Brief and Site Analysis
2
Table of Contents
1. Design Brief Pg.2
2. Site Analysis Pg.5
3. Condition Survey Pg.10
4. Precedent Study Pg.14
5. Proposed Designs Pg.17
6. Conclusion Pg.27
3
Design Brief
4
Design Brief
Project Objectives and Requirements:
For this project we have to take the existing Howard Gardens Campus and redevelop it into a
four star hotel and business conference centre. The main six storey block must be kept and the
South Block (and the hallway between the two) can be kept if the architect wants but it is not
mandatory. The rest of the site can be demolished and changed to what to client wants.
Client Priorities:
I have provided a list of requirements that should ideally be followed to accommodate to the
buildings needs, these include:
Hotel Facilities:
 Rooms to accommodate business people there for conferences (and their families).
 Gym and swimming pool facilities.
 Reception and waiting area/lounge.
Conference Facilities:
 Main conference room in a ‘theatre’ layout to seat 300 delegates. Appropriate ‘break-out’
space should be included. This space should also open out to private external space.
 A lecture theatre to seat 150
 A range of conference/meeting rooms to accommodate between 10 people and up to 100
people. It is envisaged there will be a number of events/meetings taking place at the ven-
ue at the same time but you should also consider flexibility in the use of spaces so they
can adapt for different functions.
 Flexible exhibition space adjacent to the conference/meeting rooms.

