LEAN
MANAGEMENT
- Anand Narayan Shukla
Store Photo & Team photo
HELIOS SEC 18 GLADIATORS
WEEK-WISE 5 S SCORE TREND
77%
84%
82%
88%
92%
65%
70%
75%
80%
85%
90%
95%
3rd Oct13 20th Oct13 10th Nov13 24th Nov13 8th Dec13
5S Audit score
TEAM DOING 5 S
KAIZENS
Store: Sector 18 Helios (HNOI) KAIZEN:1 (House keeping material)
Before: racks spaces were going wasted
After: adjusted all the pantry and house
keeping materials in the racks
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 2 (CHS drawer)
Before: CHS’s drawer was not neat and
clean
After: cleaned it and removed all
unwanted items
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 3 (Power room)
Before: Power room was not neat
After: cleaned it and removed all
unwanted items
Before After
Store: Sector 18 Helios (HNOI) KAIZEN:4 (Service center)
Before After
Before: Service room was not neat
After: cleaned it and removed all
unwanted items
Store: Sector 18 Helios (HNOI) KAIZEN:5 (Cash Counter)
Before After
Before: monitor was on the right side of
the table which was inconvenient to
operate PC
After: Vault shifted to right and monitor
shifted to left and leg space made
available for convince
Store: Sector 18 Helios (HNOI) KAIZEN: 6 (Cash Counter)
Before: cash counter was a mess and
was not neat
After: rearranged all the items and
removed unwanted items
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 7 (Cash Til)
Before: cash counter not neat and there
were no partition in it
After: removed all the unwanted items,
made partitions for cash and created a
shadow board for all the materials
required for billing
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 8 (Leg space at the cash)
counter)
Before: leg space at the cash counter
was not clear as many wires were
coming out
After: adjusted a white board to block
all the wires from coming out
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 9 (Cupboards and)
drawers)
Before: none of the drawer/ gate was
labelled
After: each and every gate and drawer
got a number (lable)
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 10 (Power room )
Before: none of the switches were
labelled
After: all the switches are labelled
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 11 (Power room)
Before After
Before: none of the switches were
labelled
After: all the switches are labelled
Store: Sector 18 Helios (HNOI) KAIZEN: 12 (Wires)
Before After
Before: none of the plugs were labelled After: all the plugs are labelled
Store: Sector 18 Helios (HNOI) KAIZEN: 13 (Indexes)
Before: there were no indexes/ item list
inside the drawers
After: pasted indexes inside all the
drawers reflecting the items inside it
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 14 (Files and folders)
Before: registers and files were not
arranged properly
After: all the files got a number and
arranged properly
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 15 (Water dispenser)
Before: there were no markings on the
water dispenser for Hot and Cool water
After: water dispenser is labelled for Hot
and Cool water
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 16 (Stationary)
Before: Stationary items were not
arranged neatly
After: all the stationary items are
arranged neatly with a dividing line (red)
for defining spaces
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 17 (Stationary)
Before After
Before: Stationary items were not
arranged neatly
After: all the stationary items are
arranged neatly with a dividing line (red)
for defining spaces
Store: Sector 18 Helios (HNOI) KAIZEN: 18 (Key Hook)
Before: there was no key hanging hooks
Afters: created a hook for keys using
unused C-clamps
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 19 (Pantry)
Before: Pantry was not neat and clean
After: cleared unwanted stuff and
cleaned the pantry
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 20 (Store layout)
Before: there was no layout of the store
available to locate a particular drawer
After: took the printout of the layout
and marked each and every drawer on it
to simplify the search
Before After
Store: Sector 18 Helios (HNOI) KAIZEN:21 (Store layout)
Before After
Before: there was no layout of the store
available to locate a particular drawer
After: took the printout of the layout
and marked each and every drawer on it
to simplify the search
Store: Sector 18 Helios (HNOI) KAIZEN: 22 (Store layout)
Before After
Before: there was no layout of the store
available to locate a particular drawer
After: took the printout of the layout
and marked each and every drawer on it
to simplify the search
Store: Sector 18 Helios (HNOI) KAIZEN: 23 (Lean File)
Before: there was no separate file for
Lean retailing
After: Created a special file for
documenting Lean retailing at HNOI
(Noida Helios store)
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 24 (Stairs)
Before: There were no markings at the
stairs
After: every step of the stair is marked
with yellow tape
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 25 (Charts and graphs)
Before: didn’t have enough space for
putting lean and store metrics graphs
After: used pantry cabin gates as white
boards and pasted graphs on it
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 26 (Door mat)
Before: Door mat was torn off from the
corners and store was planning to buy a
new one
After: removed all the corners and made
it as good as new
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 27 (Pantry)
Before: Water dispenser was creating a
space issue in the pantry
After: shifted the dispenser, now pantry
looks spacious
Before After
Store: Sector 18 Helios (HNOI) KAIZEN: 28 (Pre Stamped Invoices)
Before After
Before : We were doing the
stamping after the billing
process done it takes some
extra time
After : Now pre stamp billing
stationary saves some time during
billing process
Store: Sector 18 Helios (HNOI) KAIZEN: 29 (Pre Stamped encircle cards)
Before After
After : Pre-Stamp Encircle Card
Saves times in Billing Process
Before: We do stamping after
billing
Store: Sector 18 Helios (HNOI) KAIZEN: 30 (Hooks for hanging Cloths)
Before After
After: Now we have put Cloth
hangers behind the pantry door it is
now convenient for employees.
