SHIP’S SURVEY


NIPPON KAIJI KYOKAI
•
SHIP’S SURVEY & GOOD
    MAINTENANCE
      ON BOARD

  NIPPON KAIJI KYOKAI
       (ClassNK)
Introduction to ClassNK
Nippon Kaiji Kyokai, known as ClassNK or NK,
is a ship classification society.
It is what is known under Japanese law as a public
service foundation and in its Act of Endowment, its
ultimate goal is expressed as: "to contribute to the
development of maritime service for the protection of
human life and property at sea". Environmental
protection has also become an increasingly major
concern.
Presented by
• Lcdr. Prayudh Thongdii Surveyor
Periodical surveys
•   2.1 General
•   2.2 Annual Surveys
•   2.3 Intermediate Surveys
•   2.4 Special Surveys
•   2.5 Docking Surveys
•   2.6 Boiler Survey (Skip)
•   2.6 Propeller Shaft Survey
Bulk Carrier
Bulk Carrier
Container Carrier
Oil Tanker
LNG Carrier
General Cargo
Reefer Carrier
Vehicles Carrier
Tug Boat
Annual Surveys

1 The purpose of an Annual Survey is to confirm
 that the general condition of the hull is
 maintained at a satisfactory level.
2 Generally as the ship ages, ballast tanks are
 required to be subjected to more extensive
 overall and close-up surveys at Annual
  Surveys.
Intermediate Surveys

1 The Intermediate Survey may be held at or
 between the second or third Annual Survey in
 each five year Special Survey cycle. Those
 items, which are additional to the requirements
 of the Annual Surveys, may be surveyed either
 at or between the 2nd and 3rd Annual Survey.
 The intermediate survey contains requirements
 for extended overall and close-up surveys
 including thickness measurements of cargo and
 ballast tanks.
Special Surveys
1 The Special Surveys are carried out at five-year intervals
  for the purpose of establishing the condition of the
  structure to confirm that the structural integrity is
  satisfactory in accordance with the Classification
  Requirements, and will remain fit for its intended purpose
  for another five-year period, subject to proper
  maintenance and operation of the ship and to periodical
  surveys carried out at the due dates.
2 The Special Survey concentrates on close-up surveys in
  association with thickness measurements and is aimed
  at detecting fractures, buckling, corrosion and other
  types of structural deterioration.
3 Thickness measurements are to be carried out upon
  agreement with the Classification Society concerned in
  conjunction with the Special Survey.
Drydocking (Bottom) Surveys


The objective of docking the ship periodically
is to inspect the portion of the hull beneath
the water-line which those parts of the hull
under the water-line are always immersed in
water; therefore, the condition of damage in
the event of the ship stranding /
grounding/damages cannot be observed.
Propeller Shaft Survey
Check lists

•   Hull & Machinery
•   Fire fighting appliances
•   Machinery in engine room
•   Electrical Equipment
•   Mooring arrangements
•   Docking Survey
•   Propeller Shaft Survey
Class Survey
              General Examinations
                      (Hull)
01 Shell plating above W.L.
02 Weather deck plating
03 Openings on deck and outside of hull, deck
  house, companionway, hatch coamings and covers,
  side ports, cargo ports and side scuttles
04 Exposed engine casing and skylights
05 Ventilators
06 Air pipes and sounding pipes
07 W. T. bulkheads and superstructure's end
  bulkheads including W. T. doors, penetrations, Stop
  valves and door openings
Hull

08 Load line marks
09 Bulwarks, guard rails and freeing ports
10 Means of access ; gangways, walkways and life
  lines
11 Scuppers, inlets, other discharge pipes and valves
12 Anchoring and mooring arrangement
13 Fire extinguishing arrangement
14 Fire protection and means of escape, etc.
15 Loading computer
16 Ship Identification Number
Performance Test (Hull)

01 Doors on watertight bulkheads
02 Drainage, mooring and anchoring arrangements and
  their accessories
03 Appliances related to fire protection and escape
04 Fire detection and fire alarm system including manually
  operated call points
05 Fire pump including emergency fire pump, piping,
  hydrants, hoses, nozzles, etc.
06 Ventilation system fan
07 Fixed dry-chemical powder fire fighting system
08 Water spray system
09 Quantity of Carbon dioxide extinguishing medium
10 Quantity of halon extinguishing medium
Hull

• 11 Quantity of dry chemical powder
  extinguishing medium
• 12 Fixed carbon dioxide fire fighting system
  (Piping and alarm of systems)
• 13 Fixed halon fire fighting system (Piping and
  alarm of systems)
• 14 Fixed foam fire fighting system (Piping)
• 15 Fixed high expansion foam fire fighting
  system (Piping)
Hull

• 16 Fixed pressure water spraying fire fighting
     system (System and pump of the system)
• 17 Automatic sprinkler system (Delivery alarm
     and pump)
• 18 Closing appliances of openings related to fire
     fighting in way of cargo holds
Machinery
            • General Examinations
01 Main propulsion machinery, power
  transmission machinery, shafting
  system,prime movers other than main
  propulsion machinery, boilers, thermal oil
  heaters,incinerators, pressure vessels,
  auxiliary machinery, piping systems, control
  systems,electrical installations and
  switchboards
02 Engine room, boiler spaces and means of
  escape
03 Refrigerating machinery except "RMC“
                       •
Machinery
                • Performance Tests
01 Shut-off devices for oil tanks
02 Emergency shut-down of motor for F.O. pumps, cargo
   oil pumps, ventilating fans& boiler draught fans
03 Emergency electrical power source
04 Communication system with Engineer's alarm
05 Steering gears ( including control system )
06 Bilge system
07 Safety devices or alarm devices of main propulsion
   machinery and auxiliary machinery
08 Safety devices or alarm devices of boilers, thermal oil
   heaters and incinerators
09 Monitoring devices, such as pressure indicators,
   thermometers etc.
Maintenance Check lists
Hull & Machinery
   Items                 Check Points

