SlideShare una empresa de Scribd logo
1 de 50
Engeldot-Water (CARS) Control and
Management System
EWCM
EWCM
Control / Overview
Management
Reports/ Analytics
Alarm/ Damage
Maintenance
Data Back-up
5. Configurations
1. One Proven All – Inn General and Local Management system, total on-line overview of all
your pump stations, water treatment plants, optional (flood control, gate valves)
2. On the map you are able to see and control and steer al the water pump and treatment
locations
3. The system inform you when there is a technical problem, or when the system needs
maintenance
4. Report the technical functionality of each water treatment plants
5. Steer and control your system in the management and user location
6. Registers the needs of maintenance, service and spare part management
7. Registers the capacity, water use, energy consumption and disruption off each pump and
installation
8. Alerts you when here is damage on one of your systems. (can Alert you for leeks or troubles
in the drinking water distribution systems)
9. Can be Registers your drinking water distribution and sewage Piping systems in the city
(GIS)
10. Optional (plug-in other civil facilities to control like the streetlights, traffic lights in the city
Introduction of the capabilities of
the EWCM system
Introduction Video “How it works”
5. Configurations
• Control of all your water systems and water treatment systems from
one central point
• Control of all maintenance from one organization
• Quick insight into leaks or vandalism to the systems
• Read-out of a numerous data information about the water quality
and the power consumption
• The functioning of the different systems can be compared
• Ensure and report on safe and healthy water quality
• Our system is durable, reliable and easy to use
Why choose the Engeldot-Water Control and
Management System
5. Configurations
Introduction of the capabilities of the
EWCM system 1
1. General Management EWCM
EWCM Online Login Screen
Geographic overview
Visualisation
Search by station
Management Function
Geo maps
2. Alarms
Visualization alarm notification on map or list
Alarm statistics
Causes statistics
Appointment of the cause of the alarm
3. Registrations
Types substations per plant
Water quality
Functionality, power consumption, faults and maintenance
Water level, motor currents, arrow water point per pump
History of functionality and maintenance
4. Documents
Manuals per system
System Drawings
Pictures installation and pumps
Parts lists
Electricity Plan
5. Configurations
Introduction of the capabilities of the
EWCM system 2
5. Configurations
Users
Maintenance Technicians
Responsibilities
6. Services & Maintenance
Relations & suppliers
Parts specifications
Work orders & Responsible persons
Inspection results
Overview active or dissolved disruptions
Which activities are performed
Archive, History and reporting
7. Analyses
Detailed data analysis by system
Reporting system operating hours, functionalities, peaks and valleys
Reporting and maintenance
8. Maintenance
Notification required maintenance
Report of executed maintenance
5. Configurations
1. General Management EWCM
• EWCM Online Login Screen
• Geographic overview
• Visualisation
• Search by station
• Management Function
• Geo maps
Engeldot-Water Control and Management System ( EWCM )
General Management EWCM
EWCM Online Login Screen
• Log in with a user's own password
• All credentials are registered for
reporting
• Each user has it's own access within
the system
• Each user has it's own power to adapt
the system
Geographic overview
• Overview of all connected water
treatment plants, pumping stations
and pumping stations on an
interactive map
• Easy in and out zoom on the map to
view a location
• Up to date overview of alarm
reporting faults or maintenance on
one map
• Pumping stations, treatment plants
and pumping station have their own
recognition on the map
The Engeldot-Water EWCM system step by step
Login Screen
Geographic overview
5. Configurations
The Engeldot-Water EWCM system step by step
General Management EWCM
Visualisation
• All locations visible in one geographic
map
• Up to date overview of the state of all
systems and pumping stations in one
list
• If necessary in case off emergency the
machine can be turned off from a
distance
• You can see the responsible persons
that are currently logged in to the
system
Search by station
• Search by name or number of a
particular data, person or installation
Management Function
Zoom in on location
Own recognizance icon
5. Configurations
Geographic overview of all locations
Maintenance alarm
Zoom in on location
5. Configurations
Overview of all locations in one list
Overview Notes of all systems
5. Configurations
Online General management
General Management EWCM
Management Function
• Signalling alarm notification and
maintenance work
• Add documents per plant (photos,
manuals, system description
• Ties notion adding to plants
• Parts description (which parts are
there in the system)
• Creating Work Orders (which
privileges have any employees)log
Processing
• Making maintenance History
overviews and comparisons
• Enter Work Orders
• Job transfer letter for transfer to
subsequent employee
• Reports readout to detect anomalies
in time and to rectify them
Management Function
5. Configurations
Online General management and privileges
General Management and
privileges
Management privileges
Managers privileges
Maintenance privileges
Mechanic employer privileges
