SlideShare una empresa de Scribd logo
1 de 1
Descargar para leer sin conexión
GSPublisherVersion 0.0.100.100
N
MIXED URBAN DEVELOPMENT-OLD TOWN MOMBASA 02KUMARY .S. KIUNGA B02/36033/2013
PROJECT 6 MUD -OLD TOWN MOMBASA
1500mm high
parapet wall
Arched opening with 100x50mm 1:4 c/s moulding
all round ventilation and to gel the building into
the existing swahili street character
300x300mm by 1000mm
high mpingo frame pole
base to details
230x25mm thick decorative
mpingo Fascia Board
Decorative mpingo wood
mould varnished & curved to details
crown silicone water proofing solution paint on
5mm thickwhite cement coat on
12mm thick 1:4c/s mortar with water
proofing admixture.
4mm thick Glass roof with
internal wooden sunshading devices
450mm high Planter with
flower and seating space
around to detailsmahogany door to
schedule
Decorative mpingo wood
lattice for entrance defination
to details
100x175mm mangrove pergola
over sun basking area
Spanish tiles on 50x50mm battens
on 100x50 rafters joined and fixed
to details
25mm thick machine cut
mazera cladding fixed on 1:4 c/s
on masonry to architects details
1600x3000mm rectangular mpingo
casement window with internal insect
proof net to details
250 x 120mm thick concrete moulding
curved ,plastered and painted
to architects approval details
1600mmx3000 rectangular operable
mpingo window with insect proofnet to
to details
GL GL
Decorative mpingo wood
mould varnished & curved to details
Arched opening with 100x50mm 1:4 c/s moulding
all round ventilation and to gel the building into
the existing swahili street character
1:12 ramp to
details
GLGL
Entrance to BasementEntrance to Ground
parking
1500mm high parapet wall
with coping to details
Mpingo balcony rails
230x25mm decorative mpingo
Fascia Board treated painted
with 3 coats of clear varnish
Glass roof with internal wooden
sunshading devices
Planter with flower and
seating space
100x50mm 1:4 c/s
moulding around opening
1600x3000mm rectangular mpingo
casement window with internal insect
proof net to details
250 x 120mm thick concrete moulding
curved ,plastered and painted
to architects approval details
Spanish tiles on 50x50mm battens
on 100x50 rafters on 100 x 50mm wall
plate joined and fixed to details
75x 75 mm by900mm high
treated and varnished mpingo
balcony rails to details
25mm thick machine cut
mazera cladding fixed on 1:4 c/s
mortar on 3600mm high masonry
plinth to architects details
crown silicone water proofing solution paint on
5mm thickwhite cement coat on
12mm thick 1:4c/s mortar with water
proofing admixture.
250 x 120mm thick concrete moulding
curved ,plastered and painted
to architects approval details
30 deg Spanish tiles on 50x50mm battens
on 100x50 rafters on 100 x 50mm wall
plate joined and fixed to details
Arched opening with 100x50mm 1:4 c/s moulding
all round ventilation and to gel the building into
the existing swahili street character
GL GL
1500mm high parapet wall with
coping to details
Planter with flower and
seating space around
230x25mm decorative mpingo
Fascia Board treated painted
with 3 coats of clear varnish
Glass roof with internal wooden
sunshading devices
100x50mm 1:4 c/s
moulding around opening
1600x3000mm rectangular mpingo
casement window with internal insect
proof net to details
250 x 120mm thick concrete moulding
curved ,plastered and painted
to architects approval details
75x 75 mm by900mm high
treated and varnished mpingo
balcony rails to details
25mm thick machine cut
mazera cladding fixed on 1:4 c/s
mortar on 3600mm high masonry
plinth to architects details
crown silicone water proofing solution paint on
5mm thickwhite cement coat on
12mm thick 1:4c/s mortar with water