• Freeboard marks     • Clearly marked on
                        shell plating each
                        side.
Hull & Machinery
   Items                  Check Points

• Superstructure end   • No heavy wastage
  bulkhead               exceeding permissible
                         limit.
Hull & Machinery
    Items                  Check Points

• Doors of all access  • Effective
  openings in bulkhead   weathertightness.
  at ends of enclosed • No heavy corrosion,
  superstructures.       holes.
                       • Condition of gaskets and
                         clamping devices in good
                         order.
Hull & Machinery
   Items                  Check Points

• Access hatches • Effective weathertightness.
                 • Hatch coamings in good
                   condition without
                   heavy wastage or holes.
                 • Condition of gaskets and
                   clamping devices in good
                   order.
Hull & Machinery
    Items                    Check Points

• Cargo • Effective weathertightness.
  hatches • Hatch coamings and stays in good condition
            without heavy wastage or holes.
          • Hatch covers in good condition without heavy
            wastage or holes.
          • Condition of gaskets and clamping devices in
            good order.
          • Battens and wedges available on board in
            good order.
          • Tarpaulins in good condition without holes.
Hull & Machinery
   Items                  Check Points

• Machinery space • Effective weathertightness.
  openings        • Covers, casings and
                    coamings in good condition
                    without heavy wastage or
                    holes
Hull & Machinery
    Items                    Check Points

• Manholes,          • Effective weathertightness.
  flush scuttles     • Covers and bolts in good
                       condition without heavy
                       wastage.
Hull & Machinery
   Items                   Check Points

• Deckhouses,        • Effective weathertightness.
  companionways      • Bulkhead plating in good
  with openings in     condition without heavy
  freeboard deck       corrosion or holes.
                     • Doors in good condition
                       without heavy
                     • corrosion or holes.
                     • Gaskets and clamping
                       devices in good order.
Hull & Machinery
   Items                  Check Points

• Ventilators   • Coamings in good condition
                  without heavy corrosion, holes.
                • Closing covers in good
                  condition, efficient
                  weathertightness.
                • Gaskets, clamping devices in
                  order.
Hull & Machinery
   Items                Check Points

• Air      • Coamings in good condition
  pipes      without heavy corrosion or holes.
           • Air pipe heads in good condition
             without heavy corrosion or holes.
           • Floats in pipe heads in good
             order.
           • Wire gauzes in good condition.
             (for oil tanks only)
Hull & Machinery
   Items                  Check Points

• Cargo ports    • Effective weathertightness.
  and similar    • Steel plating and attachments
  openings         in good condition without
                   heavy wastage.
Hull & Machinery
   Items                   Check Points

• Scuppers, inlets,   • Distance pieces in good
  discharges            condition without heavy
                        corrosion or holes.
                      • Non-return valves in good
                        order without heavy
                        corrosion or holes.
Hull & Machinery
   Items                    Check Points

• Side scuttles     • Effective watertightness.
                    • Deadlights in good order.
Hull & Machinery
   Items                    Check Points

• Freeing ports       • Draining arrangements
                        in good order.
Hull & Machinery
   Items                  Check Points

• Bulwarks and stays, • Condition in good order
  guard rails           without heavy corrosion,
                        holes or cracks.
Hull & Machinery
   Items                  Check Points

• Life lines,     • Condition in good order
  gangways,         without heavy corrosion,
  passages          missing components or
                    holes.
Hull & Machinery
   Items                   Check Points

• Uprights, lashings   • Sockets, eye plates,
                         stanchions in good
                       • condition without heavy
                         corrosion, holes or
                       • cracks.
Hull & Machinery
   Items                  Check Points

• Main deck plating    • Condition in good order.
• Cross deck plating   • No heavy wastage,
                         corrosion, cracks.
Hull & Machinery
   Items                    Check Points

• F‘cle deck plating,   • Condition in good order.
• Poop deck plating     • No heavy wastage,
                          corrosion, cracks.
Hull & Machinery
   Items                   Check Points

• All piping on deck   • Condition in good order.
  with valves          • No heavy wastage,
                         corrosion, cracks.
Hull & Machinery
   Items                     Check Points

• Electric cable        • Condition in good order.
  conduit               • No heavy wastage,
                          corrosion, cracks.
Hull & Machinery
   Items                  Check Points

• Cargo holds   • Bulkheads, frames, tanktop
                  plating in good condition.
                • No heavy corrosion, wastage,
                  holes or cracks.
                • Access ladders, piping in good
                  condition.
                • No heavy wastage, holes.
Hull & Machinery
   Items                   Check Points

• Ballast   • No leakage, damage.
  tanks     • Bulkheads (trans/longl.),
              longitudinals, transverse rings,
              horizontal girders, other members in
              good condition. No heavy corrosion,
              wastage, holes or cracks.
            • Access ladders, piping in good
              condition. No heavy wastage, holes
Hull & Machinery
   Items                   Check Points

• Cargo    • No leakage, damage.
  tanks    • Bulkheads (trans/longl.),
             longitudinals, transverse rings,
             horizontal girders, other members in
             good condition. No heavy corrosion,
             wastage, holes or cracks.
           • Access ladders, piping in good
             condition. No heavy wastage, holes
Hull & Machinery
   Items                   Check Points

• Fuel oil • No leakage, damage.
  tanks    • Bulkheads (trans/longl.),
             longitudinals, transverse rings,
             horizontal girders, other members in
             good condition. No heavy corrosion,
             wastage, holes or cracks.
           • Access ladders, piping in good
             condition. No heavy wastage, holes
Hull & Machinery
   Items                   Check Points

• Other compartments • Bulkheads (trans/longl.),
  (Bos‘n store, deck   longitudinals, transverse
   stores, etc.)       rings, horizontal girders,
                       other members in good
                       condition.
                       No heavy corrosion,
                       wastage, holes or
                       cracks.
Hull & Machinery
    Items                     Check Points