• The system can be arranged so that
each completed controller has its own
privileges to view or change
information in the system
Users privileges
Technical information
5. Configurations
Add Notes for particular employees
General Management EWCM
• Transfer or communication to
colleagues
• Add notes about observations of a
system (what's going on or what
needs to be done)
• Write a message to certain
employees
• Add a note to particular system or
pumping station
Add Note’s
Everywhere online login
5. Configurations
Add Document to each System of Pump station
General Management EWCM
Management Function
• Signalling alarm notification and
maintenance work
• Understanding the system description
• Can act quickly to resolve interference
• The responsible engineer
automatically notifies the fault
• From the central control room the
execution of maintenance and
malfunctions are easily to keep an eye
on the performance
Add documents
Type off pump
System drowings
5. Configurations
Geo Maps
Overview of all installations, pumps
and water treatment plants.
• Overview off the require
maintenance of all systems
• Overview of the pipework's,
pipelines
• Overview off all water meters per
household or business
• Direct insight which employee
working on any location or system
The coloured balls give instant
overview of the attention that the
system needs
1. Red is urgent
2. Blue needs to be looked at
3. Green is ok
The status of the report can be
followed from a central point.
1. Witch employ is on duty
2. When the error is solved
Geo maps overview of all systems
5. Configurations
Geo maps overview of piping en water meters
Geo Maps
Overview of the pipework, pipelines.
• Quick insight on leaks or vandalism
• In one list the total view of all
reports of the required attention by
system
Pipelines
Water meters
5. Configurations
2. Alarms
• Visualization alarm notification on map
or list
• Alarm statistics
• Causes statistics
• Appointment of the cause of the alarm
• History of the alarms
Engeldot-Water Control and Management System ( EWCM )
5. Configurations
Alarms
• Visualization alarm notification
on map or list
• Alarm statistics
• Causes statistics
• Appointment of the cause of
the alarm
• Automatically alert mechanic
Alarms alert, description and cause
Total overview
Solved
Current faults
Reporting disturbances
5. Configurations
Alarm statistics
• Visualization on statistic list
• Alarm status
• Causes of the alarm
• Notification to mechanic
• Duration of the alarm
• Actual or solved
• History of the alarms
Alarm statistics per system
Reports of failures, leaks, improper functioning and water quality
• See which faults are open or resolved
• View of the failure details
• Insight into the system to see in actual turning of the plant or pump
• To which employee the failure is reported
• viewing the history of a failure
Overview statistic of al the stations
Alarm information
5. Configurations
Alarms cause
• Visualization alarm notification
on map or list
• Alarm statistics
• Causes statistics
• Appointment of the cause of
the alarm
Alarm statistics
• How often there is a failure at that
location
• How often the fault alarm
• The failures are being reported
• For which reason the interference
performs
Alarm cause en statistics per system
Current information
5. Configurations
Current information
• Running machine online live insight
• Zoom in on the screen for each part
of the machine
• The system can online be put on
and off
• System Settings can be adjust online
on distance
Alarm cause functionality visualisation
Current information
5. Configurations
Alarms History
• How often the is a failure?
• Reason for failure
• Which mechanic was there
• What is done to the system to solve
the problem
Alarm History
System specifications
5. Configurations
3. Registrations
• Types substations per plant
• Water quality
• Functionality, power consumption, faults and
maintenance
• Water level, motor currents, arrow water point
per pump
• History of functionality and maintenance
Engeldot-Water Control and Management System ( EWCM )
5. Configurations
Registrations
• The operation of the system
• Capacity of the system normally and
at peak times
• Information from disturbances or
flood flow
• the consumption of the system
Registration and visualization
5. Configurations
The operation of the system
• You can specify colours with which
information you want to be able to
see in the chart
• Each system is remotely adjustable
when there is a notice a serious
dysfunction
Registration and visualization
5. Configurations
Analytics of the system
• Deviations and peaks in the system
are easy to read out
• Every detail of the system can be
preceded by a separate colour
Registration and visualization
5. Configurations
4. Documents
• Manuals per system
• System Drawings
• Pictures installation and pumps
• Parts lists
• Electricity Plan
Engeldot-Water Control and Management System ( EWCM )
5. Configurations
Documents
• Manuals per system
• System Drawings
• Pictures installation and pumps
• Parts lists
• Electricity Plan
Document of the locations and the systems
Water flow diagrams
PFD drawings
5. Configurations
Documents
• Manuals per system
• System Drawings
• Pictures installation and pumps
• Parts lists
• Electricity Plan
Document of the locations and the systems
PFD drawings
P&ID System
5. Configurations
Documents
• Manuals per system
• System Drawings
• Pictures installation and pumps
• Parts lists
• Electricity Plan
Document of the locations and the systems