Dining Facilities :
 A formal restaurant with table service.
 A lounge bar with an all day bar menu.
Car park :
 Should have adequate spacing for the staff and the guests of the hotel.
Exterior View of the Car park:
5
Site Analysis
6
Site Location
The access to the site is very convenient. There are many ways to get to the building, either
through walking, getting the bus or train. The site is only a 5 minute walk to Queens street
where there are many shops and restaurants. Cardiff Central train station is a 20 minute walk
away from the site. Cardiff Central Bus Station is only a 20 minute walk away from the campus
and a number of other buses stop by the site that go to different locations across Cardiff. The
buses that go to the site are 28,38,45,49 and 58.
 The 28 goes from Thornhill to the City Centre
 The 38 goes from Heath Hospital to the City Centre
 The 45 goes from Rumney to the City Centre
 The 49 goes from Llanrumney to the City Centre
 The 58 goes from Pontprennau to the City Centre
Bus location near Howard Gardens Site
Location A
Location B
7
Surrounding Buildings
The surrounding buildings consist of many different types of buildings. The Tredegarville CW
Primary School is just North of the site. The are two hotels near the site that could cause com-
petition for our hotel. These are the Mercure Cardiff Holland House Hotel and Spa to the North
-west and the Splotlands Hotel to the West. Other buildings near by are The New Addie (to the
South) and A Shot in The Dark (to the North), both of these are bars. The Cardiff royal Infirmary
is just to the North-east of the hotel. To the South of the site is the Cardiff Magistrates Courts,
Cardiff Central Fir Station and Cardiff Prison.
Location A
Location B
Site Location and surrounding buildings
8
Sun & Wind Diagram
Sun Diagram
The Sun Diagram shown below shows what areas of the building the sun effects. The sun rises
in the East and sets in the West. The South face of the building gets the most sun . It might be
ideal to provide bigger windows on the South side of the building to provide more artificial
light and heat into the building.
Sun Diagram
Wind Diagram
Wind Diagram
This shows the prevailing winds that will hit the building throughout the year. It shows that
wind mainly comes from The North East direction and hits the building in a South Westerly di-
rection.
9
Shadow Diagram
4pm, 21st December
This images show the shadows that will be cast by the hotel as well as the surrounding build-
ings in the area. This is helpful because it gives and indication of what parts of the building will
get the most sunlight during the day as well as showing what parts of the building will be cast
in shadow.
9am, 21st December
4 pm, 21st June
From the images we can see that the area North of the main hotel building (Red) will be cov-
ered in shadow which will decrease any chance of natural light getting to this area. This means
that if I want the build smaller buildings (like the conference centre then the ideal place to
build them would be to the South of the building so that they can get more sunlight during the
day.
9am, 21st June
10
Condition Survey
11
Condition Survey
Overall Impression:
I will be looking at the Main Block for the condition survey because this is the only part of the
building I will be keeping. My overall impression of the Main Block is that it is quite bad condi-
tion and that the best option would most likely to strip the building down to just the columns
and floors. The roof will be removed because it leaks and in bad condition. For this condition
survey I will be looking at the floor, roof and walls of most of the building to give my impression
of the existing building.
Windows on
Ground Floor:
Main Gallery:
The Main gallery on the Ground Floor is rela-
tively clean. The walls are in good condition
and the roof is also in good condition. The
roof and its framework is exposed and some
of the lights aren’t installed fully. The floor
has numerous chips taken out of it and is vis-
ibly damaged. The windows will need replac-
ing as they are only single glazing.
Interior View:
View of the Floor: View of the Walls:
12
Condition Survey
Stairs:
The condition of the stairs are quite bad. There are numerous chips and markings
on the floor. The Walls are quite dirty and marked/scraped. The roof is in bad con-
dition and prone to leaking.
Floor of stairs
There are many exposed pipes along the stairwell and on every landing. The height
of the steps also change depending on what floor your on which can cause serious
harm if there is a fire. There is a ladder on the top of the stairs that goes to no-
where that hasn’t been removed
Exposed pipe and fire hose on stairs Exposed Ladder
Floor of Landing
13
Condition Survey
1st to 5th Floor
All the floors apart from the ground floor are al generally the same and because of this I am do-
ing their condition survey on one survey. The floors are in bad condition, there are a load
of chips and scratches on them. The walls are in bad condition with the paint wearing off most
of the walls.
The roofs are generally exposed so that you can see what they’re made of. There are a lot of
exposed pipes that can be seen around the rooms. These are usually pipes for heating but
there are also huge pipes for ventilation that are exposed.
Roof of the storey
Piping exposed on roof
14
Precedent Study
15
Precedent Survey
Precedent Survey
For the precedent study I'm going to go through existing buildings, features and materials that
have influenced my finished design of the building. These buildings will have either influenced
the design, sustainable technologies or the materials that will be used in my building.
Exterior Designs:
For the conference centre I want to give the building a lot of access to natural light since the
building will have a lot of sun light on it. To achieve this I want to give the building a lot of glass
to the exterior as shown in the examples below. I also want to give the exterior a stone finish
which I think will make it compliment the hotel and give a more natural feel.
The Venue, Aberdeen Horse and Jockey Hotel, Tipperary
For the hotel I want a very plain white exterior the has a nice looks to it. I want the conference
to be the stand out building from the exterior so that it will help businesses to pick it over other
competitors.
Hotel Arista Naperville, Illinois Burbury Hotel, Canberra
Crowne Plaza, London
16
Precedent Survey
G Hotel
Exterior View of the hotel
The G Hotel is a 4 star hotel in Penang, Malaysia is where I will be getting my hotel interior de-
sign from. As you can see from the photos below the building has a very warm and bright feel
to it.
This hotel also has great room designs and looks, the hotel provides a bar, resaurant , large
lounge and big spacious rooms. I want to have all these things in my final design to help it
achieve its four star status.
Interior of the hotel: Bar (above), Rooms (upper
right) and Hallway (right)
17
Proposed Designs
18
Area & Volumetric Diagram
Area Diagram Volume Diagram
Rooms Colour Length Width
Hotel 54.5m 17m
Hallways 13m 6m
Gym 25m 15m
Conference
Centre
30m 15m
Rooms Colour Area Height
Hotel 926.5m2
25.5m
Hallways 78m2
2.7m
Gym 375m2
8.1m
Conference
Centre
450m2
5.4m
19
Proposed Design 1
20
Proposed Design 1
Ground Floor
Room Colour Area
Lobby 357m2
Reception 27m2
Sitting Area 36m2
Bar 110m2
Restaurant 340m2
Toilets 72m2
Stairs 15m2
Hallways 36m2
Lounge (Conference Cen-
tre)
70m2
300 seat Conference Hall 250m2
Small conference Room 40m2
Swimming Pool 180m2
Reception( Leisure Centre) 60m2
21
Proposed Design 1
1st Floor
Room Colour Area
Hall 92m2
Single Rooms 37.5m2
Double Rooms 51m2
Gym 345m2
Conference Rooms 62m2
Lounge 165m2
22
Proposed Design 1
Top Floor
Rooms Colour Area
Suites 78m2
Hall 93m2
Balcony 203.5m2
Stairs 12.6m2
23
Proposed Design 2
24
Proposed Design 1
Ground Floor
Room Colour Area
Lobby 357m2
Reception 27m2
Sitting Area 36m2
Bar 110m2
Restaurant 340m2
Toilets 72m2
Stairs 15m2
Conference Rooms 36m2
Swimming Pool 70m2
Kitchen 250m2
Reception( Leisure Centre) 60m2
25
Proposed Design 2
Top Floor
Rooms Colour Area
Family Bedroom 78m2
Single Bedroom 93m2
Double Bedroom 203.5m2
Stairs 12.6m2
Hall
300 seat Conference Centre
Conference Rooms
Toilets
26
Proposed Design 2
Top Floor
Rooms Colour Area
Suites 78m2
Large Bedrooms 93m2
Hall 203.5m2
Stairs 12.6m2
27
Conclusion
28
Conclusion
For my project I will be picking my 1st proposed design. The reason I picked this is because the
conference centre and gym are on the south side of the building. This provides natural light in
to these buildings. The conference centre can only be accessed by going through the hotel
which will help the conference centre more organised and stop people wandering in. All mate-
rials will be further investigated to find the most efficient and cost effective materials