• Pump • Bulkheads, longitudinals, web frames, other
         members in good condition. No heavy
  room   corrosion, wastage, holes or cracks.
       • Access ladders, piping in good condition.
       • No heavy wastage, holes.
       • Particular care to be taken to ensure electrical
         equipment in good order, lights (explosion
         proof).
       • Protection of cargo pump room (bilge alarm,
         gas monitoring system, temperature sensor,
         inter-lock system) working satisfactorily
Hull & Machinery
   Items                  Check Points

• Water ingress alarm   • Working satisfactorily
• system
Hull & Machinery
   Items                  Check Points

• Remote pump control    • Working satisfactorily
  system
  (F.P.T, Bos’n store)
  (for Bulk Carrier)
Hull & Machinery
   Items                   Check Points

• High velocity P/V     • Working satisfactorily
• valve                 • No sticking/clogging
                          by solidifying
                        • substances
Fire Fighting Appliances
  Item                         Check points

• Fire integrity             • Insulation on “A” class
                               bulkheads and decks
                               ingood condition.
                             • Penetrations of
                               ventilation ducts cable
                             • penetration and pipes
                               through “A” class bulk
                             • heads and decks in
                               good order.
Fire Fighting Appliances
  Item                       Check points
• Fire doors              • Operate satisfactorily.
                          • Self-closing doors not to
                            be fitted with
                            hold-back hooks.


• Skylights               • Closing arrangements in
                            good order
                          • Skylights to be of steel
                            and not contain glass
                            panels.
Fire Fighting Appliances
  Item                        Check points
• Fire dampers              • Operate satisfactorily.
                            • Cargo holds
                            • Engine room
                            • Accommodation spaces
                            • Control stations
                            • Other spaces
                            • Clear marking of “Close-
                              Open”.
                            • No hole / defection of
                              dampers
Fire Fighting Appliances
  Item                    Check points

• Main fire pumps      • Operate satisfactorily.
                       • Proper pressure
                         maintained.
                       • Pressure gauges in
                         good order
Fire Fighting Appliances
  Item                    Check points

• Emergency fire pump   • Operates
                          satisfactorily.
                        • Proper pressure
                          maintained.
                        • Pressure gauges in
                          good order
                        • Prime mover in good
                          condition.
                        • Exhaust gas piping in
                          good order.
Fire Fighting Appliances
  Item                      Check points

• Fire main piping       • No leakage, heavy
                           wastage in lines
                         • No doublers, clamps,
                         • soft patches in lines

• Isolation valves       • Operate satisfactorily.
Fire Fighting Appliances
  Item                     Check points

• Hydrants              • Fire hoses easily
                          coupled to hydrants
                        • Satisfactory operation
                          of valves.
                        • Valve handles not
                          broken
Fire Fighting Appliances
  Item                      Check points

• Fire hoses             • All hoses in good
                           condition, without
                           leakage.
                         • Checking the number
                           of hoses acc. to the
                           fire
                         • control plan
                         • Complete with nozzle
                           and couplings
Fire Fighting Appliances
  Item                   Check points

• Nozzles            • All nozzles in good
                       condition, without leakage.
                     • Jet type nozzles, and
                       jet/spray dual type in
                       engine room.
                     • Operation of easy change
                       mode.
                     • Operation of easy change
                       mode and shut-off devices.
Fire Fighting Appliances
    Item                        Check points
• Portable fire    • Checking the number of portable fire
  extinguishers      extinguishers of each type according
                     to the fire
   foam,
                   • control plan.
   dry power
                   • Cylinders in good condition,
   CO2)
                      without serious corrosion / damage.
                   • Validity of the medium
                        foam : one year
                        dry powder : five year
                        CO2 : measure at Class SS
                                and IS
Fire Fighting Appliances
   Item                          Check points
• Portable foam        • Checking the air-foam nozzle,
• applicator unit        portable tank of foam making liquid,
                         and one spare tank.
                         Testing the connection to fire main
                         by a fire hose.
                       • Condition of stowage container in
                         good order.
                       • Validity of foam making liquid: four
                         years
                         (impossible to extend by sampling)
Fire Fighting Appliances
  Item                        Check points

• Foam type fire              • Visual condition in good
  extinguisher of 45 /135       order,without wastage.
  liters capacity or          • Easily usable condition.
  equivalent in firing        • Validity of the medium
  space of boiler and in        Foam : one year
  spaces of fuel oil system     dry powder : five years
                                CO2 : measure at Class
                                        SS and IS
Fire Fighting Appliances
   Item                        Check points
• Fixed fire extinguishing •   CO2 or Halon cylinders to be level/
  arrangement in E/R,          weight measured at Class SS and
                               IS.
  cargo spaces and cargo
                           •   Proper test certificate on board.
  pump room*
                           •   Validity of foam liquid (5 years).
• (CO2 or Halon, foam,
• water spray)                 After 5 years, effectiveness of
                               foam liquid to be checked, and a
                               sample test certificate
                               available on board.
                           •   Testing the audible alarm for the
                               release of gas (CO2 or Halon)
Fire Fighting Appliances
  Item                     Check points

• Fire detection        • Regular checking of
                          the detection system
                          and fire alarm.
Fire Fighting Appliances
    Item                      Check points
• Fuel oil tank shut-off      • All valves to be closed by
  valves;                       remote control from
• Over 500L: ships built on     outside of E/R.
   and after 1 July 1995        Satisfactory operation of
• Over 1000L: ships built       valves.
   before 1 July 1995         • In case that shut-off
                                valves are operated by
                                air, the air cylinder is
                                always charged with
                                correct pressure.
                              • Pressure gauge in good
                                condition.
Fire Fighting Appliances
  Item                     Check points

• Emergency stop of       • Satisfactory operation
  fans                      of emergency stop.
• and fuel oil pumps in
• Engine room
Fire Fighting Appliances
  Item                     Check points

