Achieving Flow by emphasising
◉ Small batch transfers
◉ Rapid feedback
◉ Limited work in progress (WIP)
12 critical problems with current product development
◉ Failure to correctly quantify economics
◉ Blindness to queues
◉ Worship of Efficiency
◉ Hostility to Variability
◉ Worship of conformance
◉ Institutionalization of large batch sizes
◉ Underutilization of Cadence
◉ Managing timelines instead of queues
◉ Absence of WIP Constraints
◉ Inflexibility
◉ Noneconomic Flow Control
◉ Centralized Control
Economics
COD (life-cycle profit)
When you ask them how much
life-cycle profit will decrease due
to a week of delay, they don’t
know?
Cycle time and percent value added time are only proxy variables!
The unit of measure should be life-cycle profit impact, which is the ultimate measure
of product development success
Ask 10 people
Ask them to independently estimate what it would
cost the company, in pretax profit, if their project
were 60 days late to the market.
In the last 20 years the typical range of answers
was 50 to 1.
We need Cost of Delay to evaluate
◉ The Cost of queues
◉ The Value of excess capacity
◉ The benefit of smaller batch sizes and
◉ The value of variability reduction
The value added by an activity is
the difference in the price that an
economically rational buyer would
pay for a product before and after
that activity is performed
We can define waste as the failure to optimize our economics
Money we’ve already spent is a
“sunk cost” and should not enter
into an economic choice.
Queues
Few developers realize that queues
are the single most cause of poor
product development
performance?
Only 2 percent measure queues! How big are your queues? What is the cost of these
queues? Only 15 percent know their cost of delay!!
T
Queues are leading indicators of
future cycle time problems
In product development, our
greatest waste is not unproductive
engineers, but work products
sitting idle in process queues.
Inventory in a product
development process is not
physical objects but information, it
is virtually invisible
Inventory is observable through its
effects: increased cycle time,
delayed feedback, constantly
shifting priorities, and status
reporting
We need to make quick, forceful
interventions when queues get
large
Set queue size maximums and frequently monitor queues
Economic waste by queues
◉ Longer cycle time
◉ Increased Risk
◉ More variability
◉ More overhead
◉ Lower quality
◉ Less motivation
Usually, delay cost raises linearly with queue size
Example sources of queues
◉ Marketing
◉ Analysis
◉ Purchasing
◉ Testing
◉ Management reviews
◉ Specialists
◉ ...
Queue size vs cycle time
Capacity
Utilization
Most of the damage done by a
queue is caused by high queue
states
High levels of capacity utilization
are actually a primary cause of long
cycle time
Increasing capacity utilization
increases queues exponentially.
Increasing variability increases
queues linearly.
Queue size vs. capacity utilization
Some calculations
https://docs.google.com/spreadsheets/d/1LBrN-P8d7TjGpH2iDlgYdjBjvDw1Ke4E6gp
dantRIaE/edit#gid=0
Some diagrams
https://www.actionableagile.com/analytics-demo/
CFD
Variability
We cannot eliminate all variability
without eliminating all value added!
Minimizing the economic impact of variability is a profound different goal than
minimizing variability!
To manage product development
effectively, we must recognize that
valuable new information is
constantly arriving throughout the
development cycle!
We must learn to make good economic choices using this emerging information!
We must make resources, people
and processes flexible to stay
responsive in the presence of
variability
But instead we work with specialized resources loaded to high levels of utilization...
Variability and rational risks
Asymmetric payoffs
◉ The value of a success
can be much higher
than the cost of a
failure
Batch size
Reducing batch size is usually the
single most cost effective way to
reduce queues
Smaller batches have lower risk,
are less expensive and produce
faster results. They accelerate
learning.
5-10 times improvements
Start small and start quickly!
Batch size reduction is one of the
cheapest, simplest and most
powerful ways to reduce variability
and queues
Reducing batch sizes
◉ Accelerates feedback
◉ Reduces risk (e.g. Internet and package sizes)
◉ Reduces variability in flow (otherwise causing periodic overloads)
◉ Reduces cycle time
◉ Reduces overhead
◉ Increases efficiency
◉ Increase motivation and urgency
◉ Large batches cause exponential cost and schedule growth
◉ Large batches lead to even larger batches
◉ The entire batch is limited by its worst element
◉ Small batches allows finer tuning of capacity utilization
Reduce project scope
Smaller scope leads to faster
development, which shortens
time-horizons. Reduced scope and
shorter time-horizons combine to
reduce risk. Lower risk means we
don’t need high levels of
management involved. This further
reduces decision-making delays.
Batch sizes and queues - cycle time
Reduced cycle time without change
to average arrival rate (demand) or
average departure rate (capacity).
Benefits of small batch (testing)
We do not need the perfect answer for the batch size
Managing batch sizes
◉ The most important batch is the transport batch (batch that changes the
location) - allows overlapping activities and enables faster feedback
◉ Colocate teams to communicate in small batches
◉ Short run lengths reduce queues
◉ Good infrastructure enables small batches
◉ Sequence first that which adds value most cheaply
◉ Reduce batch size before you attack bottlenecks (as bottlenecks in
product development are stochastic and physically mobile)
◉ Adjust batch size dynamically to respond to changing economics
Sources of batches
◉ Project scope
◉ Project funding (expensive funding rounds increase batches)
◉ Project phases
◉ Up front heavy requirements definition
◉ Project planning (limit detailed planning to a short time horizon)
◉ Testing
◉ Capital spending
◉ Design reviews
◉ Market research
◉ Project post mortems
Sequencing
Queue cost is affected by the
sequence in wich we handle the
jobs in the queue
The goal is to reduce the economic cost of queues, not simply to reduce the size of
queues.
Shortest Job First
High Delay Cost
First
Weighted
Shortest Job
First
NEXT?
WIP
Control Flow
Fast Feedback
Decentralized control