System manuals
Technical drawings
Technical specifications
Water flow drawings
Photo's the in
5. Configurations
Photo Documents
• Photo’s of the location
• Photo’s of the system
• Photo’s of the installation
• Photo’s of the pump
Photo document of the locations and the systems
Photo's the installation or location
5. Configurations
5. Configurations
• Users
• Maintenance Technicians
• Responsibilities & Privileges
Engeldot-Water Control and Management System ( EWCM )
5. Configurations
Configurations
• Users
• Maintenance Technicians
• Responsibilities & Privileges
The system can indicate which
employees can view or modify certain
information
Privileges & Responsibility
Privileges per employee
5. Configurations
Configurations
• Entering work timetable.
• Which employee is on duty or
take the service over
• What are the privileges of the
employee
• The responsible technician can
only view the systems where he
is responsible for
• Prevent that not specialized
employees can not work on
several systems
Privileges & Responsibility
Notification and priority
Status alarm message
5. Configurations
6. Services & Maintenance
• Relations & suppliers
• Parts specifications
• Work orders & Responsible persons
• Inspection results
• Overview active or dissolved disruptions
• Which activities are performed
• Archive, History and reporting
Engeldot-Water Control and Management System ( EWCM )
5. Configurations
Service maintenance
registration logbook
• The employee can add notes to
the system after implementation
work
• The manager can add notes to
the system for the respective
executive assistant
Service and maintenance logbook
Note of the status after system failure
Handing information colleague
5. Configurations
Relations
• All data from suppliers and
relationships can be displayed on
the system per location or
installation
Service & Maintenance
Data off suppliers and relations
5. ConfigurationsServices
• Relations & suppliers
• Parts specifications
• Work orders & Responsible
persons
• Inspection results
• Overview active or dissolved
disruptions
• Which activities are performed
• Archive, History and reporting
Service & Maintenance
5. Configurations
Technical Description System
• All technical information about the
or water treatment plant or pump
station can be found by the
employee in the system
• From suppliers to component
Service & Maintenance
5. Configurations
7. Analyses
• Detailed data analysis by system
• Reporting system operating hours,
functionalities, peaks and valleys
• Reporting and maintenance
• Functionality and energy consumption
Engeldot-Water Control and Management System ( EWCM )
5. Configurations
Analyses
Numerous analyses have
been read out from the
system
• Detailed data analysis by system
• Reporting system operating hours,
functionalities, peaks and valleys
• Reporting and maintenance
• Functionality and energy
consumption
• Comparisons of functionality of
different locations
Analyses & Reportings
Operation information of the machine
5. Configurations
Analyses
• Detailed data analysis by system
• Reporting system operating hours,
functionalities, peaks and valleys
• Reporting and maintenance
• Functionality and energy
consumption
Service & Maintenance
5. Configurations
8. Maintenance
• Notification required maintenance
• Report of executed maintenance
Engeldot-Water Control and Management System ( EWCM )
5. Configurations
Maintenance
• Notification required maintenance
• Report of executed maintenance
Inspection
Different repeated inspections to
do daily, weekly, monthly or
yearly
• Inspection of the location
• Inspection of the water treatment
pant
• Inspection of the installation
• Inspection of the system
• Inspection of the components
Maintenance & Inspections
Required maintenance
Report executed maintenance
Inspections overview lists
5. Configurations
Optional Water Quality monitoring included
Online- Offline Real-time
water quality monitoring up
to 14 parameters
Parameters
Online- Offline Real-time water quality
monitoring up to 14 parameters:
• Conductivity
• Turbidity
• Nitrate
• Nitrite
• Ammonium
• Free Chlorine
• Fluoride
• NHȝ-N
• Chloride
• Dissolved Oxygen
• Redox potential
• pH
• Temperature
• Biological Oxygen
Demand (BOD)
The following 14 parameters:
5. Configurations
Worldwide Monitoring & Control
General Management EWCM
Management Function
• Signalling alarm notification and
maintenance work
Multiple use and control
How to organise the implementation
of the system
• The finance of the implementation of the system
• The implementation and device of the software
• The responsibility of each organisation
• Mutual contract formation
• Performance of the Education program (how to manage en use the system)
Engeldot-Water
ICT
Government
Management &
Control
Maintenance &
Control
Engeldot-Water
Control
Systems
Maintenance &
Control
Local PT
Management &
Control System
Maintenance &
Control System
Device software system
Education maintenance
Education software system
Enter employees
Educate employees
Financed system
Annual Maintenance Contract
Contract to Local PT
Monthly maintenance contract
Thank you for your attention
Mr. Jochem van Engelenhoven
CEO
Buitenvaart 1015
7905 SB, Hoogeveen
The Netherlands
T: 0031 528 820 380
E: jochem.vanengelenhoven@engeldot-water.com
Mr. Robert Nemmers
Consultant Indonesia
Jl. Ars. Muhammad no. 11
Balikpapan 76112,
Indonesia
T: +62 81 52 03 73 025 / +62 81 28 01 18 34
E: robert.nemmers@engeldot-water.com