• Means of isolating the   • Satisfactory operation
• fuel supply to             of means to isolate
• individual engines         the fuel supply
Fire Fighting Appliances
      Item                         Check points
•   Fireman‘s •   Two(2) sets for cargo ships / Four(4) sets for tankers
    outfit    •   Stowage condition in good order according to the fire
                  control plan.
              •   Protective clothing, boots and gloves, helmet,electric
                  safety lamp, axe. Easily usable condition.
              •   Breathing apparatus with a smoke helmet or smoke
                  mask and air pump, with proper length of air hose, or
                  a self-contained breathing apparatus.
              •   200 % spare air cylinders available on board or 100 %
                  +
                  Air compressor.
              •   A fireproof lifeline of sufficient length for each
                  breathing
                  apparatus with a snap hook.
              •   Storage position is clearly marked.
Fire Fighting Appliances
  Item                     Check points

• Fire extinguishing • Fire fighting system in good
  arrangement in       order.
  paint lockers      • (Type of arrangement is in
                       accordance with the
                       requirements of the flag
                       state. e.g. portable
                       fire extinguisher is
                       acceptable for ships flying
                       flag of Panama, Japan, etc.
Fire Fighting Appliances
  Item                      Check points

• International   • At least one (1) shore
   shore            connection with standard
   connection       flange dimensions available
                    on board.
                  • Four sets of bolts and nuts,
                    each of 16 ㎜ in diameter,
                    50 ㎜ in length available on
                    board.
                  • One gasket packing available
                    on board.
Fire Fighting Appliances
  Item                    Check points

• Inert gas system   • Operates satisfactorily.
                     • Alarms in the control
                       panel function properly.
Machinery in engine room
  Item          Check Points

• Main engines • Operate satisfactorily.
               • Safety devices function
                 properly.
               • Remote control functions
                 properly.
               • No leakage of oil / water
               • Jacketed High Press. FO pipes
                 in good order
               • FO leak alarm in good order
Machinery in engine room
  Item            Check Points

• Generator        • Operate satisfactorily.
  engines          • Safety devices function
                     properly.
                   • Remote and automatic
                     control functions properly.
                   • No leakage of oil / water
                   • Jacketed High Press. FO
                     pipes in good order
                   • FO leak alarm in good order
Machinery in engine room
  Item          Check Points

• Boilers    • Operate satisfactorily.
             • Safety devices function properly.
             • Remote and automatic control
               function
             • properly.
             • Pressure gauges in good order,
               and calibration is made every
               year.
             • No leakage of steam / water / oil.
             • Water level gauges in good order.
Machinery in engine room
  Item         Check Points

• Stern Tube Seal      • No leakage of oil /
                         Sea water
Machinery in engine room
  Item            Check Points

• Essential      • Operate satisfactorily.
  machinery      • Safety devices function
                   properly.
                 • Remote and automatic control
                   function properly.
                 • No leakage from pump grand
                 • Meters and gauges in good
                   order.
Machinery in engine room
  Item         Check Points

• Piping      • No heavy corrosion or leakage.
              • No soft patches / doublers /
                cement box
              • All valves operate satisfactorily.
Machinery in engine room
  Item              Check Points

• Bilge lines          • Bilge pumps, pipings
                         in good order.
                       • Emerg. Bilge suction Valve
                          operate satisfactorily
Machinery in engine room
  Item          Check Points
• Overall of  •   Cleanliness of E/R
  Engine Room     Must be clean without rubbish or waste oil.
              •   Guards and fencing
                  Protection covers and/or guards
              •   All Meters and Gauges
              •   Self-closing device for sounding pipe of FO
                  Tank
              •   Means to prevent oil spay provided on flange
                  / joint in oil piping
              •   Insulation for all surfaces of machinery with
                  high temp. above 220 deg. C
Machinery in engine room
  Item         Check Points

• Automatic Control   •   Engine Telegraph
  System              •   Alarm printer (UMS)
                      •   Engine Console
                      •   Extension alarm (UMS)
                      •   M/E operation from
                          Bridge
Electrical system
   Item                        Check Points
• Lighting in E/R           • All lights in good
                              order.
                            • Protection covers or
                              guards in good order.
Electrical system
   Item                 Check Points
• Lighting in        • All lights in good
  accommodation        order.
  spaces             • Protection covers or
                       guards in good order.
Electrical system
   Item                    Check Points
• Lighting in control      • All lights in good
• station, working room,     order.
• steering room and        • Protection covers or
  other                      guards in good order.
• spaces
Electrical system
   Item                  Check Points
• Emergency cables    • Condition in good
                        order.
                      • No exposed wire,
                        heavy corrosion,
                        especially
                      • on weather deck.
Electrical system
   Item                   Check Points
• Emergency lights     • All lights in good
                         order without
                         damage.
Electrical system
   Item                   Check Points
• Anti-explosion lights   • All lights in good
  in                        order.
• dangerous spaces,       • No broken covers and
• pump room, battery        guards.
• room, paint locker etc. • Tightening handles
                            available on board.
Electrical system
   Item                   Check Points
• Insulating mats   • Insulating mats available
  around MSB          on board or insulation
                      cement permanently laid
                      up on the floor.
Electrical system
   Item                    Check Points
• Insulation resistance   • No alarm of low
                            insulation
Electrical system
   Item                     Check Points
• Penetration in fire    • Filling material in
  resisting divisions      good order
                         • (no clearance)
Mooring arrangements
 Item                Check points

• Anchor & chain   • Condition in good order, no
  cables             heavy wastage, missing
                     components or damage.
                   • Stowage condition in good
                     order.
Mooring arrangements
 Item               Check points

• Windlass       • Winches in good condition.
                 • Brake bands in good
                   condition, no abnormal
                   wear.
                 • Foundations, grating plates
                   in good condition,
                   no wastage, missing or
                   broken sections.
Mooring arrangements
 Item              Check points

• Mooring      • Winches in good condition.
  system       • Brake bands in good
                 condition, no abnormal wear.
               • Foundations, grating plates in
                 good condition, no wastage,
                 missing or broken sections.
               • Sufficient ropes available on
                 board and in good condition.
               • Capstans operate
                 satisfactorily.
Docking Survey