Más contenido relacionado

La actualidad más candente

Data collection of five star hotel
Data collection of five star hotelData collection of five star hotel
Data collection of five star hotelAr. Sahid Akhtar
 
Hotel taj vivanta Vadodara
Hotel taj vivanta VadodaraHotel taj vivanta Vadodara
Hotel taj vivanta VadodaraZuber Memon
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEjagrutib22
 
Architectural Bye-Laws For Hotels
Architectural Bye-Laws For HotelsArchitectural Bye-Laws For Hotels
Architectural Bye-Laws For HotelsAr. Md Shahroz Alam
 
Shopping Mall - Thesis 2016
Shopping Mall - Thesis 2016Shopping Mall - Thesis 2016
Shopping Mall - Thesis 2016MOHAMMED RABIN
 
Multicomplex and Commercial Complex
Multicomplex  and Commercial ComplexMulticomplex  and Commercial Complex
Multicomplex and Commercial ComplexRemisha Maharjan
 
HOTEL CASE STUDY- HYATT REGENCY AMRITSAR
HOTEL CASE STUDY- HYATT REGENCY AMRITSARHOTEL CASE STUDY- HYATT REGENCY AMRITSAR
HOTEL CASE STUDY- HYATT REGENCY AMRITSARanonymous
 
4 star hotels design standards أسس تصميم فندق
4 star hotels design standards أسس تصميم فندق4 star hotels design standards أسس تصميم فندق
4 star hotels design standards أسس تصميم فندقYasmine Bannoura
 
HRACC 5 Star Hotel Design Requirements,India
HRACC 5 Star Hotel Design Requirements,IndiaHRACC 5 Star Hotel Design Requirements,India
HRACC 5 Star Hotel Design Requirements,IndiaAbdur Rahman M S
 
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDY
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDYBUSINESS HOTEL CASE STUDY AND LITERATURE STUDY
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDYAgrima Garg
 
5.1 Mixed use building
5.1 Mixed use building5.1 Mixed use building
5.1 Mixed use buildingshabbirtg
 
LITERATURE STUDY....pptx
LITERATURE STUDY....pptxLITERATURE STUDY....pptx
LITERATURE STUDY....pptxsamikshabisht3
 
Commercial complex at parel south mumbai
Commercial complex   at parel south mumbaiCommercial complex   at parel south mumbai
Commercial complex at parel south mumbaiRAAJESH SHETH
 
Le meridien hotel
Le meridien hotelLe meridien hotel
Le meridien hotelakkipandat
 
Service core
Service coreService core
Service coreaduiti
 
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...Anurag Mathur
 

La actualidad más candente (20)

Data collection of five star hotel
Data collection of five star hotelData collection of five star hotel
Data collection of five star hotel
 
