The Goon SquadThe Goon Squad::
Beltus Mbeh-Beltus Mbeh- ConstructionConstruction
and Design Engineeringand Design Engineering
Pat Matheny-Pat Matheny- Power PlantPower Plant
and Habitat Architectand Habitat Architect
Steven Fields-Steven Fields- MissionMission
Planning and AgriculturePlanning and Agriculture
Get Your Ass to Mars ProjectGet Your Ass to Mars Project
2
Mission Overview
 Why we started with Mars
 Comparing our world to Mars
 Our vision for Martian
settlement
 Resources to build a new home
3
1. Water for Food
2. Carbon for Food
3. Nutrients for Food
Why should we start with MARS?
4
Comparing our World to the
Next…
MARS EARTH
Dist. To Sun 225 Million KM 150 Million KM
Diameter 6,786 KM 12,756 KM
Tilt of Axis 25 Degrees 23.5 Degrees
Length of Year 687 Earth days 365.25 days
Length of Day 24h 37m 24h
Gravity 3/8 G 1 G
Temp Range -127C to 17C -88C to 58C
Atmospheric
Pressure
7mb (Average) 1,013mb (Average)
Atmosphere Gases 95% CO2 78% N2, 21% O2
# of Moons 2 (Phobos & Deimos) 1 (Luna or Moon)
Polar Caps Water Ice & Dry Ice Water Ice
Highest Point Olympus Mons Mt Everest
Lowest Point Hellas Basin Marianas Trench
5
Settlement Construction StagingSettlement Construction Staging
PlanPlan
Phase1Phase1
• Completely Robotic, No humans on site.
• Timeframe: First 2 years.
• Objectives: Deploy first nuke, well drilling equipment, and gas plant to
establish water well and initial gas reserve.
Phase 2Phase 2
• 4 People on Site
• Timeframe: Second 2 years.
• Objectives: Deploy and setup mining / refining / manufacturing
equipment.
• MRM production runs. Produce material needed for settlement
construction.
Phase 3Phase 3
• 8 People on Site
• Timeframe: Third 2 years.
• Objectives: Continued MRM as needed. Settlement shell
construction. No settlement electrical loads yet. Construct
shell around agriculture, manufacturing & nuke BOPs.
Phase 4Phase 4
• 12 People on Site
• Timeframe: Fourth 2 years.
• Objectives: Finalized settlement construction. Commissioning. All
settlement loads coming online.
6
Selected
Location:
Candor Chasma
Valles Marineris
69.95W x 6.36S x -4.4km
7
Possible
locations for
landing zones
that don’t
overfly the
settlement
Settlement
Location
8
Temporary HabitatsTemporary Habitats
9
10
11
Lower Level
12
Upper Level
13
100m
First Permanent Settlement for 12First Permanent Settlement for 12
PeoplePeople
Build Phase 1Build Phase 1
14
100m
Settlement Expansion to 36 PeopleSettlement Expansion to 36 People
Build Phase 2Build Phase 2
Build Phase 3Build Phase 3
15
1. What do we have to work with?
2. What do we bring from Earth?
3. Local Resources (Atmosphere,
Water & Soil)
Resources to build a new
home
16
Resources we bring fromResources we bring from
EarthEarth
 Robots & automation systems
 People
– Temp. living quarters
– Life Support & dry food
 Power System
– Nuclear Reactors
– Backup solar
 Construction Equipment
– Mining & Excavation
– Refining Equipment
– Manufacturing Equipment
 Other high-tech/low mass/or items to manufacture
items
 Equipment & material scavenged from Descent
Craft & Control systems, wiring, actuators,
sensors, metal, parachutes, etc.
250 metric tons of
Cargo/Habitat/People
17
Conclusion

Más contenido relacionado

Similar a MARS final project

Levon Resources (TSX: LVN) Published a Mexico Silver-Gold-Base Metals Project...
Levon Resources (TSX: LVN) Published a Mexico Silver-Gold-Base Metals Project...Levon Resources (TSX: LVN) Published a Mexico Silver-Gold-Base Metals Project...
Levon Resources (TSX: LVN) Published a Mexico Silver-Gold-Base Metals Project...Resource Clips
 
Lunar-Underground-Mining-and-Construction-A-Terrestrial-Vision-Enabling-Space...
Lunar-Underground-Mining-and-Construction-A-Terrestrial-Vision-Enabling-Space...Lunar-Underground-Mining-and-Construction-A-Terrestrial-Vision-Enabling-Space...
Lunar-Underground-Mining-and-Construction-A-Terrestrial-Vision-Enabling-Space...Louis Grenier
 