01 Shell plating including keel plates, stem and
  stern frame(s)
 02 Rudder(s) : Measurement Rudder Clearance
 03 Sea inlets and overboard discharges and their
  valves below
    freeboard deck
 04 Sealing devices for stern tube and shaft
  bracket bearing
Docking Survey


05 After end of stern tube : Measurement Tail
  Shaft Clearance
06 Propeller(s)
07 Valves and cocks on shell plating, sea chests
   and distance pieces
08 Anchors, anchor chain cables, ropes, hawse
   pipes, chain lockers and chain stoppers
Propeller Shaft Survey


01 Connection part with propeller (including
  examination of shaft by efficient crack detection
02 Propeller shaft except connection part with
  propeller
03 Stern tube bearing
04 Bearing wear down
05 Shaft bearing clearance
06 Open-up examination of sealing devices
Propeller Shaft Survey

07 Propeller boss bore in way of shaft taper
  section
08 Controllable Pitch Propeller (CPP)
09 Water lubrication line
10 Oil lubrication line including alarms,
   temperature measuring devices, L.O. pumps
11 Lubrication oil record book
The End

Más contenido relacionado

La actualidad más candente (20)

Ship Construction by Jayan Pillai
Ship Construction by Jayan PillaiShip Construction by Jayan Pillai
Ship Construction by Jayan Pillai
 
Classification society
Classification societyClassification society
Classification society
 
ISM Code
ISM CodeISM Code
ISM Code
 
Parts of a ship1
Parts of a ship1Parts of a ship1
Parts of a ship1
 
Ship Rudders
Ship RuddersShip Rudders
Ship Rudders
 
Ship Construction- Bulkhead
Ship Construction- BulkheadShip Construction- Bulkhead
Ship Construction- Bulkhead
 
Classification societes. presentation mariner
Classification societes. presentation marinerClassification societes. presentation mariner
Classification societes. presentation mariner
 
Safety officer on ship
Safety officer on shipSafety officer on ship
Safety officer on ship
 
Ship’s types
Ship’s typesShip’s types
Ship’s types
 
Ballast Water Treatment Systems
Ballast Water Treatment SystemsBallast Water Treatment Systems
Ballast Water Treatment Systems
 
Structural members of ship
Structural members of shipStructural members of ship
Structural members of ship
 
MARİTİME CONVECTİON
MARİTİME CONVECTİONMARİTİME CONVECTİON
MARİTİME CONVECTİON
 
Personal safety on deck
Personal safety on deckPersonal safety on deck
Personal safety on deck
 
MARPOL .pptx
MARPOL .pptxMARPOL .pptx
MARPOL .pptx
 
Bilge management
Bilge managementBilge management
Bilge management
 
Ism curso conocimientos generales 2 construcción
Ism curso conocimientos generales 2 construcciónIsm curso conocimientos generales 2 construcción
Ism curso conocimientos generales 2 construcción
 
Cargo Securing Manual
Cargo Securing ManualCargo Securing Manual
Cargo Securing Manual
 
Classification societes. presentation
Classification societes. presentationClassification societes. presentation
Classification societes. presentation
 
Ship Construction- Ship Dimensions
Ship Construction- Ship DimensionsShip Construction- Ship Dimensions
Ship Construction- Ship Dimensions
 
2 classification societies
2 classification societies2 classification societies
2 classification societies
 

Destacado

Ship dry docking
Ship dry dockingShip dry docking
Ship dry dockingJishnu Saji
 
Parts of a Ship Engine
Parts of a Ship Engine Parts of a Ship Engine
Parts of a Ship Engine BernardTapia
 
Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)Marine Study
 
Ship´s dimension & types of ships
Ship´s dimension & types of shipsShip´s dimension & types of ships
Ship´s dimension & types of shipsAdrian Urbina
 
Marine piping systems
Marine piping systemsMarine piping systems
Marine piping systemskmsu
 
Auxiliary machinery
Auxiliary machineryAuxiliary machinery
Auxiliary machineryUMCadets
 
Ship stresses
Ship stresses Ship stresses
Ship stresses Rishi Vrmn
 
Lesson 1 Ship Characteristics
Lesson 1 Ship CharacteristicsLesson 1 Ship Characteristics
Lesson 1 Ship CharacteristicsGuilherme Azevedo
 
1 introduction to shipping and marine engineering
1 introduction to shipping and marine engineering1 introduction to shipping and marine engineering
1 introduction to shipping and marine engineeringOlanrewaju O Sulaiman
 
Watch keeping duties , responsibilities and cargo documentation
Watch keeping duties ,  responsibilities and cargo documentationWatch keeping duties ,  responsibilities and cargo documentation
Watch keeping duties , responsibilities and cargo documentationOladokun Sulaiman Olanrewaju
 
Ship handling basics
Ship handling basicsShip handling basics
Ship handling basicsmoney2j
 
Draft survey calculation_sheet_2010.1
Draft survey calculation_sheet_2010.1Draft survey calculation_sheet_2010.1
Draft survey calculation_sheet_2010.1Paulo Ricardo
 
Lesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike SeamanshipLesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike SeamanshipGuilherme Azevedo
 

Destacado (20)

Ship dry docking
Ship dry dockingShip dry docking
Ship dry docking
 
Parts of a ship
Parts of a shipParts of a ship
Parts of a ship
 
Parts of a Ship Engine
Parts of a Ship Engine Parts of a Ship Engine
Parts of a Ship Engine
 
Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)
 
6 ship org chart
6 ship org chart6 ship org chart
6 ship org chart
 
Ship´s dimension & types of ships
Ship´s dimension & types of shipsShip´s dimension & types of ships
Ship´s dimension & types of ships
 
Marine piping systems
Marine piping systemsMarine piping systems
Marine piping systems
 
Ship handling
Ship handlingShip handling
Ship handling
 
Maritime terms
Maritime termsMaritime terms
Maritime terms
 
Auxiliary machinery
Auxiliary machineryAuxiliary machinery
Auxiliary machinery
 
Ship stresses
Ship stresses Ship stresses
Ship stresses
 
Pipe Fittings and Valves for Marine Use
Pipe Fittings and Valves for Marine UsePipe Fittings and Valves for Marine Use
Pipe Fittings and Valves for Marine Use
 