Portfolio
PortfolioPortfolio
Portfolio
 
5 Star Hotel Project
5 Star Hotel Project5 Star Hotel Project
5 Star Hotel Project
 
Hotel taj vivanta Vadodara
Hotel taj vivanta VadodaraHotel taj vivanta Vadodara
Hotel taj vivanta Vadodara
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNE
 
Architectural Bye-Laws For Hotels
Architectural Bye-Laws For HotelsArchitectural Bye-Laws For Hotels
Architectural Bye-Laws For Hotels
 
Shopping Mall - Thesis 2016
Shopping Mall - Thesis 2016Shopping Mall - Thesis 2016
Shopping Mall - Thesis 2016
 
Multicomplex and Commercial Complex
Multicomplex  and Commercial ComplexMulticomplex  and Commercial Complex
Multicomplex and Commercial Complex
 
HOTEL CASE STUDY- HYATT REGENCY AMRITSAR
HOTEL CASE STUDY- HYATT REGENCY AMRITSARHOTEL CASE STUDY- HYATT REGENCY AMRITSAR
HOTEL CASE STUDY- HYATT REGENCY AMRITSAR
 
4 star hotels design standards أسس تصميم فندق
4 star hotels design standards أسس تصميم فندق4 star hotels design standards أسس تصميم فندق
4 star hotels design standards أسس تصميم فندق
 
HRACC 5 Star Hotel Design Requirements,India
HRACC 5 Star Hotel Design Requirements,IndiaHRACC 5 Star Hotel Design Requirements,India
HRACC 5 Star Hotel Design Requirements,India
 
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDY
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDYBUSINESS HOTEL CASE STUDY AND LITERATURE STUDY
BUSINESS HOTEL CASE STUDY AND LITERATURE STUDY
 
5.1 Mixed use building
5.1 Mixed use building5.1 Mixed use building
5.1 Mixed use building
 
LITERATURE STUDY....pptx
LITERATURE STUDY....pptxLITERATURE STUDY....pptx
LITERATURE STUDY....pptx
 
Commercial complex at parel south mumbai
Commercial complex   at parel south mumbaiCommercial complex   at parel south mumbai
Commercial complex at parel south mumbai
 
Le meridien hotel
Le meridien hotelLe meridien hotel
Le meridien hotel
 
Service core
Service coreService core
Service core
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
 
Literature ; shopping mall
Literature ; shopping mallLiterature ; shopping mall
Literature ; shopping mall
 

Similar a Brief and Site Analysis

ICI - Final Project - Brief Report
ICI - Final Project - Brief ReportICI - Final Project - Brief Report
ICI - Final Project - Brief ReportYung Kai
 
PROJECT SHOWCASE Materialisation & Visuals
PROJECT SHOWCASE Materialisation & VisualsPROJECT SHOWCASE Materialisation & Visuals
PROJECT SHOWCASE Materialisation & VisualsLeyana Clarke
 
Should I Stay Or Go
Should I Stay Or GoShould I Stay Or Go
Should I Stay Or Gobrianholmes
 
Should I Stay Or Go
Should I Stay Or GoShould I Stay Or Go
Should I Stay Or Gonickhull
 
Gymnasium and indoor swimming pool portfolio (Mousa jamal)
Gymnasium and indoor swimming pool portfolio (Mousa jamal)Gymnasium and indoor swimming pool portfolio (Mousa jamal)
Gymnasium and indoor swimming pool portfolio (Mousa jamal)ArchMoosa
 
Building Re-Imaging | Case Studies
Building Re-Imaging | Case StudiesBuilding Re-Imaging | Case Studies
Building Re-Imaging | Case StudiesBrad Campbell
 
High-Rise Iconic Buildings
High-Rise Iconic BuildingsHigh-Rise Iconic Buildings
High-Rise Iconic BuildingsDania Abdel-aziz
 
final report draft.pdf
final report draft.pdffinal report draft.pdf
final report draft.pdfEyuel24
 
ARCHITECT AND CONTRACTOR
ARCHITECT AND CONTRACTORARCHITECT AND CONTRACTOR
ARCHITECT AND CONTRACTORPeter Wessels
 
Visionart Profile
Visionart ProfileVisionart Profile
Visionart Profilejaved
 
Hotel design considerations
Hotel design considerationsHotel design considerations
Hotel design considerationsSubrata Mandal
 