Basics of openpit mining
Basics of openpit miningBasics of openpit mining
Basics of openpit miningSATYANARAYANA I
 
MIGPLC PROFILE(EN)(P2)
MIGPLC PROFILE(EN)(P2)MIGPLC PROFILE(EN)(P2)
MIGPLC PROFILE(EN)(P2)GIANG PHAM
 
Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled Lovemore Freddie Mauled (Geologist)
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010PENTA
 
Chromite Presentation Global Chrome Ore Forum April 2011, Dubai UAE
Chromite Presentation Global Chrome Ore Forum April 2011, Dubai UAEChromite Presentation Global Chrome Ore Forum April 2011, Dubai UAE
Chromite Presentation Global Chrome Ore Forum April 2011, Dubai UAEAdnet Communications
 
14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit 14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit Juan Carlos Bonapace
 
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaajha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaasaifuddinkhan34
 
Salazar Resources Corporate Presentation 2017
Salazar Resources Corporate Presentation 2017Salazar Resources Corporate Presentation 2017
Salazar Resources Corporate Presentation 2017Freddy Salazar
 
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaMonitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaGlobal CCS Institute
 
Michael bowen oil and gas | Oil and Gas investments providing
Michael bowen oil and gas | Oil and Gas investments providing Michael bowen oil and gas | Oil and Gas investments providing
Michael bowen oil and gas | Oil and Gas investments providing Michael Bowen oil and gas
 
Deep South Resources Presentation September 2017
Deep South Resources Presentation September 2017Deep South Resources Presentation September 2017
Deep South Resources Presentation September 2017MomentumPR
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningJasmeet Singh Saluja
 
4- Geophysics and exploration
4- Geophysics and exploration4- Geophysics and exploration
4- Geophysics and explorationElsayed Amer
 
Liz Gray, Atkins
Liz Gray, Atkins   Liz Gray, Atkins
Liz Gray, Atkins IES / IAQM
 
SPACE DEBRIS PALAT PARLAM no authors
SPACE DEBRIS PALAT PARLAM no authorsSPACE DEBRIS PALAT PARLAM no authors
SPACE DEBRIS PALAT PARLAM no authorsMARIUS EUGEN OPRAN
 

Similar a MARS final project (20)

Levon Resources (TSX: LVN) Published a Mexico Silver-Gold-Base Metals Project...
Levon Resources (TSX: LVN) Published a Mexico Silver-Gold-Base Metals Project...Levon Resources (TSX: LVN) Published a Mexico Silver-Gold-Base Metals Project...
Levon Resources (TSX: LVN) Published a Mexico Silver-Gold-Base Metals Project...
 
Lunar-Underground-Mining-and-Construction-A-Terrestrial-Vision-Enabling-Space...
Lunar-Underground-Mining-and-Construction-A-Terrestrial-Vision-Enabling-Space...Lunar-Underground-Mining-and-Construction-A-Terrestrial-Vision-Enabling-Space...
Lunar-Underground-Mining-and-Construction-A-Terrestrial-Vision-Enabling-Space...
 
Basics of openpit mining
Basics of openpit miningBasics of openpit mining
Basics of openpit mining
 
MIGPLC PROFILE(EN)(P2)
MIGPLC PROFILE(EN)(P2)MIGPLC PROFILE(EN)(P2)
MIGPLC PROFILE(EN)(P2)
 
Orbital Debris Mapping
Orbital Debris MappingOrbital Debris Mapping
Orbital Debris Mapping
 
Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled Copper Exploration project Seeks Investor......by Lovemore Mauled
Copper Exploration project Seeks Investor......by Lovemore Mauled
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010
 
Chromite Presentation Global Chrome Ore Forum April 2011, Dubai UAE
Chromite Presentation Global Chrome Ore Forum April 2011, Dubai UAEChromite Presentation Global Chrome Ore Forum April 2011, Dubai UAE
Chromite Presentation Global Chrome Ore Forum April 2011, Dubai UAE
 
14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit 14 aneu applications of technological & engineering solutions edit
14 aneu applications of technological & engineering solutions edit
 
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaajha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Salazar Resources Corporate Presentation 2017
Salazar Resources Corporate Presentation 2017Salazar Resources Corporate Presentation 2017
Salazar Resources Corporate Presentation 2017
 
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaMonitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
 
Michael bowen oil and gas | Oil and Gas investments providing
Michael bowen oil and gas | Oil and Gas investments providing Michael bowen oil and gas | Oil and Gas investments providing
Michael bowen oil and gas | Oil and Gas investments providing
 