Before: There were no place where
employee can hang their cloths
Store: Sector 18 Helios (HNOI) KAIZEN: 31 (Space for carry bags)
Before After
After: Now we have put all the carry
bags in 2 separate bins with the
demarcation and use other bin
option
Before: Carry bags were all together,
so it was difficult to identify the qty
left
Store: Sector 18 Helios (HNOI) KAIZEN: 32 (Space for Trays)
Before After
After: Now we are keeping all the
Tray at a one place keeping mind so
that it will not lying here and there.
Before: Earlier Trays were lying here
and there.
Store: Sector 18 Helios (HNOI) KAIZEN: 33 (Labeled key hooks)
Before After
After: Now We put all store related
keys at the respective demarked
place
Before: Earlier the all keys were lying
at the counter.
Store: Sector 18 Helios (HNOI) KAIZEN: 34 (Details of nearby ATMs)
Before After
After: Now we can suggest those
customers where the ATM is
situated
Before: when swiping/EDC machine
don’t works/ links down/Terminal ID
fail/Decline then the chances are
that customer may not comes back
and also we don’t know the ATM
address.
Store: Sector 18 Helios (HNOI) KAIZEN: 35 (Shortcut keys for faster billing)
Before After
After: we have derived shot cut to
billing so that the entire process gets
easier.
Before: it takes 10-12 minutes for
bills invoices and customer get
irritated because of this.
Store: Sector 18 Helios (HNOI) KAIZEN: 36 (Store Index)
Before After
After: Store index is added to both
the floors indicating which item is
kept where
Before: it was tough for staff or any
new comer to identify which item is
kept where
Store: Sector 18 Helios (HNOI) KAIZEN: 37 (Numbering on every file)
Before After
After: Numbering on every file has
been done for identification and
setting
Before: it was tough for staff to
maintain files at one place in an
organized manner
Store: Sector 18 Helios (HNOI) KAIZEN: 38 Lock for meter box
Before After
Before: Helios’s meter box was
open
After: applied lock at the gate so
that no one else can open it
Store: Sector 18 Helios (HNOI) KAIZEN: 39 Hook for hanging Shutter lifter
Before After
Before: there was no space for
keeping shutter opener
After: designated a space and
applied a hook inside the meter box
where it is safe as meter box has a
lock now
Store: Sector 18 Helios (HNOI) KAIZEN: 40 Pre-stamped warranty cards
Before After
Before: warranty cards were
not pre stamped, stamping
these cards at the time of
billing was taking few seconds
After: 3 warranty cards of every
brand are pre stamped during idle
time for speeding up the billing
process
Store: Sector 18 Helios (HNOI) KAIZEN: 41 Carry bags kept near to the cash counter
Before After
Before: carry bags were kept
away from the cash counter,
resulted in delay in billing
After: 20 carry bags are kept at the
counter for faster billing
Store: Sector 18 Helios (HNOI) KAIZEN: 42 (using tab for communicating offers)
Before After
Before: apart from tent cards
didn’t have anything else for
communicating offers inside
the store
After: Now communicating offers
inside the store using tab
Store: Sector 18 Helios (HNOI) KAIZEN: 43 (Lean Billing)
Before After
Before: Billing used to take
huge amount of time
After: With the help of lean and
KAIZEN billing time reduced
drastically
Scenario Without
Lean/KAIZEN
Billing with 1
CRO
14.5 min
Billing with 2
CROs
9.2 min
Scenario With
Lean/KAIZE
N
Time
saved
Billing with
1 CRO
9.2 min 5.3min
Billing with
2 CROs
4.5 min 4.7 min
Store: Sector 18 Helios (HNOI) KAIZEN: 44 (Easy identification of old stock)
Before After
Before: It was quite impossible
for Staff to identify old variants
in the stock and apply FIFO
After: White tags for watches more
than 90 days old (so that CRO can
easily apply FIFO on the variants in
every brand )
Store: Sector 18 Helios (HNOI) KAIZEN: 45 (Visual representation for watch box management)
Before After
Before: No properly managed
watch boxes
After: visual representation has
been given to the watch boxes for