proofing admixture.
30 deg Spanish tiles on 50x50mm battens
on 100x50 rafters on 100 x 50mm wall
plate joined and fixed to details
crown silicone water proofing solution paint on
5mm thickwhite cement coat on
12mm thick 1:4c/s mortar with water
proofing admixture.
D
D
C
C
B
B
A
A
1,5002,7003,0501503,4501503,4501503,4501501,500100
1,650
3,600
225x25mm thick
fascia board
25mm thick machine cut
mazera cladding fixed on 1:4 c/s
on masonry to architects details
+500
+3600
+7200
+10800
+14400
+3600
+7200
+14400
+10800
+500
pv pv
pv pv
pv pv
Lift car
Basement
Entrance Lobby
Lift Lobby
Lift Lobby
Lift Lobby
Refuse
Balcony
Balcony
Refuse
chute
1500mm high
parapet wall
Wooden balcony
rails
150mm thick
RC slab
Concrete Moulding
to details
Decorative
Facia Board
Decorative wooden
mould
Glass roof with internal wooden
sunshading devices
Planter with flower and
seating space around
RC stairs to details
Tread=300mm
Riser=150mm
1500mm high
parapet wall
Spanish roof tiles on 50x50mm battens
on 150x50mm raters @ 1000c/c on
100x50mm wall plate
D-06
2,0001503,4501503,0004501507,050150
200 1,100
200 1,350 150 75
Red spanish clay tiles
on 50 x50mm battens
1600X3000mm wooden casement window
with insect proof wire to schedule
75x 75 mm by900mm high
treated and varnished mpingo
balcony to details
250 x 120mm thick concrete moulding
curved ,plastered and painted
to architects approval details
Decorative mpingo wood
mould varnished & curved
to details
Planter with flower and
seating space around
175mm thick basement wall
with 100mm masonry protective
wall and 25mm thick mastic asphalt
Arched opening with 100x50mm
1:4 c/s moulding all round for
ventilation and to gel the building
into the existing swahili street
character
12mm thick 1:3C/s plaster on 200mm
thick masonry wall painted with 3 coats
emulsion paint to architect's approval
Raft foundation to SE's details
300mm rectangular
Mpingo wood Post
75mm thick moulding
around arched opening
+7200
+500
+3600
+10800
+14400
GL
Aluminium gutter box to approval
Truss bolted into parapet wall
230x25mm thick Decorated
mpingo fascia board
Aluminium flashing at junction
between wall and tiles
0.100
REVITAL
GL GL
24x150=3,600
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
02
03
01
XX
ZZ
YY
Glass roof with
internal sunshaded
devices to details
1200mm wide stairs
Tread=300mm
Riser=150
Solar water
heating system
1500mm high
parapet wall with
coping to details
steps up
Riser@150
Tread=250
30Deg Spanish
roof tiles
Concrete gutter
to details
Pergola over
lounge chair
SWIMMING POOL
Solar water
heating
10000ltrs
water tank
10000ltrs
water tank
GYM
Aerobics and
yoga terrace
Tread mill
Weight
machineWeight
Bench
Stationery
bicycleRowing
machine
Views to
Old port
mombasa
NDIA KUU STREET ELEVATION
SCALE 1:200
ELEVATION 01
SCALE 1:100
ELEVATION 02
SCALE 1:100
ELEVATION 03
SCALE 1:100
SECTION X-X
SCALE 1:100
SECTION Z-Z[BLOW UP]
SCALE 1:20
The elevation design was influenced and
guided by the exisitng ndia kuu street
character and pattern, in an effort to fit in
the new design without much
interferance to the neighbourhood/street
pattern the front facade has been
divided into four parts that projects onto
the street this relates to the the facades
size and scalebof the existing
neighbourhood buildings.
The building has a 3.6m plinth that is
finished with dark brown machine cut
mazeras with the upper part having
waterproof paint this gives the building a
color/material gradient with a dark plinth
that rises up to light upper level.
The building has a canopy with an
'eyebrow' that creates a human friendly
scale for pedestrians
THE ELEVATIONS
ROOF PLAN
SCALE 1:100