Más contenido relacionado

La actualidad más candente

Agile Transformation: People, Process and Tools to Make Your Transformation S...
Agile Transformation: People, Process and Tools to Make Your Transformation S...Agile Transformation: People, Process and Tools to Make Your Transformation S...
Agile Transformation: People, Process and Tools to Make Your Transformation S...QASymphony
 
Agile Transformation Defined
Agile Transformation DefinedAgile Transformation Defined
Agile Transformation DefinedChristoph Mathis
 
Agile Product Management: Getting from Backlog to Value
Agile Product Management: Getting from Backlog to ValueAgile Product Management: Getting from Backlog to Value
Agile Product Management: Getting from Backlog to ValueLeadingAgile
 
Exploring Agile Transformation and Scaling Patterns
Exploring Agile Transformation and Scaling PatternsExploring Agile Transformation and Scaling Patterns
Exploring Agile Transformation and Scaling PatternsMike Cottmeyer
 
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5netmind
 
Heart of Agile: What is Agile?
Heart of Agile: What is Agile?Heart of Agile: What is Agile?
Heart of Agile: What is Agile?Agile Tour Beirut
 
Agile Values, Principles and Practices
Agile Values, Principles and PracticesAgile Values, Principles and Practices
Agile Values, Principles and Practicesjackcrews
 
Cost of Delay, measurements and parallel vs. sequential project processing
Cost of Delay, measurements and parallel vs. sequential project processingCost of Delay, measurements and parallel vs. sequential project processing
Cost of Delay, measurements and parallel vs. sequential project processingSebastian Kamilli
 
Agile Transformation in Telco Guide
Agile Transformation in Telco GuideAgile Transformation in Telco Guide
Agile Transformation in Telco GuideACM
 
Agile-overview: Agile Manifesto, Agile principles and Agile Methodologies
Agile-overview: Agile Manifesto, Agile principles and Agile MethodologiesAgile-overview: Agile Manifesto, Agile principles and Agile Methodologies
Agile-overview: Agile Manifesto, Agile principles and Agile MethodologiesBalaji Sathram
 
Lean Agile Metrics And KPIs
Lean Agile Metrics And KPIsLean Agile Metrics And KPIs
Lean Agile Metrics And KPIsYuval Yeret
 
Five Common Challenges With Agile Transformation - Anikh Subhan - Scrum Day L...
Five Common Challenges With Agile Transformation - Anikh Subhan - Scrum Day L...Five Common Challenges With Agile Transformation - Anikh Subhan - Scrum Day L...
Five Common Challenges With Agile Transformation - Anikh Subhan - Scrum Day L...AND Digital
 
Agile Transformation
Agile TransformationAgile Transformation
Agile TransformationMax Carlin
 
Agile effort estimation
Agile effort estimation Agile effort estimation
Agile effort estimation Elad Sofer
 