Más contenido relacionado

La actualidad más candente

process control system
process control systemprocess control system
process control systemSAHUKANCHAN
 
Machine monitoring system
Machine monitoring systemMachine monitoring system
Machine monitoring systemPrem Baboo
 
Master-trol | Electronic Water Management System
Master-trol | Electronic Water Management SystemMaster-trol | Electronic Water Management System
Master-trol | Electronic Water Management SystemMorris Group International
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practicesPrem Baboo
 
01 overview of_industrial_automation_sp15
01 overview of_industrial_automation_sp1501 overview of_industrial_automation_sp15
01 overview of_industrial_automation_sp15John Todora
 
Power plant control
Power plant controlPower plant control
Power plant controlRahul Kedia
 
Octavis Vibration Monitor Brochure
Octavis Vibration Monitor BrochureOctavis Vibration Monitor Brochure
Octavis Vibration Monitor Brochureifm electronic gmbh
 
Introduction to Digital Computer Control System
Introduction to Digital Computer Control SystemIntroduction to Digital Computer Control System
Introduction to Digital Computer Control Systemturna67
 
Control and instrumentation
Control and instrumentationControl and instrumentation
Control and instrumentationVSRAGHU
 
Task 1.3 – human machine interface (hmi) definition. (by graphitech)
Task 1.3 – human machine interface (hmi) definition. (by graphitech)Task 1.3 – human machine interface (hmi) definition. (by graphitech)
Task 1.3 – human machine interface (hmi) definition. (by graphitech)SLOPE Project
 
Programmable Logic Controller (PLC Part 2)
Programmable Logic Controller (PLC Part 2)Programmable Logic Controller (PLC Part 2)
Programmable Logic Controller (PLC Part 2)Priyanshu
 
L1 PLC SCADA Orientation
L1 PLC SCADA OrientationL1 PLC SCADA Orientation
L1 PLC SCADA OrientationRAJESH KUMAR
 
History of Automation and Process Introduction
History of Automation and Process IntroductionHistory of Automation and Process Introduction
History of Automation and Process IntroductionPranavAutomation
 
Distributed Control System
Distributed Control SystemDistributed Control System
Distributed Control System3abooodi
 
L2 Process Autoamtion Orientation
L2  Process Autoamtion OrientationL2  Process Autoamtion Orientation
L2 Process Autoamtion OrientationRAJESH KUMAR
 

La actualidad más candente (20)

process control system
process control systemprocess control system
process control system
 
DCS Introduction
DCS IntroductionDCS Introduction
DCS Introduction
 
Machine monitoring system
Machine monitoring systemMachine monitoring system
Machine monitoring system
 
Distributed Control System
Distributed Control SystemDistributed Control System
Distributed Control System
 
Master-trol | Electronic Water Management System
Master-trol | Electronic Water Management SystemMaster-trol | Electronic Water Management System
Master-trol | Electronic Water Management System
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practices
 
01 overview of_industrial_automation_sp15
01 overview of_industrial_automation_sp1501 overview of_industrial_automation_sp15
01 overview of_industrial_automation_sp15
 
Power plant control
Power plant controlPower plant control
Power plant control
 
Octavis Vibration Monitor Brochure
Octavis Vibration Monitor BrochureOctavis Vibration Monitor Brochure
Octavis Vibration Monitor Brochure
 
GTDS Booklet
GTDS BookletGTDS Booklet
GTDS Booklet
 
Introduction to Digital Computer Control System
Introduction to Digital Computer Control SystemIntroduction to Digital Computer Control System
Introduction to Digital Computer Control System
 
Control and instrumentation
Control and instrumentationControl and instrumentation
Control and instrumentation
 
Design Checklist_Electrical
Design Checklist_Electrical Design Checklist_Electrical
Design Checklist_Electrical
 
Task 1.3 – human machine interface (hmi) definition. (by graphitech)
Task 1.3 – human machine interface (hmi) definition. (by graphitech)Task 1.3 – human machine interface (hmi) definition. (by graphitech)
Task 1.3 – human machine interface (hmi) definition. (by graphitech)
 
DCS an overview
DCS an overviewDCS an overview
DCS an overview
 
Programmable Logic Controller (PLC Part 2)
Programmable Logic Controller (PLC Part 2)Programmable Logic Controller (PLC Part 2)
Programmable Logic Controller (PLC Part 2)
 
L1 PLC SCADA Orientation
L1 PLC SCADA OrientationL1 PLC SCADA Orientation
L1 PLC SCADA Orientation
 
History of Automation and Process Introduction
History of Automation and Process IntroductionHistory of Automation and Process Introduction
History of Automation and Process Introduction
 
Distributed Control System
Distributed Control SystemDistributed Control System
Distributed Control System
 
L2 Process Autoamtion Orientation
L2  Process Autoamtion OrientationL2  Process Autoamtion Orientation
L2 Process Autoamtion Orientation
 

Similar a Engeldot-Water's Online Management / Control / Maintenance of you Water Treatment Plant and more

Inst maint practices
Inst maint practicesInst maint practices
Inst maint practicesPrem Baboo
 
Intelligent instrumentation and power plant simulators
Intelligent instrumentation and power plant simulatorsIntelligent instrumentation and power plant simulators
Intelligent instrumentation and power plant simulatorsSelvam Sethurathinam
 
PlantConnect Presentation
PlantConnect PresentationPlantConnect Presentation
PlantConnect PresentationAkshay Tilak
 
Central maintenance system.pptx
Central maintenance system.pptxCentral maintenance system.pptx
Central maintenance system.pptxsharvani37
 
Lecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfLecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfSmritiGarg21
 
Network Implementation and Support Lesson 11 Server Performance - Eric Vand...
Network Implementation and Support Lesson 11   Server Performance - Eric Vand...Network Implementation and Support Lesson 11   Server Performance - Eric Vand...
Network Implementation and Support Lesson 11 Server Performance - Eric Vand...Eric Vanderburg
 
eStation Maintenance - Introduction.pptx.pdf
eStation Maintenance - Introduction.pptx.pdfeStation Maintenance - Introduction.pptx.pdf
eStation Maintenance - Introduction.pptx.pdfAhmedWasiu
 
Lecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptxLecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptxsurangagw
 
