 2 3 4 5 Performance… Work Requests Organization Scheduling Process Centralization Service Process 0 1 2 3 4 5 Grounds Exterior Mechanical Spaces General… Cleanliness Campus Inspection Customer Survey 13% 50% 32% 5% Far Exceeds Expectations Exceeds Expectations Meets Expectations Below Expectations 38
  • 40. Multiple Perspectives on Quality of Service Service Process, Campus Inspection, and Customer Survey 0 1 2 3 4 5 Performance… Work Requests Organization Scheduling Process Centralization Service Process 0 1 2 3 4 5 Grounds Exterior Mechanical Spaces General… Cleanliness Campus Inspection Customer Survey 13% 50% 32% 5% Far Exceeds Expectations Exceeds Expectations Meets Expectations Below Expectations 1.00 3.00 5.00 1.00 3.00 5.00 WorkPerformance Communication & Process Excellent Performance Poor Performance Excellent Performance Best practice range Separate report with all the results & feedback 39
  • 41. 40 ROPA+ = Total Facilities Intelligence Solution 1. Stewardship falls 2. Failures increase 3. Increased operational demands 4. Customer satisfaction decreases 5. Capital investment driven by customers. Space wins over systems. 6. Backlog increases 1. Focused project selection 2. Decreasing operating costs 3. Increasing stewardship 4. Reduce emergency work 5. Increased customer satisfaction 6. Flexibility of project selection
  • 43. Five Strategies for Success Build strategically Less can be more Look ahead Keep-up Reward savings
  • 44. Less Can Be More
  • 45. > “No Net New Space” – A policy rooted in sustainability, it states that no new space on campus will be built without the removal of an equal amount of deficient square footage. > “No Net New Backlog” – A variation of no net new space that states that no new construction can occur without the mitigation of an equal value of backlog. New Policies to Control Overhead
  • 47. Campuses Taking Action Our partnership gives them the power to act and drive results
  • 49. Sample: Nearly Double Peers’ Users 7,500 More users on campus versus peer campuses Liberal Arts Comprehensive University Urban/City School Community College Users/100K GSF Campus A
  • 50. Insufficient Classroom Space? 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% % Room Utilization – General Classrooms Room Utilization Difficult Scheduling During Most of Day
  • 51. Functional Obsolescence is the Real Issue Many Small Courses, Few Small Rooms 0% 2% 43% 38% 17% 44% 23% 29% 4% 1% 41% 23% 27% 9% 0% 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 0-25 26-30 31-35 36-40 40+ Distribution of Rooms Room Capacity Fall '13 Enrollment Spring '14 Enrollment
  • 54. Fails to harness operating knowledge Does not tie to mission, strategy or master plans Ignores financial capacity Misses opportunities to optimize capital resources Technical Assessment Project Selection Today: No Integration in the Process
  • 55. Tie to Operations, Mission & Finance Technical Assessment: Conduct Building walk- throughs and component inventory to develop initial list of needs. Step 1: Integrate Technical Needs Integrate operational perspective to target inspections and reduce overall capital needs Step 2: Create Building Portfolios Segment the backlog and tie projects to mission and institutional strategy Step 3: Develop Multi-year Capital Plan Create outcome based strategies by portfolio Step 4: Project Section Pick projects that support mission, operations, and financial capacity
  • 57. 25% 31% 21% 45% 45% 23% 31% 24% 34% 22% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Construction Age Renovation Age Peer Renovation Age Buildings Under 10 Little work, “honeymoon” period. Low Risk Buildings 10 to 25 Lower cost space renewal updates and initial signs of program pressures Medium Risk Buildings 25 to 50 Life cycles are coming due in envelope and mechanical systems. Functional obsolescence prevalent. Higher Risk Buildings over 50 Life cycles of major building components are past due. Failures are possible. Core modernization cycles are missed. Highest risk Unique Campus Age Profile Under 10 10 to 25 25 to 50 Over 50
  • 58. 10 Year Capital Renewal Curve
  • 59. 10-Year Needs vs. Investment Capacity $0 $5 $10 $15 $20 $25 $30 TotalDollars(Millions) 10 Year Total Capital Need by Year $107 $120 $23 $100 $0 $50 $100 $150 $200 $250 Total 10 Year Need Projected Investment Capacity TotalDollars(Millions) 10 Year Total Capital Need & Capacity
  • 61. The Multiplier Effect of Reinvested Savings * Stewardship is the annual investment into campus facilities $1 Invested in Stewardship* …$3 in Capital Backlog Need Equals …$2.70 in Annual Operating Costs Equals $1 Invested in Planned Maintenance Another investment impact is....
  • 63. Low Energy Consumption Keeps Dropping Increase in PM supports lower energy consumption Regional Peer Avg. Regional Peer Avg. Among the top 10% of lowest consuming institutions in Sightlines’ database
  • 64. Increasing Focus on Systems, Envelope, & Infrastructure 11% 10% 20% 35% 24% Project Spending Mix Building Systems Envelope Infrastructure Space Renewal Safety/Code 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 FY08 FY09 FY10 FY11 FY12 $/GSF Project Spending $/GSF
  • 65. “The State of Facilities in Higher Education” Sightlines’ annual publication on broad industry trends JP3
  • 66. Slide 64 JP3 Update to "Coming Soon - 2015 SoF" Jay Pearlman, 10/7/2015