SAFe® - scaled agile framework in practice
SAFe® - scaled agile framework in practiceSAFe® - scaled agile framework in practice
SAFe® - scaled agile framework in practiceIntland Software GmbH
 
Beyond the Scrum Master - Becoming an Agile Coach
Beyond the Scrum Master - Becoming an Agile CoachBeyond the Scrum Master - Becoming an Agile Coach
Beyond the Scrum Master - Becoming an Agile CoachCprime
 
Agile Mindset For Executives
Agile Mindset For ExecutivesAgile Mindset For Executives
Agile Mindset For ExecutivesMichael Tarnowski
 
Alinhando Discovery com Delivery usando Upstream Kanban
Alinhando Discovery com Delivery usando Upstream KanbanAlinhando Discovery com Delivery usando Upstream Kanban
Alinhando Discovery com Delivery usando Upstream KanbanTaller Negócio Digitais
 
Scrumban - applying agile and lean practices for daily uncertainty by Vidas V...
Scrumban - applying agile and lean practices for daily uncertainty by Vidas V...Scrumban - applying agile and lean practices for daily uncertainty by Vidas V...
Scrumban - applying agile and lean practices for daily uncertainty by Vidas V...Vidas Vasiliauskas
 

La actualidad más candente (20)

Agile Transformation: People, Process and Tools to Make Your Transformation S...
Agile Transformation: People, Process and Tools to Make Your Transformation S...Agile Transformation: People, Process and Tools to Make Your Transformation S...
Agile Transformation: People, Process and Tools to Make Your Transformation S...
 
Agile Transformation Defined
Agile Transformation DefinedAgile Transformation Defined
Agile Transformation Defined
 
RethinkingAgile_AAC2019
RethinkingAgile_AAC2019RethinkingAgile_AAC2019
RethinkingAgile_AAC2019
 
Agile Product Management: Getting from Backlog to Value
Agile Product Management: Getting from Backlog to ValueAgile Product Management: Getting from Backlog to Value
Agile Product Management: Getting from Backlog to Value
 
Exploring Agile Transformation and Scaling Patterns
Exploring Agile Transformation and Scaling PatternsExploring Agile Transformation and Scaling Patterns
Exploring Agile Transformation and Scaling Patterns
 
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
Foundations of the Scaled Agile Framework® (SAFe® ) 4.5
 
Heart of Agile: What is Agile?
Heart of Agile: What is Agile?Heart of Agile: What is Agile?
Heart of Agile: What is Agile?
 
Agile Values, Principles and Practices
Agile Values, Principles and PracticesAgile Values, Principles and Practices
Agile Values, Principles and Practices
 
Cost of Delay, measurements and parallel vs. sequential project processing
Cost of Delay, measurements and parallel vs. sequential project processingCost of Delay, measurements and parallel vs. sequential project processing
Cost of Delay, measurements and parallel vs. sequential project processing
 
Agile Transformation in Telco Guide
Agile Transformation in Telco GuideAgile Transformation in Telco Guide
Agile Transformation in Telco Guide
 
Agile-overview: Agile Manifesto, Agile principles and Agile Methodologies
Agile-overview: Agile Manifesto, Agile principles and Agile MethodologiesAgile-overview: Agile Manifesto, Agile principles and Agile Methodologies
Agile-overview: Agile Manifesto, Agile principles and Agile Methodologies
 
Lean Agile Metrics And KPIs
Lean Agile Metrics And KPIsLean Agile Metrics And KPIs
Lean Agile Metrics And KPIs
 
Five Common Challenges With Agile Transformation - Anikh Subhan - Scrum Day L...
Five Common Challenges With Agile Transformation - Anikh Subhan - Scrum Day L...Five Common Challenges With Agile Transformation - Anikh Subhan - Scrum Day L...
Five Common Challenges With Agile Transformation - Anikh Subhan - Scrum Day L...
 