Smart Maintenance engineering
Smart Maintenance engineering Smart Maintenance engineering
Smart Maintenance engineering Michel Mafumba
 
CONDITION MONITORING
CONDITION MONITORINGCONDITION MONITORING
CONDITION MONITORINGlaxtwinsme
 
Distributed control system presentation
Distributed control system presentationDistributed control system presentation
Distributed control system presentationAYUSH VARSHNEY
 
Automation.pptx
Automation.pptxAutomation.pptx
Automation.pptxPradeepNB2
 
FAULT DETECTION AND DIAGNOSIS OF INDUCTION MACHINE WITH ON-LINE PARAMETER PR...
FAULT DETECTION AND DIAGNOSIS OF INDUCTION MACHINE  WITH ON-LINE PARAMETER PR...FAULT DETECTION AND DIAGNOSIS OF INDUCTION MACHINE  WITH ON-LINE PARAMETER PR...
FAULT DETECTION AND DIAGNOSIS OF INDUCTION MACHINE WITH ON-LINE PARAMETER PR...Sheikh R Manihar Ahmed
 
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...RekaNext Capital
 
SysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentationSysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentationRekaNext Capital
 
Điều khiển nhà máy thủy điện
Điều khiển nhà máy thủy điệnĐiều khiển nhà máy thủy điện
Điều khiển nhà máy thủy điệnTuan Anh
 

Similar a Engeldot-Water's Online Management / Control / Maintenance of you Water Treatment Plant and more (20)

Oil production3
Oil production3Oil production3
Oil production3
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practices
 
Intelligent instrumentation and power plant simulators
Intelligent instrumentation and power plant simulatorsIntelligent instrumentation and power plant simulators
Intelligent instrumentation and power plant simulators
 
PlantConnect Presentation
PlantConnect PresentationPlantConnect Presentation
PlantConnect Presentation
 
FMECA CocaCola Industry
FMECA CocaCola IndustryFMECA CocaCola Industry
FMECA CocaCola Industry
 
Automated Process control.ppt
Automated Process control.pptAutomated Process control.ppt
Automated Process control.ppt
 
Central maintenance system.pptx
Central maintenance system.pptxCentral maintenance system.pptx
Central maintenance system.pptx
 
Lecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfLecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdf
 
Network Implementation and Support Lesson 11 Server Performance - Eric Vand...
Network Implementation and Support Lesson 11   Server Performance - Eric Vand...Network Implementation and Support Lesson 11   Server Performance - Eric Vand...
Network Implementation and Support Lesson 11 Server Performance - Eric Vand...
 
eStation Maintenance - Introduction.pptx.pdf
eStation Maintenance - Introduction.pptx.pdfeStation Maintenance - Introduction.pptx.pdf
eStation Maintenance - Introduction.pptx.pdf
 
Lecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptxLecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptx
 
Smart Maintenance engineering
Smart Maintenance engineering Smart Maintenance engineering
Smart Maintenance engineering
 
CONDITION MONITORING
CONDITION MONITORINGCONDITION MONITORING
CONDITION MONITORING
 
Distributed control system presentation
Distributed control system presentationDistributed control system presentation
Distributed control system presentation
 
Automation.pptx
Automation.pptxAutomation.pptx
Automation.pptx
 
FAULT DETECTION AND DIAGNOSIS OF INDUCTION MACHINE WITH ON-LINE PARAMETER PR...
FAULT DETECTION AND DIAGNOSIS OF INDUCTION MACHINE  WITH ON-LINE PARAMETER PR...FAULT DETECTION AND DIAGNOSIS OF INDUCTION MACHINE  WITH ON-LINE PARAMETER PR...
FAULT DETECTION AND DIAGNOSIS OF INDUCTION MACHINE WITH ON-LINE PARAMETER PR...
 
Maintenance engineering- Unit- 3
Maintenance engineering- Unit- 3Maintenance engineering- Unit- 3
Maintenance engineering- Unit- 3
 
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
Real Time Water Quality Monitoring and Alert Systems, Applications using OPEX...
 
SysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentationSysEng Water India 2011 conference presentation
SysEng Water India 2011 conference presentation
 
Điều khiển nhà máy thủy điện
Điều khiển nhà máy thủy điệnĐiều khiển nhà máy thủy điện
Điều khiển nhà máy thủy điện
 

Último

Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackCloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackVICTOR MAESTRE RAMIREZ
 
Professional Resume Template for Software Developers
Professional Resume Template for Software DevelopersProfessional Resume Template for Software Developers
Professional Resume Template for Software DevelopersVinodh Ram
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样umasea
 
Intelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmIntelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmSujith Sukumaran
 
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...soniya singh
 
What is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWhat is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWave PLM
 
The Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdfThe Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdfPower Karaoke
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityNeo4j
 
Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)OPEN KNOWLEDGE GmbH
 
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...Christina Lin
 
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...gurkirankumar98700
 
why an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdfwhy an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdfjoe51371421
 
What is Binary Language? Computer Number Systems
What is Binary Language?  Computer Number SystemsWhat is Binary Language?  Computer Number Systems
What is Binary Language? Computer Number SystemsJheuzeDellosa
 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...MyIntelliSource, Inc.
 