easy replenishment
TOTAL NUMBER OF KAIZENS DONE &
RECORDED: 45
BEST KAIZENS
KAIZEN 1 : LEAN BILLING
CUSTOMER FINALIZES THE
WATCH TO BE BILLED
CUSTOMER GIVES HIS
FEEDBACK AND DETAILS IN
THE FEEDBACK BOOK
CRO STARTS BILLING ON ETP
ONCE HE RECEIVES DATA
FROM THE FEED BACK BOOK
OR HE ASKS FOR DATA AGAIN
CRO SETS THE WATCH AND
WILL SHOW IT TO THE
CUSTOMER
CRO PACKS THE WATCH AND
WILL HAND IT OVER TO THE
CUSTOMER IN HELIOS CARRY
BAG
(GIFT WRAP IT IF REQUIRED)
CRO 2 (HANLDING THE
CUSTOMER) WILL HANDOVER
CUSTOMER FEED BACK BOOK
TO THE CUSTOMER
CRO 1 WILL START BILLING ON
ETP
CRO 2 SETS THE WATCH AND
WILL SHOW IT TO THE
CUSTOMER (WHILE CRO1 IS
DOING BILLNG)
CRO 2 PACKS THE WATCH AND
WILL HAND IT OVER TO THE
CUSTOMER IN HELIOS CARRY
BAG
(GIFT WRAP IT IF REQUIRED)
SCENARIO 1:
ONE CRO, FOR BILLING
AND PACKING OF WATCH
SCENARIO 2:
TWO CROs, ONE FOR
BILLING AND ONE FOR
PACKING OF WATCH
ALL STEPS ARE BEING FOLLOWED PARALLELLY
OLD BILLING PROCESS FLOW - SNAPSHOT
AFTER GENERATING
BILL (HARD COPY)
AFTER CLEARING DOUBTS OF THE
CUSTOMER (IF HE/SHE HAS ANY)
Time taken:
870s = 14.5 m
Time taken:
550s = 9.2 m
Duplicate
data
• Customer’s
name
• Mob. No.
• Email ID
Customer fills feed back form
CRO asks for customer’s name/ mobile no./ email id
for billing (duplicity in taking customer’s data)
CRO will do the system billing (including UPL enrolment)
Bill gets printed
CRO sets watch and
shows it to the customer
CRO bring the watch box, takes
out the warranty card and puts stamp on it
CRO Gift wraps the watch
(if customer asks for it)
Handover the watch to the customer in a carry bag
CUSTOMER IS READY FOR BILLING
180 s
120s
90 s
10 s 30 s 180 s
240 s
20 s
Total time taken just for handing over the
watch to the customer
870 sec = 14.5 min
HOW FAST BILLING SHOULD
HAPPEN!!!
14.5 mins !!!!!!!!!!!
Just for a billing!!!!!!!!!!
How to reduce it ?
Only the following things which are required for customers and billing should be in/on the cash
counter:
 visitor’s book, customer complaint toll-free tent card, gift card acrylic stand, tab
 all stationeries (pen, pencil, stapler, stamps, scale, glue stick, punching machine, calculator,
manual bill books, printer billing stationary, customer exit books) in a defined place, easy to
reach while billing
 monitor, printer, EDC machines, telephones in an organized fashion
 Pre-stamped and folded thank you cards
 20 carry bags at cash counter  Pre stamped invoices
 Pre stamped encircle cards
 3 watch boxes of all brands to be kept near the cash counter
 Warranty cards in these boxes are pre stamped
 Tab for recording customer data
and feed back
CUSTOMER FINALIZES THE
WATCH TO BE BILLED
CRO WILL ENTER HIS NAME IN
THE TABLET AND HANDS IT
OVER TO THE CUSTOMER FOR
FEEDBACK
CRO WILL START BILLING ON
ETP WHILE CUSTOMER FILLS
IN THE TABLET
CRO SETS THE WATCH AND
WILL SHOW IT TO THE
CUSTOMER
CRO PACKS THE WATCH AND
WILL HAND IT OVER TO THE
CUSTOMER IN HELIOS CARRY
BAG
(GIFT WRAP IT IF REQUIRED)
CRO 2 (HANLDING THE
CUSTOMER) WILL ENTER HIS
NAME IN THE TABLET AND
PASS IT TO THE CUSTOMER
FOR FEEDBACK
CRO 1 WILL START BILLING ON
ETP WHILE CUSTOMER FILLS
IN THE TABLET
CRO 2 SETS THE WATCH AND
WILL SHOW IT TO THE
CUSTOMER (WHILE CRO1 IS
DOING BILLNG AND
CUSTOMER IS GIVING DETAILS
IN THE TABLET)
CRO 2 PACKS THE WATCH AND
WILL HAND IT OVER TO THE
CUSTOMER IN HELIOS CARRY
BAG
(GIFT WRAP IT IF REQUIRED)
SCENARIO 1:
ONE CRO, FOR BILLING
AND PACKING OF WATCH
SCENARIO 2:
TWO CROs, ONE FOR
BILLING AND ONE FOR
PACKING OF WATCH
ALL STEPS ARE TO BE FOLLOWED PARALLELLY
ABOVE MENTIONED ARE TO BE DONE PARALLELLY
LEAN BILLING PROCESS FLOW WITH TABLET - SNAPSHOT
AFTER GENERATING
BILL (HARD COPY)
AFTER CLEARING DOUBTS OF THE
CUSTOMER (IF HE/SHE HAS ANY)
Time taken:
550s = 9.2 m
Time taken:
270s = 4.5 m
CRO will do the system billing (including UPL enrolment)
Bill gets printed
CRO sets watch and
shows it to the customer
CRO Gift wraps the watch
(if customer asks for it)