Ici final project document
Ici final project documentIci final project document
Ici final project documentMomo Poyi
 
Htm 3230 recap oct 2010
Htm 3230 recap oct 2010Htm 3230 recap oct 2010
Htm 3230 recap oct 2010Hans van Wees
 

Similar a Brief and Site Analysis (20)

Abvance Cad
Abvance CadAbvance Cad
Abvance Cad
 
Environmental modelling report
Environmental modelling reportEnvironmental modelling report
Environmental modelling report
 
Energy modelling Report
Energy modelling ReportEnergy modelling Report
Energy modelling Report
 
ICI - Final Project - Brief Report
ICI - Final Project - Brief ReportICI - Final Project - Brief Report
ICI - Final Project - Brief Report
 
PROJECT SHOWCASE Materialisation & Visuals
PROJECT SHOWCASE Materialisation & VisualsPROJECT SHOWCASE Materialisation & Visuals
PROJECT SHOWCASE Materialisation & Visuals
 
TowerAlDhafra - book3_24Sep2007
TowerAlDhafra - book3_24Sep2007TowerAlDhafra - book3_24Sep2007
TowerAlDhafra - book3_24Sep2007
 
Should I Stay Or Go
Should I Stay Or GoShould I Stay Or Go
Should I Stay Or Go
 
Should I Stay Or Go
Should I Stay Or GoShould I Stay Or Go
Should I Stay Or Go
 
QEN Portfolio CV Over All
QEN Portfolio CV Over AllQEN Portfolio CV Over All
QEN Portfolio CV Over All
 
Gymnasium and indoor swimming pool portfolio (Mousa jamal)
Gymnasium and indoor swimming pool portfolio (Mousa jamal)Gymnasium and indoor swimming pool portfolio (Mousa jamal)
Gymnasium and indoor swimming pool portfolio (Mousa jamal)
 
Building Re-Imaging | Case Studies
Building Re-Imaging | Case StudiesBuilding Re-Imaging | Case Studies
Building Re-Imaging | Case Studies
 
High-Rise Iconic Buildings
High-Rise Iconic BuildingsHigh-Rise Iconic Buildings
High-Rise Iconic Buildings
 
Objective of site visit
Objective of site visitObjective of site visit
Objective of site visit
 
final report draft.pdf
final report draft.pdffinal report draft.pdf
final report draft.pdf
 
ARCHITECT AND CONTRACTOR
ARCHITECT AND CONTRACTORARCHITECT AND CONTRACTOR
ARCHITECT AND CONTRACTOR
 
Visionart Profile
Visionart ProfileVisionart Profile
Visionart Profile
 
Hotel design considerations
Hotel design considerationsHotel design considerations
Hotel design considerations
 
Mohan 3
Mohan 3Mohan 3
Mohan 3
 
Ici final project document
Ici final project documentIci final project document
Ici final project document
 
Htm 3230 recap oct 2010
Htm 3230 recap oct 2010Htm 3230 recap oct 2010
Htm 3230 recap oct 2010
 