The Essentials of Digital Experience Monitoring_ A Comprehensive Guide.pdf
The Essentials of Digital Experience Monitoring_ A Comprehensive Guide.pdfThe Essentials of Digital Experience Monitoring_ A Comprehensive Guide.pdf
The Essentials of Digital Experience Monitoring_ A Comprehensive Guide.pdfkalichargn70th171
 
Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantAxelRicardoTrocheRiq
 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...MyIntelliSource, Inc.
 
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer DataAdobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer DataBradBedford3
 

Último (20)

Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackCloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStack
 
Professional Resume Template for Software Developers
Professional Resume Template for Software DevelopersProfessional Resume Template for Software Developers
Professional Resume Template for Software Developers
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
 
Intelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmIntelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalm
 
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
 
What is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need ItWhat is Fashion PLM and Why Do You Need It
What is Fashion PLM and Why Do You Need It
 
The Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdfThe Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdf
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered Sustainability
 
Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)
 
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...Call Girls In Mukherjee Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
 
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
 
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝
 
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
(Genuine) Escort Service Lucknow | Starting ₹,5K To @25k with A/C 🧑🏽‍❤️‍🧑🏻 89...
 
why an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdfwhy an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdf
 
What is Binary Language? Computer Number Systems
What is Binary Language?  Computer Number SystemsWhat is Binary Language?  Computer Number Systems
What is Binary Language? Computer Number Systems
 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
 
The Essentials of Digital Experience Monitoring_ A Comprehensive Guide.pdf
The Essentials of Digital Experience Monitoring_ A Comprehensive Guide.pdfThe Essentials of Digital Experience Monitoring_ A Comprehensive Guide.pdf
The Essentials of Digital Experience Monitoring_ A Comprehensive Guide.pdf
 
Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service Consultant
 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
 
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer DataAdobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
 

Engeldot-Water's Online Management / Control / Maintenance of you Water Treatment Plant and more