Más contenido relacionado

La actualidad más candente

GATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDYGATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDYGeeva Chandana
 
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...NafeeZullah
 
Manav sadhana case study ahmedabad
Manav sadhana case study ahmedabadManav sadhana case study ahmedabad
Manav sadhana case study ahmedabadmanoj chauhan
 
Architecture case study -The village
Architecture case study -The villageArchitecture case study -The village
Architecture case study -The villageBimenpreet Kaur
 
Nid & CEPT ahmedabad primary case study
Nid & CEPT ahmedabad primary case studyNid & CEPT ahmedabad primary case study
Nid & CEPT ahmedabad primary case studyYash Kotgirwar
 
Housing design n standards
Housing design n standardsHousing design n standards
Housing design n standardsJoshuaL3
 
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)Sumaiya Islam
 
Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1
Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1
Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1Grace Henry
 
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Dimple Poddar
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEjagrutib22
 
Case study of a architectural bungalow
Case study of a architectural bungalowCase study of a architectural bungalow
Case study of a architectural bungalowMayur Waghulde
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building ShrushtiAhirrao1
 
Auditorium: A Case Study on Acoustic Design Presentation
Auditorium: A Case Study on Acoustic Design PresentationAuditorium: A Case Study on Acoustic Design Presentation
Auditorium: A Case Study on Acoustic Design Presentationjisunfoo
 
Sheikh sarai housing complex
Sheikh sarai housing complexSheikh sarai housing complex
Sheikh sarai housing complexHarshita Singh
 
Salt Lake City Centre
Salt Lake City CentreSalt Lake City Centre
Salt Lake City CentreRashmi Gautam
 

La actualidad más candente (20)

Acoustic material
Acoustic materialAcoustic material
Acoustic material
 
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDYGATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
GATED COMMUNITY ARCHITECTURE THESIS CASE STUDY
 
The interlace singapore
The interlace singaporeThe interlace singapore
The interlace singapore
 
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
School of Planning & Architecture Vijayawada (SPA Vijayawada) and School of P...
 
Case study low raise appartment
Case study  low raise appartmentCase study  low raise appartment
Case study low raise appartment
 
Manav sadhana case study ahmedabad
Manav sadhana case study ahmedabadManav sadhana case study ahmedabad
Manav sadhana case study ahmedabad
 
Architecture case study -The village
Architecture case study -The villageArchitecture case study -The village
Architecture case study -The village
 
Nid & CEPT ahmedabad primary case study
Nid & CEPT ahmedabad primary case studyNid & CEPT ahmedabad primary case study
Nid & CEPT ahmedabad primary case study
 
Housing design n standards
Housing design n standardsHousing design n standards
Housing design n standards
 
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
Housing case study(KAFCO housing,Aranya lowcost housing, TARA housing)
 
Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1
Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1
Intelligent Building- Burj Khalifa and Advantech Linkou Campus Phase 1
 
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
 
Open air theater
Open air theaterOpen air theater
Open air theater
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNE
 
Case study of a architectural bungalow
Case study of a architectural bungalowCase study of a architectural bungalow
Case study of a architectural bungalow
 
Cept Case study
Cept Case studyCept Case study
Cept Case study
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building
 
Auditorium: A Case Study on Acoustic Design Presentation
Auditorium: A Case Study on Acoustic Design PresentationAuditorium: A Case Study on Acoustic Design Presentation
Auditorium: A Case Study on Acoustic Design Presentation
 
Sheikh sarai housing complex
Sheikh sarai housing complexSheikh sarai housing complex
Sheikh sarai housing complex
 
Salt Lake City Centre
Salt Lake City CentreSalt Lake City Centre
Salt Lake City Centre
 

Destacado

Day in a life in Moshi, Tanzania
Day in a life in Moshi, TanzaniaDay in a life in Moshi, Tanzania
Day in a life in Moshi, Tanzanialvincentvaughan
 
Apostila ibutg
Apostila ibutgApostila ibutg
Apostila ibutgElba2015
 
Elevations & sections-Architecture school 4th yr project 3
Elevations & sections-Architecture school 4th yr project  3Elevations & sections-Architecture school 4th yr project  3
Elevations & sections-Architecture school 4th yr project 3Aden Saitabau Kumary
 
Master plan-Architecture school 4th yr project 3
Master plan-Architecture school 4th yr project 3Master plan-Architecture school 4th yr project 3
Master plan-Architecture school 4th yr project 3Aden Saitabau Kumary
 
English ii presentation
English ii presentationEnglish ii presentation
English ii presentationHarwinder Girn
 
Dewan Tunku Canselor compilation
Dewan Tunku Canselor compilationDewan Tunku Canselor compilation
Dewan Tunku Canselor compilationCarlson Ko
 
Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)
Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)
Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)guimera
 
M2 project assignment aug 2015
M2 project assignment aug 2015M2 project assignment aug 2015
M2 project assignment aug 2015Momo Poyi
 