Brief and Site Analysis

  • 1. 1 Brief and Site Analysis
  • 2. 2 Table of Contents 1. Design Brief Pg.2 2. Site Analysis Pg.5 3. Condition Survey Pg.10 4. Precedent Study Pg.14 5. Proposed Designs Pg.17 6. Conclusion Pg.27
  • 4. 4 Design Brief Project Objectives and Requirements: For this project we have to take the existing Howard Gardens Campus and redevelop it into a four star hotel and business conference centre. The main six storey block must be kept and the South Block (and the hallway between the two) can be kept if the architect wants but it is not mandatory. The rest of the site can be demolished and changed to what to client wants. Client Priorities: I have provided a list of requirements that should ideally be followed to accommodate to the buildings needs, these include: Hotel Facilities:  Rooms to accommodate business people there for conferences (and their families).  Gym and swimming pool facilities.  Reception and waiting area/lounge. Conference Facilities:  Main conference room in a ‘theatre’ layout to seat 300 delegates. Appropriate ‘break-out’ space should be included. This space should also open out to private external space.  A lecture theatre to seat 150  A range of conference/meeting rooms to accommodate between 10 people and up to 100 people. It is envisaged there will be a number of events/meetings taking place at the ven- ue at the same time but you should also consider flexibility in the use of spaces so they can adapt for different functions.  Flexible exhibition space adjacent to the conference/meeting rooms.  Dining Facilities :  A formal restaurant with table service.  A lounge bar with an all day bar menu. Car park :  Should have adequate spacing for the staff and the guests of the hotel. Exterior View of the Car park:
  • 6. 6 Site Location The access to the site is very convenient. There are many ways to get to the building, either through walking, getting the bus or train. The site is only a 5 minute walk to Queens street where there are many shops and restaurants. Cardiff Central train station is a 20 minute walk away from the site. Cardiff Central Bus Station is only a 20 minute walk away from the campus and a number of other buses stop by the site that go to different locations across Cardiff. The buses that go to the site are 28,38,45,49 and 58.  The 28 goes from Thornhill to the City Centre  The 38 goes from Heath Hospital to the City Centre  The 45 goes from Rumney to the City Centre  The 49 goes from Llanrumney to the City Centre  The 58 goes from Pontprennau to the City Centre Bus location near Howard Gardens Site Location A Location B
  • 7. 7 Surrounding Buildings The surrounding buildings consist of many different types of buildings. The Tredegarville CW Primary School is just North of the site. The are two hotels near the site that could cause com- petition for our hotel. These are the Mercure Cardiff Holland House Hotel and Spa to the North -west and the Splotlands Hotel to the West. Other buildings near by are The New Addie (to the South) and A Shot in The Dark (to the North), both of these are bars. The Cardiff royal Infirmary is just to the North-east of the hotel. To the South of the site is the Cardiff Magistrates Courts, Cardiff Central Fir Station and Cardiff Prison. Location A Location B Site Location and surrounding buildings
  • 8. 8 Sun & Wind Diagram Sun Diagram The Sun Diagram shown below shows what areas of the building the sun effects. The sun rises in the East and sets in the West. The South face of the building gets the most sun . It might be ideal to provide bigger windows on the South side of the building to provide more artificial light and heat into the building. Sun Diagram Wind Diagram Wind Diagram This shows the prevailing winds that will hit the building throughout the year. It shows that wind mainly comes from The North East direction and hits the building in a South Westerly di- rection.
  • 9. 9 Shadow Diagram 4pm, 21st December This images show the shadows that will be cast by the hotel as well as the surrounding build- ings in the area. This is helpful because it gives and indication of what parts of the building will get the most sunlight during the day as well as showing what parts of the building will be cast in shadow. 9am, 21st December 4 pm, 21st June From the images we can see that the area North of the main hotel building (Red) will be cov- ered in shadow which will decrease any chance of natural light getting to this area. This means that if I want the build smaller buildings (like the conference centre then the ideal place to build them would be to the South of the building so that they can get more sunlight during the day. 9am, 21st June
  • 11. 11 Condition Survey Overall Impression: I will be looking at the Main Block for the condition survey because this is the only part of the building I will be keeping. My overall impression of the Main Block is that it is quite bad condi- tion and that the best option would most likely to strip the building down to just the columns and floors. The roof will be removed because it leaks and in bad condition. For this condition survey I will be looking at the floor, roof and walls of most of the building to give my impression of the existing building. Windows on Ground Floor: Main Gallery: The Main gallery on the Ground Floor is rela- tively clean. The walls are in good condition and the roof is also in good condition. The roof and its framework is exposed and some of the lights aren’t installed fully. The floor has numerous chips taken out of it and is vis- ibly damaged. The windows will need replac- ing as they are only single glazing. Interior View: View of the Floor: View of the Walls:
  • 12. 12 Condition Survey Stairs: The condition of the stairs are quite bad. There are numerous chips and markings on the floor. The Walls are quite dirty and marked/scraped. The roof is in bad con- dition and prone to leaking. Floor of stairs There are many exposed pipes along the stairwell and on every landing. The height of the steps also change depending on what floor your on which can cause serious harm if there is a fire. There is a ladder on the top of the stairs that goes to no- where that hasn’t been removed Exposed pipe and fire hose on stairs Exposed Ladder Floor of Landing
  • 13. 13 Condition Survey 1st to 5th Floor All the floors apart from the ground floor are al generally the same and because of this I am do- ing their condition survey on one survey. The floors are in bad condition, there are a load of chips and scratches on them. The walls are in bad condition with the paint wearing off most of the walls. The roofs are generally exposed so that you can see what they’re made of. There are a lot of exposed pipes that can be seen around the rooms. These are usually pipes for heating but there are also huge pipes for ventilation that are exposed. Roof of the storey Piping exposed on roof
  • 15. 15 Precedent Survey Precedent Survey For the precedent study I'm going to go through existing buildings, features and materials that have influenced my finished design of the building. These buildings will have either influenced the design, sustainable technologies or the materials that will be used in my building. Exterior Designs: For the conference centre I want to give the building a lot of access to natural light since the building will have a lot of sun light on it. To achieve this I want to give the building a lot of glass to the exterior as shown in the examples below. I also want to give the exterior a stone finish which I think will make it compliment the hotel and give a more natural feel. The Venue, Aberdeen Horse and Jockey Hotel, Tipperary For the hotel I want a very plain white exterior the has a nice looks to it. I want the conference to be the stand out building from the exterior so that it will help businesses to pick it over other competitors. Hotel Arista Naperville, Illinois Burbury Hotel, Canberra Crowne Plaza, London
  • 16. 16 Precedent Survey G Hotel Exterior View of the hotel The G Hotel is a 4 star hotel in Penang, Malaysia is where I will be getting my hotel interior de- sign from. As you can see from the photos below the building has a very warm and bright feel to it. This hotel also has great room designs and looks, the hotel provides a bar, resaurant , large lounge and big spacious rooms. I want to have all these things in my final design to help it achieve its four star status. Interior of the hotel: Bar (above), Rooms (upper right) and Hallway (right)
  • 18. 18 Area & Volumetric Diagram Area Diagram Volume Diagram Rooms Colour Length Width Hotel 54.5m 17m Hallways 13m 6m Gym 25m 15m Conference Centre 30m 15m Rooms Colour Area Height Hotel 926.5m2 25.5m Hallways 78m2 2.7m Gym 375m2 8.1m Conference Centre 450m2 5.4m
  • 20. 20 Proposed Design 1 Ground Floor Room Colour Area Lobby 357m2 Reception 27m2 Sitting Area 36m2 Bar 110m2 Restaurant 340m2 Toilets 72m2 Stairs 15m2 Hallways 36m2 Lounge (Conference Cen- tre) 70m2 300 seat Conference Hall 250m2 Small conference Room 40m2 Swimming Pool 180m2 Reception( Leisure Centre) 60m2
  • 21. 21 Proposed Design 1 1st Floor Room Colour Area Hall 92m2 Single Rooms 37.5m2 Double Rooms 51m2 Gym 345m2 Conference Rooms 62m2 Lounge 165m2
  • 22. 22 Proposed Design 1 Top Floor Rooms Colour Area Suites 78m2 Hall 93m2 Balcony 203.5m2 Stairs 12.6m2
  • 24. 24 Proposed Design 1 Ground Floor Room Colour Area Lobby 357m2 Reception 27m2 Sitting Area 36m2 Bar 110m2 Restaurant 340m2 Toilets 72m2 Stairs 15m2 Conference Rooms 36m2 Swimming Pool 70m2 Kitchen 250m2 Reception( Leisure Centre) 60m2
  • 25. 25 Proposed Design 2 Top Floor Rooms Colour Area Family Bedroom 78m2 Single Bedroom 93m2 Double Bedroom 203.5m2 Stairs 12.6m2 Hall 300 seat Conference Centre Conference Rooms Toilets
  • 26. 26 Proposed Design 2 Top Floor Rooms Colour Area Suites 78m2 Large Bedrooms 93m2 Hall 203.5m2 Stairs 12.6m2
  • 28. 28 Conclusion For my project I will be picking my 1st proposed design. The reason I picked this is because the conference centre and gym are on the south side of the building. This provides natural light in to these buildings. The conference centre can only be accessed by going through the hotel which will help the conference centre more organised and stop people wandering in. All mate- rials will be further investigated to find the most efficient and cost effective materials