  • 1. Engeldot-Water (CARS) Control and Management System EWCM
  • 2. EWCM Control / Overview Management Reports/ Analytics Alarm/ Damage Maintenance Data Back-up
  • 3. 5. Configurations 1. One Proven All – Inn General and Local Management system, total on-line overview of all your pump stations, water treatment plants, optional (flood control, gate valves) 2. On the map you are able to see and control and steer al the water pump and treatment locations 3. The system inform you when there is a technical problem, or when the system needs maintenance 4. Report the technical functionality of each water treatment plants 5. Steer and control your system in the management and user location 6. Registers the needs of maintenance, service and spare part management 7. Registers the capacity, water use, energy consumption and disruption off each pump and installation 8. Alerts you when here is damage on one of your systems. (can Alert you for leeks or troubles in the drinking water distribution systems) 9. Can be Registers your drinking water distribution and sewage Piping systems in the city (GIS) 10. Optional (plug-in other civil facilities to control like the streetlights, traffic lights in the city Introduction of the capabilities of the EWCM system
  • 5. 5. Configurations • Control of all your water systems and water treatment systems from one central point • Control of all maintenance from one organization • Quick insight into leaks or vandalism to the systems • Read-out of a numerous data information about the water quality and the power consumption • The functioning of the different systems can be compared • Ensure and report on safe and healthy water quality • Our system is durable, reliable and easy to use Why choose the Engeldot-Water Control and Management System
  • 6. 5. Configurations Introduction of the capabilities of the EWCM system 1 1. General Management EWCM EWCM Online Login Screen Geographic overview Visualisation Search by station Management Function Geo maps 2. Alarms Visualization alarm notification on map or list Alarm statistics Causes statistics Appointment of the cause of the alarm 3. Registrations Types substations per plant Water quality Functionality, power consumption, faults and maintenance Water level, motor currents, arrow water point per pump History of functionality and maintenance 4. Documents Manuals per system System Drawings Pictures installation and pumps Parts lists Electricity Plan
  • 7. 5. Configurations Introduction of the capabilities of the EWCM system 2 5. Configurations Users Maintenance Technicians Responsibilities 6. Services & Maintenance Relations & suppliers Parts specifications Work orders & Responsible persons Inspection results Overview active or dissolved disruptions Which activities are performed Archive, History and reporting 7. Analyses Detailed data analysis by system Reporting system operating hours, functionalities, peaks and valleys Reporting and maintenance 8. Maintenance Notification required maintenance Report of executed maintenance
  • 8. 5. Configurations 1. General Management EWCM • EWCM Online Login Screen • Geographic overview • Visualisation • Search by station • Management Function • Geo maps Engeldot-Water Control and Management System ( EWCM )
  • 9. General Management EWCM EWCM Online Login Screen • Log in with a user's own password • All credentials are registered for reporting • Each user has it's own access within the system • Each user has it's own power to adapt the system Geographic overview • Overview of all connected water treatment plants, pumping stations and pumping stations on an interactive map • Easy in and out zoom on the map to view a location • Up to date overview of alarm reporting faults or maintenance on one map • Pumping stations, treatment plants and pumping station have their own recognition on the map The Engeldot-Water EWCM system step by step Login Screen Geographic overview
  • 10. 5. Configurations The Engeldot-Water EWCM system step by step General Management EWCM Visualisation • All locations visible in one geographic map • Up to date overview of the state of all systems and pumping stations in one list • If necessary in case off emergency the machine can be turned off from a distance • You can see the responsible persons that are currently logged in to the system Search by station • Search by name or number of a particular data, person or installation Management Function Zoom in on location Own recognizance icon
  • 11. 5. Configurations Geographic overview of all locations Maintenance alarm Zoom in on location
  • 12. 5. Configurations Overview of all locations in one list Overview Notes of all systems
  • 13. 5. Configurations Online General management General Management EWCM Management Function • Signalling alarm notification and maintenance work • Add documents per plant (photos, manuals, system description • Ties notion adding to plants • Parts description (which parts are there in the system) • Creating Work Orders (which privileges have any employees)log Processing • Making maintenance History overviews and comparisons • Enter Work Orders • Job transfer letter for transfer to subsequent employee • Reports readout to detect anomalies in time and to rectify them Management Function
  • 14. 5. Configurations Online General management and privileges General Management and privileges Management privileges Managers privileges Maintenance privileges Mechanic employer privileges • The system can be arranged so that each completed controller has its own privileges to view or change information in the system Users privileges Technical information
  • 15. 5. Configurations Add Notes for particular employees General Management EWCM • Transfer or communication to colleagues • Add notes about observations of a system (what's going on or what needs to be done) • Write a message to certain employees • Add a note to particular system or pumping station Add Note’s Everywhere online login
  • 16. 5. Configurations Add Document to each System of Pump station General Management EWCM Management Function • Signalling alarm notification and maintenance work • Understanding the system description • Can act quickly to resolve interference • The responsible engineer automatically notifies the fault • From the central control room the execution of maintenance and malfunctions are easily to keep an eye on the performance Add documents Type off pump System drowings
  • 17. 5. Configurations Geo Maps Overview of all installations, pumps and water treatment plants. • Overview off the require maintenance of all systems • Overview of the pipework's, pipelines • Overview off all water meters per household or business • Direct insight which employee working on any location or system The coloured balls give instant overview of the attention that the system needs 1. Red is urgent 2. Blue needs to be looked at 3. Green is ok The status of the report can be followed from a central point. 1. Witch employ is on duty 2. When the error is solved Geo maps overview of all systems
  • 18. 5. Configurations Geo maps overview of piping en water meters Geo Maps Overview of the pipework, pipelines. • Quick insight on leaks or vandalism • In one list the total view of all reports of the required attention by system Pipelines Water meters
  • 19. 5. Configurations 2. Alarms • Visualization alarm notification on map or list • Alarm statistics • Causes statistics • Appointment of the cause of the alarm • History of the alarms Engeldot-Water Control and Management System ( EWCM )
  • 20. 5. Configurations Alarms • Visualization alarm notification on map or list • Alarm statistics • Causes statistics • Appointment of the cause of the alarm • Automatically alert mechanic Alarms alert, description and cause Total overview Solved Current faults Reporting disturbances
  • 21. 5. Configurations Alarm statistics • Visualization on statistic list • Alarm status • Causes of the alarm • Notification to mechanic • Duration of the alarm • Actual or solved • History of the alarms Alarm statistics per system Reports of failures, leaks, improper functioning and water quality • See which faults are open or resolved • View of the failure details • Insight into the system to see in actual turning of the plant or pump • To which employee the failure is reported • viewing the history of a failure Overview statistic of al the stations Alarm information