The art of drinking …in paintings
The art of drinking …in paintingsThe art of drinking …in paintings
The art of drinking …in paintingsguimera
 
The Birth of Venus in paintings
The Birth of Venus in paintingsThe Birth of Venus in paintings
The Birth of Venus in paintingsguimera
 
Cupid and Psyche_ Paintings
Cupid and Psyche_ PaintingsCupid and Psyche_ Paintings
Cupid and Psyche_ Paintingsguimera
 
The greatest picnics in paintings
The greatest picnics in paintingsThe greatest picnics in paintings
The greatest picnics in paintingsguimera
 

Destacado (20)

Floor plans
Floor plansFloor plans
Floor plans
 
Tanzania presentation
Tanzania presentationTanzania presentation
Tanzania presentation
 
Day in a life in Moshi, Tanzania
Day in a life in Moshi, TanzaniaDay in a life in Moshi, Tanzania
Day in a life in Moshi, Tanzania
 
Apostila ibutg
Apostila ibutgApostila ibutg
Apostila ibutg
 
Sections and details
Sections and detailsSections and details
Sections and details
 
Elevations & sections-Architecture school 4th yr project 3
Elevations & sections-Architecture school 4th yr project  3Elevations & sections-Architecture school 4th yr project  3
Elevations & sections-Architecture school 4th yr project 3
 
Master plan-Architecture school 4th yr project 3
Master plan-Architecture school 4th yr project 3Master plan-Architecture school 4th yr project 3
Master plan-Architecture school 4th yr project 3
 
English ii presentation
English ii presentationEnglish ii presentation
English ii presentation
 
Dewan Tunku Canselor compilation
Dewan Tunku Canselor compilationDewan Tunku Canselor compilation
Dewan Tunku Canselor compilation
 
Morphosis_Profile_10_14_opt
Morphosis_Profile_10_14_optMorphosis_Profile_10_14_opt
Morphosis_Profile_10_14_opt
 
Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)
Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)
Kunstmuseum Basel, Basel_Paintings Collection, The Masterpieces (1)
 
Master plan sheet 2 b
Master plan sheet 2 bMaster plan sheet 2 b
Master plan sheet 2 b
 
M2 project assignment aug 2015
M2 project assignment aug 2015M2 project assignment aug 2015
M2 project assignment aug 2015
 
Introduction to research methods
Introduction to research methods Introduction to research methods
Introduction to research methods
 
The art of drinking …in paintings
The art of drinking …in paintingsThe art of drinking …in paintings
The art of drinking …in paintings
 
The Birth of Venus in paintings
The Birth of Venus in paintingsThe Birth of Venus in paintings
The Birth of Venus in paintings
 
One way slab design 10.01.03.162
One way slab design 10.01.03.162One way slab design 10.01.03.162
One way slab design 10.01.03.162
 
Cupid and Psyche_ Paintings
Cupid and Psyche_ PaintingsCupid and Psyche_ Paintings
Cupid and Psyche_ Paintings
 
urban design project 3
urban design project 3urban design project 3
urban design project 3
 
The greatest picnics in paintings
The greatest picnics in paintingsThe greatest picnics in paintings
The greatest picnics in paintings
 

Similar a Elevations & sections

Adenta renovation finishes schedule
Adenta renovation finishes scheduleAdenta renovation finishes schedule
Adenta renovation finishes scheduleNana Barima
 
Killeshin building it carlow
Killeshin building it carlowKilleshin building it carlow
Killeshin building it carlowTej Raj Upreti
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure CentreEdel Fox
 
Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Trevain Bechan
 
section and detail sheet1
section and detail sheet1section and detail sheet1
section and detail sheet1Jacob Dobson
 
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSMill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSSin Byrne
 
Mauritius Freeport Development
Mauritius Freeport DevelopmentMauritius Freeport Development
Mauritius Freeport DevelopmentTrevain Bechan
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaAaron Kaira
 
Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01Trevain Bechan
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSSin Byrne
 
Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updatedArthur Wilson
 
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ PharmacySheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ PharmacyConor McEvoy
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert LedwabaJan Malesela
 
Third Year Surgery Project
Third Year Surgery ProjectThird Year Surgery Project
Third Year Surgery Projectdanburge
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSSin Byrne
 

Similar a Elevations & sections (20)