Agile Transformation
Agile TransformationAgile Transformation
Agile Transformation
 
Agile effort estimation
Agile effort estimation Agile effort estimation
Agile effort estimation
 
SAFe® - scaled agile framework in practice
SAFe® - scaled agile framework in practiceSAFe® - scaled agile framework in practice
SAFe® - scaled agile framework in practice
 
Beyond the Scrum Master - Becoming an Agile Coach
Beyond the Scrum Master - Becoming an Agile CoachBeyond the Scrum Master - Becoming an Agile Coach
Beyond the Scrum Master - Becoming an Agile Coach
 
Agile Mindset For Executives
Agile Mindset For ExecutivesAgile Mindset For Executives
Agile Mindset For Executives
 
Alinhando Discovery com Delivery usando Upstream Kanban
Alinhando Discovery com Delivery usando Upstream KanbanAlinhando Discovery com Delivery usando Upstream Kanban
Alinhando Discovery com Delivery usando Upstream Kanban
 
Scrumban - applying agile and lean practices for daily uncertainty by Vidas V...
Scrumban - applying agile and lean practices for daily uncertainty by Vidas V...Scrumban - applying agile and lean practices for daily uncertainty by Vidas V...
Scrumban - applying agile and lean practices for daily uncertainty by Vidas V...
 

Similar a The Principles of product development flow - a summary

Using Cost of Delay to de-scale your organisation through decentralised decis...
Using Cost of Delay to de-scale your organisation through decentralised decis...Using Cost of Delay to de-scale your organisation through decentralised decis...
Using Cost of Delay to de-scale your organisation through decentralised decis...Michael Fagan
 
The power of lean manufacturing
The power of lean manufacturingThe power of lean manufacturing
The power of lean manufacturingMileyJames
 
Flow efficiency - a digital operations strategy
Flow efficiency - a digital operations strategyFlow efficiency - a digital operations strategy
Flow efficiency - a digital operations strategyMarcio Sete
 
The Value Stream Analysis ( Vsa ) Essay
The Value Stream Analysis ( Vsa ) EssayThe Value Stream Analysis ( Vsa ) Essay
The Value Stream Analysis ( Vsa ) EssayKelly Ratkovic
 
Lecture 25 conversion cycle -wolrd class companies & lean manufacturing-...
Lecture 25  conversion cycle -wolrd class companies & lean manufacturing-...Lecture 25  conversion cycle -wolrd class companies & lean manufacturing-...
Lecture 25 conversion cycle -wolrd class companies & lean manufacturing-...Habib Ullah Qamar
 
How to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step GuideHow to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step GuideShannon Kearns
 
CHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxCHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxPeriMinstrel
 
Quality engineering and management
Quality engineering and managementQuality engineering and management
Quality engineering and managementKushal Shah
 
Unit 5 strategic issues in logistics lscm (32 pages)logistics management
Unit 5 strategic issues in logistics   lscm (32 pages)logistics management Unit 5 strategic issues in logistics   lscm (32 pages)logistics management
Unit 5 strategic issues in logistics lscm (32 pages)logistics management Suzana Vaidya
 
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...IJMTST Journal
 
Increasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) EssayIncreasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) EssayAlison Reed
 
Products & processes
Products & processesProducts & processes
Products & processesEbtehalTamer1
 
Introduction to Lean Software Development
Introduction to Lean Software DevelopmentIntroduction to Lean Software Development
Introduction to Lean Software DevelopmentMichael Vax
 
10 Best Practices Of Software Product Management
10 Best Practices Of Software Product Management10 Best Practices Of Software Product Management
10 Best Practices Of Software Product ManagementSVPMA
 
Different ways to pay for product development presentation
 Different ways to pay for product development presentation Different ways to pay for product development presentation
Different ways to pay for product development presentationSteve Owens
 

Similar a The Principles of product development flow - a summary (20)

Using Cost of Delay to de-scale your organisation through decentralised decis...
Using Cost of Delay to de-scale your organisation through decentralised decis...Using Cost of Delay to de-scale your organisation through decentralised decis...
Using Cost of Delay to de-scale your organisation through decentralised decis...
 
The power of lean manufacturing
The power of lean manufacturingThe power of lean manufacturing
The power of lean manufacturing
 
Flow efficiency - a digital operations strategy
Flow efficiency - a digital operations strategyFlow efficiency - a digital operations strategy
Flow efficiency - a digital operations strategy
 
Tp92 pub88
Tp92 pub88Tp92 pub88
Tp92 pub88
 
The Value Stream Analysis ( Vsa ) Essay
The Value Stream Analysis ( Vsa ) EssayThe Value Stream Analysis ( Vsa ) Essay
The Value Stream Analysis ( Vsa ) Essay
 
Importance of Adaptive Planning in Agile
Importance of Adaptive Planning in AgileImportance of Adaptive Planning in Agile
Importance of Adaptive Planning in Agile
 
Lecture 25 conversion cycle -wolrd class companies & lean manufacturing-...
Lecture 25  conversion cycle -wolrd class companies & lean manufacturing-...Lecture 25  conversion cycle -wolrd class companies & lean manufacturing-...
Lecture 25 conversion cycle -wolrd class companies & lean manufacturing-...
 