Handover the watch to the customer in a carry bag
CRO takes out the customer data from the
customer feedback portal without disturbing
the customer again
Customer fills feed back in the TAB
CRO takes out the watch box and puts
watch inside it, warrant card is already stamped
CUSTOMER IS READY FOR BILLING
140 s
20s
90 s
10 s 30 s 10 s
240 s
10 s
Total time taken for handing over the watch to
the customer
550 sec = 9.2 min
COMPARISON
Scenario Without
Lean/KAIZEN
With
Lean/KAIZEN
Time saved
Billing with 1 CRO 14.5 min 9.2 min 5.3min
Billing with 2 CROs 9.2 min 4.5 min 4.7 min
14.5
9.2
5.3
9.2
4.5 4.7
0
5
10
15
20
Without Lean/Kaizan (min) With Lean/Kaizan(min) Time saved(min)
Billing with 1 CRO Billing with 2 CROs
KAIZEN 2 : SHORTCUT KEYS FOR FASTER
BILLING
KAIZEN 3 : NEAREST ATMS AND DISTANCE
FROM HELIOS STORE (CUSTOMER FOCUSED)
KAIZEN 4 : LOCK FOR METER BOX AND HOOK
FOR HANGING SHUTTER LIFTER
KAIZEN 5 : WHITE TAGS FOR WATCHES MORE THAN 90 DAYS OLD
(SO THAT CRO CAN EASILY APPLY FIFO ON THE VARIANTS IN
EVERY BRAND )
KAIZEN 6 : MASTER PROCESS FILE
commercial
folder1
folder3
File 1
File2
File 1
File 2
File 1
File2
folder2
service
folder1
folder3
folder2
operations
folder1
folder3
folder2
ABC
folder1
folder3
folder2
Data needed to
be updated at
day end or once
in a month
Folders Sub-Folders FilesOLD
PROCESS
commercial
folder1
folder3
File 1
File2
File 1
File 2
File 1
File2
folder2
service
folder1
folder3
folder2
operations
folder1
folder3
folder2
ABC
folder1
folder3
folder2
Data needed to
be updated at
day end or once
in a month
Master process
file
Folders Sub-Folders FilesNEW
PROCESS
1
2
3
4
5
1
2
3
4
5
1
2
3
4
5
1
2
3
4
5
1
2
3
4
5
TOMMY FOSSIL SKAGEN ARMANI TITAN
KAIZEN 8: VISUAL REPRESENTATION FOR
WATCH BOX REPLENISHMENT
KANBAN
A scheduling system for Lean process
Store: Sector 18 Helios (HNOI) Kanban: 1 (Kanban Cards)
Before: it was hard to keep a track of
reorder level and quantity each and
every Item present at the store
After: All stationary and pantry items
are covered under kanban cards to keep
a right check on the reorder level and
quantity
Before After
Store: Sector 18 Helios (HNOI) Kanban:2 (‘Please use other bin’ cards)
Before: staff didn’t know which bin to
use
After: applied ‘Please use other bin’ card
to designate the buffer stock
Before After
Store: Sector 18 Helios (HNOI) Kanban:3 (Reorder level and reorder quantity cards)
Before: for stationary items like
registers, manual bill books, A4 sheets
(where 2 different bins were not
required) there was zero visibility for
Reorder level and reorder quantity
After: Reorder level and reorder
quantity cards were applied
Before After
Store: Sector 18 Helios (HNOI) Kanban: 4 (Kanban Cards)
Before: it was hard to keep a track of
reorder level and quantity each and
every Item present at the store
After: All stationary and pantry items
are covered under kanban cards to keep
a right check on the reorder level and
quantity
Before After
Store: Sector 18 Helios (HNOI) Kanban:5
Before:
Before After
NUMBER OF ITEMS FOR WHICH KANBAN
IS APPLICABLE - 34
BENEFITS OF KANBAN
 Organized way of working
 Focus on continuous delivery
 Reduction of wasted work / wasted time
 Increased productivity
 Increased efficiency
 Team members’ ability to focus
THANK YOU…

Más contenido relacionado

Destacado (6)

MAY 2015
MAY 2015MAY 2015
MAY 2015
 
Georgia
GeorgiaGeorgia
Georgia
 
iServDB雲端資料庫解決方案
iServDB雲端資料庫解決方案iServDB雲端資料庫解決方案
iServDB雲端資料庫解決方案
 
Whales
WhalesWhales
Whales
 
Level of measurement by slsmls
Level of measurement by slsmlsLevel of measurement by slsmls
Level of measurement by slsmls
 
Portal Web - Lampiran V Permen TIK
Portal Web - Lampiran V Permen TIKPortal Web - Lampiran V Permen TIK
Portal Web - Lampiran V Permen TIK
 

Lean Presentation

  • 2. Store Photo & Team photo HELIOS SEC 18 GLADIATORS
  • 3. WEEK-WISE 5 S SCORE TREND 77% 84% 82% 88% 92% 65% 70% 75% 80% 85% 90% 95% 3rd Oct13 20th Oct13 10th Nov13 24th Nov13 8th Dec13 5S Audit score
  • 5.