Adenta renovation finishes schedule
Adenta renovation finishes scheduleAdenta renovation finishes schedule
Adenta renovation finishes schedule
 
Killeshin building it carlow
Killeshin building it carlowKilleshin building it carlow
Killeshin building it carlow
 
Leisure Centre
Leisure CentreLeisure Centre
Leisure Centre
 
Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02
 
section and detail sheet1
section and detail sheet1section and detail sheet1
section and detail sheet1
 
House Carol Submission
House Carol SubmissionHouse Carol Submission
House Carol Submission
 
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSMill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
 
Mauritius Freeport Development
Mauritius Freeport DevelopmentMauritius Freeport Development
Mauritius Freeport Development
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron Kaira
 
portfolio_linework
portfolio_lineworkportfolio_linework
portfolio_linework
 
Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01
 
Project1
Project1Project1
Project1
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
 
Wall Plans
Wall PlansWall Plans
Wall Plans
 
final dcc
final dccfinal dcc
final dcc
 
Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updated
 
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ PharmacySheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
Sheet No - 28 - Details (11) - Structural Glazing Sloped @ Pharmacy
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
Third Year Surgery Project
Third Year Surgery ProjectThird Year Surgery Project
Third Year Surgery Project
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
 

Último

CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organizationchnrketan
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfShreyas Pandit
 

Último (20)

CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organization
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdf
 