Distress signals lrg
Distress signals lrgDistress signals lrg
Distress signals lrg
 
Lesson 1 Ship Characteristics
Lesson 1 Ship CharacteristicsLesson 1 Ship Characteristics
Lesson 1 Ship Characteristics
 
1 introduction to shipping and marine engineering
1 introduction to shipping and marine engineering1 introduction to shipping and marine engineering
1 introduction to shipping and marine engineering
 
Stability of ships
Stability of shipsStability of ships
Stability of ships
 
Watch keeping duties , responsibilities and cargo documentation
Watch keeping duties ,  responsibilities and cargo documentationWatch keeping duties ,  responsibilities and cargo documentation
Watch keeping duties , responsibilities and cargo documentation
 
Ship handling basics
Ship handling basicsShip handling basics
Ship handling basics
 
Draft survey calculation_sheet_2010.1
Draft survey calculation_sheet_2010.1Draft survey calculation_sheet_2010.1
Draft survey calculation_sheet_2010.1
 
Lesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike SeamanshipLesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike Seamanship
 

Similar a Ship survey presentation

Rbi presentation inventure technologies
Rbi presentation inventure technologiesRbi presentation inventure technologies
Rbi presentation inventure technologiesRindert Algra
 
FW Tank Cleaning (1).pptx
FW Tank Cleaning (1).pptxFW Tank Cleaning (1).pptx
FW Tank Cleaning (1).pptxAnubhav Soni
 
Chris brooks storage tanks inspection, maintenance and failure
Chris brooks   storage tanks inspection, maintenance and failureChris brooks   storage tanks inspection, maintenance and failure
Chris brooks storage tanks inspection, maintenance and failureSreekumar K S
 
Maintenance Aspects of Owning your own aircraft. FAA P-8740-15
Maintenance Aspects of Owning your own aircraft. FAA P-8740-15Maintenance Aspects of Owning your own aircraft. FAA P-8740-15
Maintenance Aspects of Owning your own aircraft. FAA P-8740-15FAA Safety Team Central Florida
 
003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptx003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptxNeethu241454
 
Cswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursCswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursRafik Guerbous
 
Construction Presentation Slideshow
Construction Presentation SlideshowConstruction Presentation Slideshow
Construction Presentation Slideshowfgovers
 
Waste Management: Norms & Standards
Waste Management: Norms & StandardsWaste Management: Norms & Standards
Waste Management: Norms & StandardsSAMBRA_RMI
 
Ultra tech end user training 10 6-11-spill response only
Ultra tech end user training 10 6-11-spill response onlyUltra tech end user training 10 6-11-spill response only
Ultra tech end user training 10 6-11-spill response onlyMario Cruz
 
What should i expect from a marine survey
What should i expect from  a marine surveyWhat should i expect from  a marine survey
What should i expect from a marine surveyDonald Mccann
 
Tank brochure 2016-1
Tank brochure 2016-1Tank brochure 2016-1
Tank brochure 2016-1David Dakers
 
FABRICATION_OF_OFFSHORE_PLATFORM.pdf
FABRICATION_OF_OFFSHORE_PLATFORM.pdfFABRICATION_OF_OFFSHORE_PLATFORM.pdf
FABRICATION_OF_OFFSHORE_PLATFORM.pdfribby1
 

Similar a Ship survey presentation (20)

Rbi presentation inventure technologies
Rbi presentation inventure technologiesRbi presentation inventure technologies
Rbi presentation inventure technologies
 
343312365 mt-ppt
343312365 mt-ppt343312365 mt-ppt
343312365 mt-ppt
 
Packers GFK
Packers GFKPackers GFK
Packers GFK
 
FW Tank Cleaning (1).pptx
FW Tank Cleaning (1).pptxFW Tank Cleaning (1).pptx
FW Tank Cleaning (1).pptx
 
Chris brooks storage tanks inspection, maintenance and failure
Chris brooks   storage tanks inspection, maintenance and failureChris brooks   storage tanks inspection, maintenance and failure
Chris brooks storage tanks inspection, maintenance and failure
 
Nagarajan Saravanan
Nagarajan SaravananNagarajan Saravanan
Nagarajan Saravanan
 
Maintenance Aspects of Owning your own aircraft. FAA P-8740-15
Maintenance Aspects of Owning your own aircraft. FAA P-8740-15Maintenance Aspects of Owning your own aircraft. FAA P-8740-15
Maintenance Aspects of Owning your own aircraft. FAA P-8740-15
 
003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptx003_TANK - Inspection & Maintenance.pptx
003_TANK - Inspection & Maintenance.pptx
 
Standards
StandardsStandards
Standards
 
Cswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 coursCswip 11-01 - plant inspection- Week 2 cours
Cswip 11-01 - plant inspection- Week 2 cours
 
TANK 13042023.pptx
TANK 13042023.pptxTANK 13042023.pptx
TANK 13042023.pptx
 
Construction Presentation Slideshow
Construction Presentation SlideshowConstruction Presentation Slideshow
Construction Presentation Slideshow
 
FAISALRESUME
FAISALRESUMEFAISALRESUME
FAISALRESUME
 
Waste Management: Norms & Standards
Waste Management: Norms & StandardsWaste Management: Norms & Standards
Waste Management: Norms & Standards
 
Ultra tech end user training 10 6-11-spill response only
Ultra tech end user training 10 6-11-spill response onlyUltra tech end user training 10 6-11-spill response only
Ultra tech end user training 10 6-11-spill response only
 
What should i expect from a marine survey
What should i expect from  a marine surveyWhat should i expect from  a marine survey
What should i expect from a marine survey
 
Tank brochure 2016-1
Tank brochure 2016-1Tank brochure 2016-1
Tank brochure 2016-1
 