  • 6.
  • 7.
  • 9. Store: Sector 18 Helios (HNOI) KAIZEN:1 (House keeping material) Before: racks spaces were going wasted After: adjusted all the pantry and house keeping materials in the racks Before After
  • 10. Store: Sector 18 Helios (HNOI) KAIZEN: 2 (CHS drawer) Before: CHS’s drawer was not neat and clean After: cleaned it and removed all unwanted items Before After
  • 11. Store: Sector 18 Helios (HNOI) KAIZEN: 3 (Power room) Before: Power room was not neat After: cleaned it and removed all unwanted items Before After
  • 12. Store: Sector 18 Helios (HNOI) KAIZEN:4 (Service center) Before After Before: Service room was not neat After: cleaned it and removed all unwanted items
  • 13. Store: Sector 18 Helios (HNOI) KAIZEN:5 (Cash Counter) Before After Before: monitor was on the right side of the table which was inconvenient to operate PC After: Vault shifted to right and monitor shifted to left and leg space made available for convince
  • 14. Store: Sector 18 Helios (HNOI) KAIZEN: 6 (Cash Counter) Before: cash counter was a mess and was not neat After: rearranged all the items and removed unwanted items Before After
  • 15. Store: Sector 18 Helios (HNOI) KAIZEN: 7 (Cash Til) Before: cash counter not neat and there were no partition in it After: removed all the unwanted items, made partitions for cash and created a shadow board for all the materials required for billing Before After
  • 16. Store: Sector 18 Helios (HNOI) KAIZEN: 8 (Leg space at the cash) counter) Before: leg space at the cash counter was not clear as many wires were coming out After: adjusted a white board to block all the wires from coming out Before After
  • 17. Store: Sector 18 Helios (HNOI) KAIZEN: 9 (Cupboards and) drawers) Before: none of the drawer/ gate was labelled After: each and every gate and drawer got a number (lable) Before After
  • 18. Store: Sector 18 Helios (HNOI) KAIZEN: 10 (Power room ) Before: none of the switches were labelled After: all the switches are labelled Before After
  • 19. Store: Sector 18 Helios (HNOI) KAIZEN: 11 (Power room) Before After Before: none of the switches were labelled After: all the switches are labelled
  • 20. Store: Sector 18 Helios (HNOI) KAIZEN: 12 (Wires) Before After Before: none of the plugs were labelled After: all the plugs are labelled
  • 21. Store: Sector 18 Helios (HNOI) KAIZEN: 13 (Indexes) Before: there were no indexes/ item list inside the drawers After: pasted indexes inside all the drawers reflecting the items inside it Before After
  • 22. Store: Sector 18 Helios (HNOI) KAIZEN: 14 (Files and folders) Before: registers and files were not arranged properly After: all the files got a number and arranged properly Before After
  • 23. Store: Sector 18 Helios (HNOI) KAIZEN: 15 (Water dispenser) Before: there were no markings on the water dispenser for Hot and Cool water After: water dispenser is labelled for Hot and Cool water Before After
  • 24. Store: Sector 18 Helios (HNOI) KAIZEN: 16 (Stationary) Before: Stationary items were not arranged neatly After: all the stationary items are arranged neatly with a dividing line (red) for defining spaces Before After
  • 25. Store: Sector 18 Helios (HNOI) KAIZEN: 17 (Stationary) Before After Before: Stationary items were not arranged neatly After: all the stationary items are arranged neatly with a dividing line (red) for defining spaces
  • 26. Store: Sector 18 Helios (HNOI) KAIZEN: 18 (Key Hook) Before: there was no key hanging hooks Afters: created a hook for keys using unused C-clamps Before After
  • 27. Store: Sector 18 Helios (HNOI) KAIZEN: 19 (Pantry) Before: Pantry was not neat and clean After: cleared unwanted stuff and cleaned the pantry Before After
  • 28. Store: Sector 18 Helios (HNOI) KAIZEN: 20 (Store layout) Before: there was no layout of the store available to locate a particular drawer After: took the printout of the layout and marked each and every drawer on it to simplify the search Before After
  • 29. Store: Sector 18 Helios (HNOI) KAIZEN:21 (Store layout) Before After Before: there was no layout of the store available to locate a particular drawer After: took the printout of the layout and marked each and every drawer on it to simplify the search
  • 30. Store: Sector 18 Helios (HNOI) KAIZEN: 22 (Store layout) Before After Before: there was no layout of the store available to locate a particular drawer After: took the printout of the layout and marked each and every drawer on it to simplify the search