  • 22. 5. Configurations Alarms cause • Visualization alarm notification on map or list • Alarm statistics • Causes statistics • Appointment of the cause of the alarm Alarm statistics • How often there is a failure at that location • How often the fault alarm • The failures are being reported • For which reason the interference performs Alarm cause en statistics per system Current information
  • 23. 5. Configurations Current information • Running machine online live insight • Zoom in on the screen for each part of the machine • The system can online be put on and off • System Settings can be adjust online on distance Alarm cause functionality visualisation Current information
  • 24. 5. Configurations Alarms History • How often the is a failure? • Reason for failure • Which mechanic was there • What is done to the system to solve the problem Alarm History System specifications
  • 25. 5. Configurations 3. Registrations • Types substations per plant • Water quality • Functionality, power consumption, faults and maintenance • Water level, motor currents, arrow water point per pump • History of functionality and maintenance Engeldot-Water Control and Management System ( EWCM )
  • 26. 5. Configurations Registrations • The operation of the system • Capacity of the system normally and at peak times • Information from disturbances or flood flow • the consumption of the system Registration and visualization
  • 27. 5. Configurations The operation of the system • You can specify colours with which information you want to be able to see in the chart • Each system is remotely adjustable when there is a notice a serious dysfunction Registration and visualization
  • 28. 5. Configurations Analytics of the system • Deviations and peaks in the system are easy to read out • Every detail of the system can be preceded by a separate colour Registration and visualization
  • 29. 5. Configurations 4. Documents • Manuals per system • System Drawings • Pictures installation and pumps • Parts lists • Electricity Plan Engeldot-Water Control and Management System ( EWCM )
  • 30. 5. Configurations Documents • Manuals per system • System Drawings • Pictures installation and pumps • Parts lists • Electricity Plan Document of the locations and the systems Water flow diagrams PFD drawings
  • 31. 5. Configurations Documents • Manuals per system • System Drawings • Pictures installation and pumps • Parts lists • Electricity Plan Document of the locations and the systems PFD drawings P&ID System
  • 32. 5. Configurations Documents • Manuals per system • System Drawings • Pictures installation and pumps • Parts lists • Electricity Plan Document of the locations and the systems System manuals Technical drawings Technical specifications Water flow drawings Photo's the in
  • 33. 5. Configurations Photo Documents • Photo’s of the location • Photo’s of the system • Photo’s of the installation • Photo’s of the pump Photo document of the locations and the systems Photo's the installation or location
  • 34. 5. Configurations 5. Configurations • Users • Maintenance Technicians • Responsibilities & Privileges Engeldot-Water Control and Management System ( EWCM )
  • 35. 5. Configurations Configurations • Users • Maintenance Technicians • Responsibilities & Privileges The system can indicate which employees can view or modify certain information Privileges & Responsibility Privileges per employee
  • 36. 5. Configurations Configurations • Entering work timetable. • Which employee is on duty or take the service over • What are the privileges of the employee • The responsible technician can only view the systems where he is responsible for • Prevent that not specialized employees can not work on several systems Privileges & Responsibility Notification and priority Status alarm message
  • 37. 5. Configurations 6. Services & Maintenance • Relations & suppliers • Parts specifications • Work orders & Responsible persons • Inspection results • Overview active or dissolved disruptions • Which activities are performed • Archive, History and reporting Engeldot-Water Control and Management System ( EWCM )
  • 38. 5. Configurations Service maintenance registration logbook • The employee can add notes to the system after implementation work • The manager can add notes to the system for the respective executive assistant Service and maintenance logbook Note of the status after system failure Handing information colleague
  • 39. 5. Configurations Relations • All data from suppliers and relationships can be displayed on the system per location or installation Service & Maintenance Data off suppliers and relations
  • 40. 5. ConfigurationsServices • Relations & suppliers • Parts specifications • Work orders & Responsible persons • Inspection results • Overview active or dissolved disruptions • Which activities are performed • Archive, History and reporting Service & Maintenance
  • 41. 5. Configurations Technical Description System • All technical information about the or water treatment plant or pump station can be found by the employee in the system • From suppliers to component Service & Maintenance
  • 42. 5. Configurations 7. Analyses • Detailed data analysis by system • Reporting system operating hours, functionalities, peaks and valleys • Reporting and maintenance • Functionality and energy consumption Engeldot-Water Control and Management System ( EWCM )
  • 43. 5. Configurations Analyses Numerous analyses have been read out from the system • Detailed data analysis by system • Reporting system operating hours, functionalities, peaks and valleys • Reporting and maintenance • Functionality and energy consumption • Comparisons of functionality of different locations Analyses & Reportings Operation information of the machine
  • 44. 5. Configurations Analyses • Detailed data analysis by system • Reporting system operating hours, functionalities, peaks and valleys • Reporting and maintenance • Functionality and energy consumption Service & Maintenance
  • 45. 5. Configurations 8. Maintenance • Notification required maintenance • Report of executed maintenance Engeldot-Water Control and Management System ( EWCM )
  • 46. 5. Configurations Maintenance • Notification required maintenance • Report of executed maintenance Inspection Different repeated inspections to do daily, weekly, monthly or yearly • Inspection of the location • Inspection of the water treatment pant • Inspection of the installation • Inspection of the system • Inspection of the components Maintenance & Inspections Required maintenance Report executed maintenance Inspections overview lists
  • 47. 5. Configurations Optional Water Quality monitoring included Online- Offline Real-time water quality monitoring up to 14 parameters Parameters Online- Offline Real-time water quality monitoring up to 14 parameters: • Conductivity • Turbidity • Nitrate • Nitrite • Ammonium • Free Chlorine • Fluoride • NHȝ-N • Chloride • Dissolved Oxygen • Redox potential • pH • Temperature • Biological Oxygen Demand (BOD) The following 14 parameters:
  • 48. 5. Configurations Worldwide Monitoring & Control General Management EWCM Management Function • Signalling alarm notification and maintenance work Multiple use and control
  • 49. How to organise the implementation of the system • The finance of the implementation of the system • The implementation and device of the software • The responsibility of each organisation • Mutual contract formation • Performance of the Education program (how to manage en use the system) Engeldot-Water ICT Government Management & Control Maintenance & Control Engeldot-Water Control Systems Maintenance & Control Local PT Management & Control System Maintenance & Control System Device software system Education maintenance Education software system Enter employees Educate employees Financed system Annual Maintenance Contract Contract to Local PT Monthly maintenance contract
  • 50. Thank you for your attention Mr. Jochem van Engelenhoven CEO Buitenvaart 1015 7905 SB, Hoogeveen The Netherlands T: 0031 528 820 380 E: jochem.vanengelenhoven@engeldot-water.com Mr. Robert Nemmers Consultant Indonesia Jl. Ars. Muhammad no. 11 Balikpapan 76112, Indonesia T: +62 81 52 03 73 025 / +62 81 28 01 18 34 E: robert.nemmers@engeldot-water.com