FABRICATION_OF_OFFSHORE_PLATFORM.pdf
FABRICATION_OF_OFFSHORE_PLATFORM.pdfFABRICATION_OF_OFFSHORE_PLATFORM.pdf
FABRICATION_OF_OFFSHORE_PLATFORM.pdf
 
Riser Design Overview
Riser Design  OverviewRiser Design  Overview
Riser Design Overview
 
Targeted assessment program update Greg Connolly
Targeted assessment program update Greg ConnollyTargeted assessment program update Greg Connolly
Targeted assessment program update Greg Connolly
 

Último

Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandSharisaBethune
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 

Último (20)

Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal Brand
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 

Ship survey presentation

  • 2.
  • 3.
  • 4.
  • 5. SHIP’S SURVEY & GOOD MAINTENANCE ON BOARD NIPPON KAIJI KYOKAI (ClassNK)
  • 6. Introduction to ClassNK Nippon Kaiji Kyokai, known as ClassNK or NK, is a ship classification society. It is what is known under Japanese law as a public service foundation and in its Act of Endowment, its ultimate goal is expressed as: "to contribute to the development of maritime service for the protection of human life and property at sea". Environmental protection has also become an increasingly major concern.
  • 7. Presented by • Lcdr. Prayudh Thongdii Surveyor
  • 8. Periodical surveys • 2.1 General • 2.2 Annual Surveys • 2.3 Intermediate Surveys • 2.4 Special Surveys • 2.5 Docking Surveys • 2.6 Boiler Survey (Skip) • 2.6 Propeller Shaft Survey
  • 14.
  • 19. Annual Surveys 1 The purpose of an Annual Survey is to confirm that the general condition of the hull is maintained at a satisfactory level. 2 Generally as the ship ages, ballast tanks are required to be subjected to more extensive overall and close-up surveys at Annual Surveys.
  • 20. Intermediate Surveys 1 The Intermediate Survey may be held at or between the second or third Annual Survey in each five year Special Survey cycle. Those items, which are additional to the requirements of the Annual Surveys, may be surveyed either at or between the 2nd and 3rd Annual Survey. The intermediate survey contains requirements for extended overall and close-up surveys including thickness measurements of cargo and ballast tanks.
  • 21. Special Surveys 1 The Special Surveys are carried out at five-year intervals for the purpose of establishing the condition of the structure to confirm that the structural integrity is satisfactory in accordance with the Classification Requirements, and will remain fit for its intended purpose for another five-year period, subject to proper maintenance and operation of the ship and to periodical surveys carried out at the due dates. 2 The Special Survey concentrates on close-up surveys in association with thickness measurements and is aimed at detecting fractures, buckling, corrosion and other types of structural deterioration. 3 Thickness measurements are to be carried out upon agreement with the Classification Society concerned in conjunction with the Special Survey.
  • 22. Drydocking (Bottom) Surveys The objective of docking the ship periodically is to inspect the portion of the hull beneath the water-line which those parts of the hull under the water-line are always immersed in water; therefore, the condition of damage in the event of the ship stranding / grounding/damages cannot be observed.
  • 24. Check lists • Hull & Machinery • Fire fighting appliances • Machinery in engine room • Electrical Equipment • Mooring arrangements • Docking Survey • Propeller Shaft Survey
  • 25. Class Survey General Examinations (Hull) 01 Shell plating above W.L. 02 Weather deck plating 03 Openings on deck and outside of hull, deck house, companionway, hatch coamings and covers, side ports, cargo ports and side scuttles 04 Exposed engine casing and skylights 05 Ventilators 06 Air pipes and sounding pipes 07 W. T. bulkheads and superstructure's end bulkheads including W. T. doors, penetrations, Stop valves and door openings
  • 26. Hull 08 Load line marks 09 Bulwarks, guard rails and freeing ports 10 Means of access ; gangways, walkways and life lines 11 Scuppers, inlets, other discharge pipes and valves 12 Anchoring and mooring arrangement 13 Fire extinguishing arrangement 14 Fire protection and means of escape, etc. 15 Loading computer 16 Ship Identification Number
  • 27. Performance Test (Hull) 01 Doors on watertight bulkheads 02 Drainage, mooring and anchoring arrangements and their accessories 03 Appliances related to fire protection and escape 04 Fire detection and fire alarm system including manually operated call points 05 Fire pump including emergency fire pump, piping, hydrants, hoses, nozzles, etc. 06 Ventilation system fan 07 Fixed dry-chemical powder fire fighting system 08 Water spray system 09 Quantity of Carbon dioxide extinguishing medium 10 Quantity of halon extinguishing medium
  • 28. Hull • 11 Quantity of dry chemical powder extinguishing medium • 12 Fixed carbon dioxide fire fighting system (Piping and alarm of systems) • 13 Fixed halon fire fighting system (Piping and alarm of systems) • 14 Fixed foam fire fighting system (Piping) • 15 Fixed high expansion foam fire fighting system (Piping)
  • 29. Hull • 16 Fixed pressure water spraying fire fighting system (System and pump of the system) • 17 Automatic sprinkler system (Delivery alarm and pump) • 18 Closing appliances of openings related to fire fighting in way of cargo holds
  • 30. Machinery • General Examinations 01 Main propulsion machinery, power transmission machinery, shafting system,prime movers other than main propulsion machinery, boilers, thermal oil heaters,incinerators, pressure vessels, auxiliary machinery, piping systems, control systems,electrical installations and switchboards 02 Engine room, boiler spaces and means of escape 03 Refrigerating machinery except "RMC“ •
  • 31. Machinery • Performance Tests 01 Shut-off devices for oil tanks 02 Emergency shut-down of motor for F.O. pumps, cargo oil pumps, ventilating fans& boiler draught fans 03 Emergency electrical power source 04 Communication system with Engineer's alarm 05 Steering gears ( including control system ) 06 Bilge system 07 Safety devices or alarm devices of main propulsion machinery and auxiliary machinery 08 Safety devices or alarm devices of boilers, thermal oil heaters and incinerators 09 Monitoring devices, such as pressure indicators, thermometers etc.