  • 31. Store: Sector 18 Helios (HNOI) KAIZEN: 23 (Lean File) Before: there was no separate file for Lean retailing After: Created a special file for documenting Lean retailing at HNOI (Noida Helios store) Before After
  • 32. Store: Sector 18 Helios (HNOI) KAIZEN: 24 (Stairs) Before: There were no markings at the stairs After: every step of the stair is marked with yellow tape Before After
  • 33. Store: Sector 18 Helios (HNOI) KAIZEN: 25 (Charts and graphs) Before: didn’t have enough space for putting lean and store metrics graphs After: used pantry cabin gates as white boards and pasted graphs on it Before After
  • 34. Store: Sector 18 Helios (HNOI) KAIZEN: 26 (Door mat) Before: Door mat was torn off from the corners and store was planning to buy a new one After: removed all the corners and made it as good as new Before After
  • 35. Store: Sector 18 Helios (HNOI) KAIZEN: 27 (Pantry) Before: Water dispenser was creating a space issue in the pantry After: shifted the dispenser, now pantry looks spacious Before After
  • 36. Store: Sector 18 Helios (HNOI) KAIZEN: 28 (Pre Stamped Invoices) Before After Before : We were doing the stamping after the billing process done it takes some extra time After : Now pre stamp billing stationary saves some time during billing process
  • 37. Store: Sector 18 Helios (HNOI) KAIZEN: 29 (Pre Stamped encircle cards) Before After After : Pre-Stamp Encircle Card Saves times in Billing Process Before: We do stamping after billing
  • 38. Store: Sector 18 Helios (HNOI) KAIZEN: 30 (Hooks for hanging Cloths) Before After After: Now we have put Cloth hangers behind the pantry door it is now convenient for employees. Before: There were no place where employee can hang their cloths
  • 39. Store: Sector 18 Helios (HNOI) KAIZEN: 31 (Space for carry bags) Before After After: Now we have put all the carry bags in 2 separate bins with the demarcation and use other bin option Before: Carry bags were all together, so it was difficult to identify the qty left
  • 40. Store: Sector 18 Helios (HNOI) KAIZEN: 32 (Space for Trays) Before After After: Now we are keeping all the Tray at a one place keeping mind so that it will not lying here and there. Before: Earlier Trays were lying here and there.
  • 41. Store: Sector 18 Helios (HNOI) KAIZEN: 33 (Labeled key hooks) Before After After: Now We put all store related keys at the respective demarked place Before: Earlier the all keys were lying at the counter.
  • 42. Store: Sector 18 Helios (HNOI) KAIZEN: 34 (Details of nearby ATMs) Before After After: Now we can suggest those customers where the ATM is situated Before: when swiping/EDC machine don’t works/ links down/Terminal ID fail/Decline then the chances are that customer may not comes back and also we don’t know the ATM address.
  • 43. Store: Sector 18 Helios (HNOI) KAIZEN: 35 (Shortcut keys for faster billing) Before After After: we have derived shot cut to billing so that the entire process gets easier. Before: it takes 10-12 minutes for bills invoices and customer get irritated because of this.
  • 44. Store: Sector 18 Helios (HNOI) KAIZEN: 36 (Store Index) Before After After: Store index is added to both the floors indicating which item is kept where Before: it was tough for staff or any new comer to identify which item is kept where
  • 45. Store: Sector 18 Helios (HNOI) KAIZEN: 37 (Numbering on every file) Before After After: Numbering on every file has been done for identification and setting Before: it was tough for staff to maintain files at one place in an organized manner
  • 46. Store: Sector 18 Helios (HNOI) KAIZEN: 38 Lock for meter box Before After Before: Helios’s meter box was open After: applied lock at the gate so that no one else can open it
  • 47. Store: Sector 18 Helios (HNOI) KAIZEN: 39 Hook for hanging Shutter lifter Before After Before: there was no space for keeping shutter opener After: designated a space and applied a hook inside the meter box where it is safe as meter box has a lock now
  • 48. Store: Sector 18 Helios (HNOI) KAIZEN: 40 Pre-stamped warranty cards Before After Before: warranty cards were not pre stamped, stamping these cards at the time of billing was taking few seconds After: 3 warranty cards of every brand are pre stamped during idle time for speeding up the billing process