How to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step GuideHow to Transform your Capacity Planning Process: Step-by-Step Guide
How to Transform your Capacity Planning Process: Step-by-Step Guide
 
CHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxCHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptx
 
Quality engineering and management
Quality engineering and managementQuality engineering and management
Quality engineering and management
 
Unit 5 strategic issues in logistics lscm (32 pages)logistics management
Unit 5 strategic issues in logistics   lscm (32 pages)logistics management Unit 5 strategic issues in logistics   lscm (32 pages)logistics management
Unit 5 strategic issues in logistics lscm (32 pages)logistics management
 
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
Keys to Succeed in Implementing Total Preventive Maintenance (TPM) and Lean S...
 
Increasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) EssayIncreasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) Essay
 
supply_chain_management.pdf
supply_chain_management.pdfsupply_chain_management.pdf
supply_chain_management.pdf
 
Innovate to excite - Novozymes, Anders Ohmann
Innovate to excite - Novozymes, Anders OhmannInnovate to excite - Novozymes, Anders Ohmann
Innovate to excite - Novozymes, Anders Ohmann
 
Products & processes
Products & processesProducts & processes
Products & processes
 
Introduction to Lean Software Development
Introduction to Lean Software DevelopmentIntroduction to Lean Software Development
Introduction to Lean Software Development
 
10 Best Practices Of Software Product Management
10 Best Practices Of Software Product Management10 Best Practices Of Software Product Management
10 Best Practices Of Software Product Management
 
Lean analytics
Lean analyticsLean analytics
Lean analytics
 
Different ways to pay for product development presentation
 Different ways to pay for product development presentation Different ways to pay for product development presentation
Different ways to pay for product development presentation
 

Más de Sebastian Kamilli

Forming Continuous Discovery Habits to increase speed of learning and drive a...
Forming Continuous Discovery Habits to increase speed of learning and drive a...Forming Continuous Discovery Habits to increase speed of learning and drive a...
Forming Continuous Discovery Habits to increase speed of learning and drive a...Sebastian Kamilli
 
How to measure anything (meetup 06.06.2018)
How to measure anything (meetup 06.06.2018)How to measure anything (meetup 06.06.2018)
How to measure anything (meetup 06.06.2018)Sebastian Kamilli
 
The Primes - How any group can solve any problem
The Primes - How any group can solve any problemThe Primes - How any group can solve any problem
The Primes - How any group can solve any problemSebastian Kamilli
 
Dynamic Team Setups (Manage Agile)
Dynamic Team Setups (Manage Agile)Dynamic Team Setups (Manage Agile)
Dynamic Team Setups (Manage Agile)Sebastian Kamilli
 

Más de Sebastian Kamilli (6)

Forming Continuous Discovery Habits to increase speed of learning and drive a...
Forming Continuous Discovery Habits to increase speed of learning and drive a...Forming Continuous Discovery Habits to increase speed of learning and drive a...
Forming Continuous Discovery Habits to increase speed of learning and drive a...
 
Scrumban (r)Evolution
Scrumban (r)EvolutionScrumban (r)Evolution
Scrumban (r)Evolution
 
How to measure anything (meetup 06.06.2018)
How to measure anything (meetup 06.06.2018)How to measure anything (meetup 06.06.2018)
How to measure anything (meetup 06.06.2018)
 
The Primes - How any group can solve any problem
The Primes - How any group can solve any problemThe Primes - How any group can solve any problem
The Primes - How any group can solve any problem
 
Dynamic Team Setups (Manage Agile)
Dynamic Team Setups (Manage Agile)Dynamic Team Setups (Manage Agile)
Dynamic Team Setups (Manage Agile)
 
Dynamic Team Setups
Dynamic Team SetupsDynamic Team Setups
Dynamic Team Setups
 

Último

NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...Amil baba
 
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...amilabibi1
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfHenry Tapper
 
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Sonam Pathan
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证jdkhjh
 