Elevations & sections

  • 1. GSPublisherVersion 0.0.100.100 N MIXED URBAN DEVELOPMENT-OLD TOWN MOMBASA 02KUMARY .S. KIUNGA B02/36033/2013 PROJECT 6 MUD -OLD TOWN MOMBASA 1500mm high parapet wall Arched opening with 100x50mm 1:4 c/s moulding all round ventilation and to gel the building into the existing swahili street character 300x300mm by 1000mm high mpingo frame pole base to details 230x25mm thick decorative mpingo Fascia Board Decorative mpingo wood mould varnished & curved to details crown silicone water proofing solution paint on 5mm thickwhite cement coat on 12mm thick 1:4c/s mortar with water proofing admixture. 4mm thick Glass roof with internal wooden sunshading devices 450mm high Planter with flower and seating space around to detailsmahogany door to schedule Decorative mpingo wood lattice for entrance defination to details 100x175mm mangrove pergola over sun basking area Spanish tiles on 50x50mm battens on 100x50 rafters joined and fixed to details 25mm thick machine cut mazera cladding fixed on 1:4 c/s on masonry to architects details 1600x3000mm rectangular mpingo casement window with internal insect proof net to details 250 x 120mm thick concrete moulding curved ,plastered and painted to architects approval details 1600mmx3000 rectangular operable mpingo window with insect proofnet to to details GL GL Decorative mpingo wood mould varnished & curved to details Arched opening with 100x50mm 1:4 c/s moulding all round ventilation and to gel the building into the existing swahili street character 1:12 ramp to details GLGL Entrance to BasementEntrance to Ground parking 1500mm high parapet wall with coping to details Mpingo balcony rails 230x25mm decorative mpingo Fascia Board treated painted with 3 coats of clear varnish Glass roof with internal wooden sunshading devices Planter with flower and seating space 100x50mm 1:4 c/s moulding around opening 1600x3000mm rectangular mpingo casement window with internal insect proof net to details 250 x 120mm thick concrete moulding curved ,plastered and painted to architects approval details Spanish tiles on 50x50mm battens on 100x50 rafters on 100 x 50mm wall plate joined and fixed to details 75x 75 mm by900mm high treated and varnished mpingo balcony rails to details 25mm thick machine cut mazera cladding fixed on 1:4 c/s mortar on 3600mm high masonry plinth to architects details crown silicone water proofing solution paint on 5mm thickwhite cement coat on 12mm thick 1:4c/s mortar with water proofing admixture. 250 x 120mm thick concrete moulding curved ,plastered and painted to architects approval details 30 deg Spanish tiles on 50x50mm battens on 100x50 rafters on 100 x 50mm wall plate joined and fixed to details Arched opening with 100x50mm 1:4 c/s moulding all round ventilation and to gel the building into the existing swahili street character GL GL 1500mm high parapet wall with coping to details Planter with flower and seating space around 230x25mm decorative mpingo Fascia Board treated painted with 3 coats of clear varnish Glass roof with internal wooden sunshading devices 100x50mm 1:4 c/s moulding around opening 1600x3000mm rectangular mpingo casement window with internal insect proof net to details 250 x 120mm thick concrete moulding curved ,plastered and painted to architects approval details 75x 75 mm by900mm high treated and varnished mpingo balcony rails to details 25mm thick machine cut mazera cladding fixed on 1:4 c/s mortar on 3600mm high masonry plinth to architects details crown silicone water proofing solution paint on 5mm thickwhite cement coat on 12mm thick 1:4c/s mortar with water proofing admixture. 30 deg Spanish tiles on 50x50mm battens on 100x50 rafters on 100 x 50mm wall plate joined and fixed to details crown silicone water proofing solution paint on 5mm thickwhite cement coat on 12mm thick 1:4c/s mortar with water proofing admixture. D D C C B B A A 1,5002,7003,0501503,4501503,4501503,4501501,500100 1,650 3,600 225x25mm thick fascia board 25mm thick machine cut mazera cladding fixed on 1:4 c/s on masonry to architects details +500 +3600 +7200 +10800 +14400 +3600 +7200 +14400 +10800 +500 pv pv pv pv pv pv Lift car Basement Entrance Lobby Lift Lobby Lift Lobby Lift Lobby Refuse Balcony Balcony Refuse chute 1500mm high parapet wall Wooden balcony rails 150mm thick RC slab Concrete Moulding to details Decorative Facia Board Decorative wooden mould Glass roof with internal wooden sunshading devices Planter with flower and seating space around RC stairs to details Tread=300mm Riser=150mm 1500mm high parapet wall Spanish roof tiles on 50x50mm battens on 150x50mm raters @ 1000c/c on 100x50mm wall plate D-06 2,0001503,4501503,0004501507,050150 200 1,100 200 1,350 150 75 Red spanish clay tiles on 50 x50mm battens 1600X3000mm wooden casement window with insect proof wire to schedule 75x 75 mm by900mm high treated and varnished mpingo balcony to details 250 x 120mm thick concrete moulding curved ,plastered and painted to architects approval details Decorative mpingo wood mould varnished & curved to details Planter with flower and seating space around 175mm thick basement wall with 100mm masonry protective wall and 25mm thick mastic asphalt Arched opening with 100x50mm 1:4 c/s moulding all round for ventilation and to gel the building into the existing swahili street character 12mm thick 1:3C/s plaster on 200mm thick masonry wall painted with 3 coats emulsion paint to architect's approval Raft foundation to SE's details 300mm rectangular Mpingo wood Post 75mm thick moulding around arched opening +7200 +500 +3600 +10800 +14400 GL Aluminium gutter box to approval Truss bolted into parapet wall 230x25mm thick Decorated mpingo fascia board Aluminium flashing at junction between wall and tiles 0.100 REVITAL GL GL 24x150=3,600 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 02 03 01 XX ZZ YY Glass roof with internal sunshaded devices to details 1200mm wide stairs Tread=300mm Riser=150 Solar water heating system 1500mm high parapet wall with coping to details steps up Riser@150 Tread=250 30Deg Spanish roof tiles Concrete gutter to details Pergola over lounge chair SWIMMING POOL Solar water heating 10000ltrs water tank 10000ltrs water tank GYM Aerobics and yoga terrace Tread mill Weight machineWeight Bench Stationery bicycleRowing machine Views to Old port mombasa NDIA KUU STREET ELEVATION SCALE 1:200 ELEVATION 01 SCALE 1:100 ELEVATION 02 SCALE 1:100 ELEVATION 03 SCALE 1:100 SECTION X-X SCALE 1:100 SECTION Z-Z[BLOW UP] SCALE 1:20 The elevation design was influenced and guided by the exisitng ndia kuu street character and pattern, in an effort to fit in the new design without much interferance to the neighbourhood/street pattern the front facade has been divided into four parts that projects onto the street this relates to the the facades size and scalebof the existing neighbourhood buildings. The building has a 3.6m plinth that is finished with dark brown machine cut mazeras with the upper part having waterproof paint this gives the building a color/material gradient with a dark plinth that rises up to light upper level. The building has a canopy with an 'eyebrow' that creates a human friendly scale for pedestrians THE ELEVATIONS ROOF PLAN SCALE 1:100