  • 49. Store: Sector 18 Helios (HNOI) KAIZEN: 41 Carry bags kept near to the cash counter Before After Before: carry bags were kept away from the cash counter, resulted in delay in billing After: 20 carry bags are kept at the counter for faster billing
  • 50. Store: Sector 18 Helios (HNOI) KAIZEN: 42 (using tab for communicating offers) Before After Before: apart from tent cards didn’t have anything else for communicating offers inside the store After: Now communicating offers inside the store using tab
  • 51. Store: Sector 18 Helios (HNOI) KAIZEN: 43 (Lean Billing) Before After Before: Billing used to take huge amount of time After: With the help of lean and KAIZEN billing time reduced drastically Scenario Without Lean/KAIZEN Billing with 1 CRO 14.5 min Billing with 2 CROs 9.2 min Scenario With Lean/KAIZE N Time saved Billing with 1 CRO 9.2 min 5.3min Billing with 2 CROs 4.5 min 4.7 min
  • 52. Store: Sector 18 Helios (HNOI) KAIZEN: 44 (Easy identification of old stock) Before After Before: It was quite impossible for Staff to identify old variants in the stock and apply FIFO After: White tags for watches more than 90 days old (so that CRO can easily apply FIFO on the variants in every brand )
  • 53. Store: Sector 18 Helios (HNOI) KAIZEN: 45 (Visual representation for watch box management) Before After Before: No properly managed watch boxes After: visual representation has been given to the watch boxes for easy replenishment
  • 54. TOTAL NUMBER OF KAIZENS DONE & RECORDED: 45
  • 56. KAIZEN 1 : LEAN BILLING
  • 57. CUSTOMER FINALIZES THE WATCH TO BE BILLED CUSTOMER GIVES HIS FEEDBACK AND DETAILS IN THE FEEDBACK BOOK CRO STARTS BILLING ON ETP ONCE HE RECEIVES DATA FROM THE FEED BACK BOOK OR HE ASKS FOR DATA AGAIN CRO SETS THE WATCH AND WILL SHOW IT TO THE CUSTOMER CRO PACKS THE WATCH AND WILL HAND IT OVER TO THE CUSTOMER IN HELIOS CARRY BAG (GIFT WRAP IT IF REQUIRED) CRO 2 (HANLDING THE CUSTOMER) WILL HANDOVER CUSTOMER FEED BACK BOOK TO THE CUSTOMER CRO 1 WILL START BILLING ON ETP CRO 2 SETS THE WATCH AND WILL SHOW IT TO THE CUSTOMER (WHILE CRO1 IS DOING BILLNG) CRO 2 PACKS THE WATCH AND WILL HAND IT OVER TO THE CUSTOMER IN HELIOS CARRY BAG (GIFT WRAP IT IF REQUIRED) SCENARIO 1: ONE CRO, FOR BILLING AND PACKING OF WATCH SCENARIO 2: TWO CROs, ONE FOR BILLING AND ONE FOR PACKING OF WATCH ALL STEPS ARE BEING FOLLOWED PARALLELLY OLD BILLING PROCESS FLOW - SNAPSHOT AFTER GENERATING BILL (HARD COPY) AFTER CLEARING DOUBTS OF THE CUSTOMER (IF HE/SHE HAS ANY) Time taken: 870s = 14.5 m Time taken: 550s = 9.2 m
  • 58. Duplicate data • Customer’s name • Mob. No. • Email ID Customer fills feed back form CRO asks for customer’s name/ mobile no./ email id for billing (duplicity in taking customer’s data) CRO will do the system billing (including UPL enrolment) Bill gets printed CRO sets watch and shows it to the customer CRO bring the watch box, takes out the warranty card and puts stamp on it CRO Gift wraps the watch (if customer asks for it) Handover the watch to the customer in a carry bag CUSTOMER IS READY FOR BILLING 180 s 120s 90 s 10 s 30 s 180 s 240 s 20 s Total time taken just for handing over the watch to the customer 870 sec = 14.5 min
  • 59. HOW FAST BILLING SHOULD HAPPEN!!!
  • 60. 14.5 mins !!!!!!!!!!! Just for a billing!!!!!!!!!! How to reduce it ? Only the following things which are required for customers and billing should be in/on the cash counter:  visitor’s book, customer complaint toll-free tent card, gift card acrylic stand, tab  all stationeries (pen, pencil, stapler, stamps, scale, glue stick, punching machine, calculator, manual bill books, printer billing stationary, customer exit books) in a defined place, easy to reach while billing  monitor, printer, EDC machines, telephones in an organized fashion
  • 61.  Pre-stamped and folded thank you cards  20 carry bags at cash counter  Pre stamped invoices  Pre stamped encircle cards
  • 62.  3 watch boxes of all brands to be kept near the cash counter  Warranty cards in these boxes are pre stamped  Tab for recording customer data and feed back