Tenets of Physiocracy History of Economic
Tenets of Physiocracy History of EconomicTenets of Physiocracy History of Economic
Tenets of Physiocracy History of Economiccinemoviesu
 
Kempen ' UK DB Endgame Paper Apr 24 final3.pdf
Kempen ' UK DB Endgame Paper Apr 24 final3.pdfKempen ' UK DB Endgame Paper Apr 24 final3.pdf
Kempen ' UK DB Endgame Paper Apr 24 final3.pdfHenry Tapper
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一S SDS
 
2024 Q1 Crypto Industry Report | CoinGecko
2024 Q1 Crypto Industry Report | CoinGecko2024 Q1 Crypto Industry Report | CoinGecko
2024 Q1 Crypto Industry Report | CoinGeckoCoinGecko
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...Henry Tapper
 
Financial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.pptFinancial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.ppttadegebreyesus
 
(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)twfkn8xj
 
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》rnrncn29
 
Stock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfStock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfMichael Silva
 
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACTGOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACTharshitverma1762
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证rjrjkk
 
Governor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintGovernor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintSuomen Pankki
 
Bladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex
 
The AES Investment Code - the go-to counsel for the most well-informed, wise...
The AES Investment Code -  the go-to counsel for the most well-informed, wise...The AES Investment Code -  the go-to counsel for the most well-informed, wise...
The AES Investment Code - the go-to counsel for the most well-informed, wise...AES International
 

Último (20)

NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
 
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
Amil Baba In Pakistan amil baba in Lahore amil baba in Islamabad amil baba in...
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
 
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
 
Tenets of Physiocracy History of Economic
Tenets of Physiocracy History of EconomicTenets of Physiocracy History of Economic
Tenets of Physiocracy History of Economic
 
Kempen ' UK DB Endgame Paper Apr 24 final3.pdf
Kempen ' UK DB Endgame Paper Apr 24 final3.pdfKempen ' UK DB Endgame Paper Apr 24 final3.pdf
Kempen ' UK DB Endgame Paper Apr 24 final3.pdf
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
 
2024 Q1 Crypto Industry Report | CoinGecko
2024 Q1 Crypto Industry Report | CoinGecko2024 Q1 Crypto Industry Report | CoinGecko
2024 Q1 Crypto Industry Report | CoinGecko
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
 
Financial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.pptFinancial analysis on Risk and Return.ppt
Financial analysis on Risk and Return.ppt
 
(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)
 
🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road
 
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
 
Stock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfStock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdf
 
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACTGOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
 
Governor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintGovernor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraint
 
Bladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results Presentation
 
The AES Investment Code - the go-to counsel for the most well-informed, wise...
The AES Investment Code -  the go-to counsel for the most well-informed, wise...The AES Investment Code -  the go-to counsel for the most well-informed, wise...
The AES Investment Code - the go-to counsel for the most well-informed, wise...
 