Deep South Resources Presentation September 2017
Deep South Resources Presentation September 2017Deep South Resources Presentation September 2017
Deep South Resources Presentation September 2017
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine Planning
 
4- Geophysics and exploration
4- Geophysics and exploration4- Geophysics and exploration
4- Geophysics and exploration
 
Liz Gray, Atkins
Liz Gray, Atkins   Liz Gray, Atkins
Liz Gray, Atkins
 
TT_Introduction6
TT_Introduction6TT_Introduction6
TT_Introduction6
 
SPACE DEBRIS PALAT PARLAM no authors
SPACE DEBRIS PALAT PARLAM no authorsSPACE DEBRIS PALAT PARLAM no authors
SPACE DEBRIS PALAT PARLAM no authors
 
Aa ggold presentation 10 4-10
Aa ggold presentation 10 4-10Aa ggold presentation 10 4-10
Aa ggold presentation 10 4-10
 

MARS final project

  • 1. 1 The Goon SquadThe Goon Squad:: Beltus Mbeh-Beltus Mbeh- ConstructionConstruction and Design Engineeringand Design Engineering Pat Matheny-Pat Matheny- Power PlantPower Plant and Habitat Architectand Habitat Architect Steven Fields-Steven Fields- MissionMission Planning and AgriculturePlanning and Agriculture Get Your Ass to Mars ProjectGet Your Ass to Mars Project
  • 2. 2 Mission Overview  Why we started with Mars  Comparing our world to Mars  Our vision for Martian settlement  Resources to build a new home
  • 3. 3 1. Water for Food 2. Carbon for Food 3. Nutrients for Food Why should we start with MARS?
  • 4. 4 Comparing our World to the Next… MARS EARTH Dist. To Sun 225 Million KM 150 Million KM Diameter 6,786 KM 12,756 KM Tilt of Axis 25 Degrees 23.5 Degrees Length of Year 687 Earth days 365.25 days Length of Day 24h 37m 24h Gravity 3/8 G 1 G Temp Range -127C to 17C -88C to 58C Atmospheric Pressure 7mb (Average) 1,013mb (Average) Atmosphere Gases 95% CO2 78% N2, 21% O2 # of Moons 2 (Phobos & Deimos) 1 (Luna or Moon) Polar Caps Water Ice & Dry Ice Water Ice Highest Point Olympus Mons Mt Everest Lowest Point Hellas Basin Marianas Trench
  • 5. 5 Settlement Construction StagingSettlement Construction Staging PlanPlan Phase1Phase1 • Completely Robotic, No humans on site. • Timeframe: First 2 years. • Objectives: Deploy first nuke, well drilling equipment, and gas plant to establish water well and initial gas reserve. Phase 2Phase 2 • 4 People on Site • Timeframe: Second 2 years. • Objectives: Deploy and setup mining / refining / manufacturing equipment. • MRM production runs. Produce material needed for settlement construction. Phase 3Phase 3 • 8 People on Site • Timeframe: Third 2 years. • Objectives: Continued MRM as needed. Settlement shell construction. No settlement electrical loads yet. Construct shell around agriculture, manufacturing & nuke BOPs. Phase 4Phase 4 • 12 People on Site • Timeframe: Fourth 2 years. • Objectives: Finalized settlement construction. Commissioning. All settlement loads coming online.
  • 7. 7 Possible locations for landing zones that don’t overfly the settlement Settlement Location
  • 9. 9
  • 10. 10
  • 13. 13 100m First Permanent Settlement for 12First Permanent Settlement for 12 PeoplePeople Build Phase 1Build Phase 1
  • 14. 14 100m Settlement Expansion to 36 PeopleSettlement Expansion to 36 People Build Phase 2Build Phase 2 Build Phase 3Build Phase 3
  • 15. 15 1. What do we have to work with? 2. What do we bring from Earth? 3. Local Resources (Atmosphere, Water & Soil) Resources to build a new home
  • 16. 16 Resources we bring fromResources we bring from EarthEarth  Robots & automation systems  People – Temp. living quarters – Life Support & dry food  Power System – Nuclear Reactors – Backup solar  Construction Equipment – Mining & Excavation – Refining Equipment – Manufacturing Equipment  Other high-tech/low mass/or items to manufacture items  Equipment & material scavenged from Descent Craft & Control systems, wiring, actuators, sensors, metal, parachutes, etc. 250 metric tons of Cargo/Habitat/People