  • 63. CUSTOMER FINALIZES THE WATCH TO BE BILLED CRO WILL ENTER HIS NAME IN THE TABLET AND HANDS IT OVER TO THE CUSTOMER FOR FEEDBACK CRO WILL START BILLING ON ETP WHILE CUSTOMER FILLS IN THE TABLET CRO SETS THE WATCH AND WILL SHOW IT TO THE CUSTOMER CRO PACKS THE WATCH AND WILL HAND IT OVER TO THE CUSTOMER IN HELIOS CARRY BAG (GIFT WRAP IT IF REQUIRED) CRO 2 (HANLDING THE CUSTOMER) WILL ENTER HIS NAME IN THE TABLET AND PASS IT TO THE CUSTOMER FOR FEEDBACK CRO 1 WILL START BILLING ON ETP WHILE CUSTOMER FILLS IN THE TABLET CRO 2 SETS THE WATCH AND WILL SHOW IT TO THE CUSTOMER (WHILE CRO1 IS DOING BILLNG AND CUSTOMER IS GIVING DETAILS IN THE TABLET) CRO 2 PACKS THE WATCH AND WILL HAND IT OVER TO THE CUSTOMER IN HELIOS CARRY BAG (GIFT WRAP IT IF REQUIRED) SCENARIO 1: ONE CRO, FOR BILLING AND PACKING OF WATCH SCENARIO 2: TWO CROs, ONE FOR BILLING AND ONE FOR PACKING OF WATCH ALL STEPS ARE TO BE FOLLOWED PARALLELLY ABOVE MENTIONED ARE TO BE DONE PARALLELLY LEAN BILLING PROCESS FLOW WITH TABLET - SNAPSHOT AFTER GENERATING BILL (HARD COPY) AFTER CLEARING DOUBTS OF THE CUSTOMER (IF HE/SHE HAS ANY) Time taken: 550s = 9.2 m Time taken: 270s = 4.5 m
  • 64. CRO will do the system billing (including UPL enrolment) Bill gets printed CRO sets watch and shows it to the customer CRO Gift wraps the watch (if customer asks for it) Handover the watch to the customer in a carry bag CRO takes out the customer data from the customer feedback portal without disturbing the customer again Customer fills feed back in the TAB CRO takes out the watch box and puts watch inside it, warrant card is already stamped CUSTOMER IS READY FOR BILLING 140 s 20s 90 s 10 s 30 s 10 s 240 s 10 s Total time taken for handing over the watch to the customer 550 sec = 9.2 min
  • 65. COMPARISON Scenario Without Lean/KAIZEN With Lean/KAIZEN Time saved Billing with 1 CRO 14.5 min 9.2 min 5.3min Billing with 2 CROs 9.2 min 4.5 min 4.7 min 14.5 9.2 5.3 9.2 4.5 4.7 0 5 10 15 20 Without Lean/Kaizan (min) With Lean/Kaizan(min) Time saved(min) Billing with 1 CRO Billing with 2 CROs
  • 66. KAIZEN 2 : SHORTCUT KEYS FOR FASTER BILLING
  • 67. KAIZEN 3 : NEAREST ATMS AND DISTANCE FROM HELIOS STORE (CUSTOMER FOCUSED)
  • 68. KAIZEN 4 : LOCK FOR METER BOX AND HOOK FOR HANGING SHUTTER LIFTER
  • 69. KAIZEN 5 : WHITE TAGS FOR WATCHES MORE THAN 90 DAYS OLD (SO THAT CRO CAN EASILY APPLY FIFO ON THE VARIANTS IN EVERY BRAND )
  • 70. KAIZEN 6 : MASTER PROCESS FILE commercial folder1 folder3 File 1 File2 File 1 File 2 File 1 File2 folder2 service folder1 folder3 folder2 operations folder1 folder3 folder2 ABC folder1 folder3 folder2 Data needed to be updated at day end or once in a month Folders Sub-Folders FilesOLD PROCESS
  • 71. commercial folder1 folder3 File 1 File2 File 1 File 2 File 1 File2 folder2 service folder1 folder3 folder2 operations folder1 folder3 folder2 ABC folder1 folder3 folder2 Data needed to be updated at day end or once in a month Master process file Folders Sub-Folders FilesNEW PROCESS
  • 72. 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 TOMMY FOSSIL SKAGEN ARMANI TITAN KAIZEN 8: VISUAL REPRESENTATION FOR WATCH BOX REPLENISHMENT
  • 73. KANBAN A scheduling system for Lean process
  • 74. Store: Sector 18 Helios (HNOI) Kanban: 1 (Kanban Cards) Before: it was hard to keep a track of reorder level and quantity each and every Item present at the store After: All stationary and pantry items are covered under kanban cards to keep a right check on the reorder level and quantity Before After
  • 75. Store: Sector 18 Helios (HNOI) Kanban:2 (‘Please use other bin’ cards) Before: staff didn’t know which bin to use After: applied ‘Please use other bin’ card to designate the buffer stock Before After
  • 76. Store: Sector 18 Helios (HNOI) Kanban:3 (Reorder level and reorder quantity cards) Before: for stationary items like registers, manual bill books, A4 sheets (where 2 different bins were not required) there was zero visibility for Reorder level and reorder quantity After: Reorder level and reorder quantity cards were applied Before After
  • 77. Store: Sector 18 Helios (HNOI) Kanban: 4 (Kanban Cards) Before: it was hard to keep a track of reorder level and quantity each and every Item present at the store After: All stationary and pantry items are covered under kanban cards to keep a right check on the reorder level and quantity Before After
  • 78. Store: Sector 18 Helios (HNOI) Kanban:5 Before: Before After
  • 79. NUMBER OF ITEMS FOR WHICH KANBAN IS APPLICABLE - 34
  • 80. BENEFITS OF KANBAN  Organized way of working  Focus on continuous delivery  Reduction of wasted work / wasted time  Increased productivity  Increased efficiency  Team members’ ability to focus