The Principles of product development flow - a summary

  • 1. The principles of product development flow “Second generation lean product management”
  • 2. Author DonReinertsen His latest award-winning book, The Principles of Product Development Flow: Second Generation Lean Product Development, has been praised as, “… quite simply the most advanced product development book you can buy.”
  • 3. Achieving Flow by emphasising ◉ Small batch transfers ◉ Rapid feedback ◉ Limited work in progress (WIP)
  • 4. 12 critical problems with current product development ◉ Failure to correctly quantify economics ◉ Blindness to queues ◉ Worship of Efficiency ◉ Hostility to Variability ◉ Worship of conformance ◉ Institutionalization of large batch sizes ◉ Underutilization of Cadence ◉ Managing timelines instead of queues ◉ Absence of WIP Constraints ◉ Inflexibility ◉ Noneconomic Flow Control ◉ Centralized Control
  • 6. When you ask them how much life-cycle profit will decrease due to a week of delay, they don’t know? Cycle time and percent value added time are only proxy variables! The unit of measure should be life-cycle profit impact, which is the ultimate measure of product development success
  • 7. Ask 10 people Ask them to independently estimate what it would cost the company, in pretax profit, if their project were 60 days late to the market. In the last 20 years the typical range of answers was 50 to 1.
  • 8. We need Cost of Delay to evaluate ◉ The Cost of queues ◉ The Value of excess capacity ◉ The benefit of smaller batch sizes and ◉ The value of variability reduction
  • 9. The value added by an activity is the difference in the price that an economically rational buyer would pay for a product before and after that activity is performed We can define waste as the failure to optimize our economics
  • 10. Money we’ve already spent is a “sunk cost” and should not enter into an economic choice.
  • 12. Few developers realize that queues are the single most cause of poor product development performance? Only 2 percent measure queues! How big are your queues? What is the cost of these queues? Only 15 percent know their cost of delay!! T
  • 13. Queues are leading indicators of future cycle time problems
  • 14. In product development, our greatest waste is not unproductive engineers, but work products sitting idle in process queues.
  • 15. Inventory in a product development process is not physical objects but information, it is virtually invisible
  • 16. Inventory is observable through its effects: increased cycle time, delayed feedback, constantly shifting priorities, and status reporting
  • 17. We need to make quick, forceful interventions when queues get large Set queue size maximums and frequently monitor queues
  • 18. Economic waste by queues ◉ Longer cycle time ◉ Increased Risk ◉ More variability ◉ More overhead ◉ Lower quality ◉ Less motivation Usually, delay cost raises linearly with queue size
  • 19. Example sources of queues ◉ Marketing ◉ Analysis ◉ Purchasing ◉ Testing ◉ Management reviews ◉ Specialists ◉ ...
  • 20. Queue size vs cycle time
  • 22. Most of the damage done by a queue is caused by high queue states
  • 23. High levels of capacity utilization are actually a primary cause of long cycle time
  • 24. Increasing capacity utilization increases queues exponentially. Increasing variability increases queues linearly.
  • 25. Queue size vs. capacity utilization
  • 28. CFD
  • 30. We cannot eliminate all variability without eliminating all value added! Minimizing the economic impact of variability is a profound different goal than minimizing variability!
  • 31. To manage product development effectively, we must recognize that valuable new information is constantly arriving throughout the development cycle! We must learn to make good economic choices using this emerging information!
  • 32. We must make resources, people and processes flexible to stay responsive in the presence of variability But instead we work with specialized resources loaded to high levels of utilization...
  • 33. Variability and rational risks Asymmetric payoffs ◉ The value of a success can be much higher than the cost of a failure
  • 35. Reducing batch size is usually the single most cost effective way to reduce queues
  • 36. Smaller batches have lower risk, are less expensive and produce faster results. They accelerate learning. 5-10 times improvements Start small and start quickly!
  • 37. Batch size reduction is one of the cheapest, simplest and most powerful ways to reduce variability and queues
  • 38. Reducing batch sizes ◉ Accelerates feedback ◉ Reduces risk (e.g. Internet and package sizes) ◉ Reduces variability in flow (otherwise causing periodic overloads) ◉ Reduces cycle time ◉ Reduces overhead ◉ Increases efficiency ◉ Increase motivation and urgency ◉ Large batches cause exponential cost and schedule growth ◉ Large batches lead to even larger batches ◉ The entire batch is limited by its worst element ◉ Small batches allows finer tuning of capacity utilization
  • 39. Reduce project scope Smaller scope leads to faster development, which shortens time-horizons. Reduced scope and shorter time-horizons combine to reduce risk. Lower risk means we don’t need high levels of management involved. This further reduces decision-making delays.
  • 40. Batch sizes and queues - cycle time Reduced cycle time without change to average arrival rate (demand) or average departure rate (capacity).
  • 41. Benefits of small batch (testing)
  • 42. We do not need the perfect answer for the batch size
  • 43. Managing batch sizes ◉ The most important batch is the transport batch (batch that changes the location) - allows overlapping activities and enables faster feedback ◉ Colocate teams to communicate in small batches ◉ Short run lengths reduce queues ◉ Good infrastructure enables small batches ◉ Sequence first that which adds value most cheaply ◉ Reduce batch size before you attack bottlenecks (as bottlenecks in product development are stochastic and physically mobile) ◉ Adjust batch size dynamically to respond to changing economics
  • 44. Sources of batches ◉ Project scope ◉ Project funding (expensive funding rounds increase batches) ◉ Project phases ◉ Up front heavy requirements definition ◉ Project planning (limit detailed planning to a short time horizon) ◉ Testing ◉ Capital spending ◉ Design reviews ◉ Market research ◉ Project post mortems
  • 46. Queue cost is affected by the sequence in wich we handle the jobs in the queue The goal is to reduce the economic cost of queues, not simply to reduce the size of queues.