  • 33. Hull & Machinery Items Check Points • Freeboard marks • Clearly marked on shell plating each side.
  • 34. Hull & Machinery Items Check Points • Superstructure end • No heavy wastage bulkhead exceeding permissible limit.
  • 35. Hull & Machinery Items Check Points • Doors of all access • Effective openings in bulkhead weathertightness. at ends of enclosed • No heavy corrosion, superstructures. holes. • Condition of gaskets and clamping devices in good order.
  • 36. Hull & Machinery Items Check Points • Access hatches • Effective weathertightness. • Hatch coamings in good condition without heavy wastage or holes. • Condition of gaskets and clamping devices in good order.
  • 37. Hull & Machinery Items Check Points • Cargo • Effective weathertightness. hatches • Hatch coamings and stays in good condition without heavy wastage or holes. • Hatch covers in good condition without heavy wastage or holes. • Condition of gaskets and clamping devices in good order. • Battens and wedges available on board in good order. • Tarpaulins in good condition without holes.
  • 38. Hull & Machinery Items Check Points • Machinery space • Effective weathertightness. openings • Covers, casings and coamings in good condition without heavy wastage or holes
  • 39. Hull & Machinery Items Check Points • Manholes, • Effective weathertightness. flush scuttles • Covers and bolts in good condition without heavy wastage.
  • 40. Hull & Machinery Items Check Points • Deckhouses, • Effective weathertightness. companionways • Bulkhead plating in good with openings in condition without heavy freeboard deck corrosion or holes. • Doors in good condition without heavy • corrosion or holes. • Gaskets and clamping devices in good order.
  • 41. Hull & Machinery Items Check Points • Ventilators • Coamings in good condition without heavy corrosion, holes. • Closing covers in good condition, efficient weathertightness. • Gaskets, clamping devices in order.
  • 42. Hull & Machinery Items Check Points • Air • Coamings in good condition pipes without heavy corrosion or holes. • Air pipe heads in good condition without heavy corrosion or holes. • Floats in pipe heads in good order. • Wire gauzes in good condition. (for oil tanks only)
  • 43. Hull & Machinery Items Check Points • Cargo ports • Effective weathertightness. and similar • Steel plating and attachments openings in good condition without heavy wastage.
  • 44. Hull & Machinery Items Check Points • Scuppers, inlets, • Distance pieces in good discharges condition without heavy corrosion or holes. • Non-return valves in good order without heavy corrosion or holes.
  • 45. Hull & Machinery Items Check Points • Side scuttles • Effective watertightness. • Deadlights in good order.
  • 46. Hull & Machinery Items Check Points • Freeing ports • Draining arrangements in good order.
  • 47. Hull & Machinery Items Check Points • Bulwarks and stays, • Condition in good order guard rails without heavy corrosion, holes or cracks.
  • 48. Hull & Machinery Items Check Points • Life lines, • Condition in good order gangways, without heavy corrosion, passages missing components or holes.
  • 49. Hull & Machinery Items Check Points • Uprights, lashings • Sockets, eye plates, stanchions in good • condition without heavy corrosion, holes or • cracks.
  • 50. Hull & Machinery Items Check Points • Main deck plating • Condition in good order. • Cross deck plating • No heavy wastage, corrosion, cracks.
  • 51. Hull & Machinery Items Check Points • F‘cle deck plating, • Condition in good order. • Poop deck plating • No heavy wastage, corrosion, cracks.
  • 52. Hull & Machinery Items Check Points • All piping on deck • Condition in good order. with valves • No heavy wastage, corrosion, cracks.
  • 53. Hull & Machinery Items Check Points • Electric cable • Condition in good order. conduit • No heavy wastage, corrosion, cracks.
  • 54. Hull & Machinery Items Check Points • Cargo holds • Bulkheads, frames, tanktop plating in good condition. • No heavy corrosion, wastage, holes or cracks. • Access ladders, piping in good condition. • No heavy wastage, holes.
  • 55. Hull & Machinery Items Check Points • Ballast • No leakage, damage. tanks • Bulkheads (trans/longl.), longitudinals, transverse rings, horizontal girders, other members in good condition. No heavy corrosion, wastage, holes or cracks. • Access ladders, piping in good condition. No heavy wastage, holes
  • 56. Hull & Machinery Items Check Points • Cargo • No leakage, damage. tanks • Bulkheads (trans/longl.), longitudinals, transverse rings, horizontal girders, other members in good condition. No heavy corrosion, wastage, holes or cracks. • Access ladders, piping in good condition. No heavy wastage, holes
  • 57. Hull & Machinery Items Check Points • Fuel oil • No leakage, damage. tanks • Bulkheads (trans/longl.), longitudinals, transverse rings, horizontal girders, other members in good condition. No heavy corrosion, wastage, holes or cracks. • Access ladders, piping in good condition. No heavy wastage, holes
  • 58. Hull & Machinery Items Check Points • Other compartments • Bulkheads (trans/longl.), (Bos‘n store, deck longitudinals, transverse stores, etc.) rings, horizontal girders, other members in good condition. No heavy corrosion, wastage, holes or cracks.
  • 59. Hull & Machinery Items Check Points • Pump • Bulkheads, longitudinals, web frames, other members in good condition. No heavy room corrosion, wastage, holes or cracks. • Access ladders, piping in good condition. • No heavy wastage, holes. • Particular care to be taken to ensure electrical equipment in good order, lights (explosion proof). • Protection of cargo pump room (bilge alarm, gas monitoring system, temperature sensor, inter-lock system) working satisfactorily
  • 60. Hull & Machinery Items Check Points • Water ingress alarm • Working satisfactorily • system
  • 61. Hull & Machinery Items Check Points • Remote pump control • Working satisfactorily system (F.P.T, Bos’n store) (for Bulk Carrier)
  • 62. Hull & Machinery Items Check Points • High velocity P/V • Working satisfactorily • valve • No sticking/clogging by solidifying • substances
  • 63. Fire Fighting Appliances Item Check points • Fire integrity • Insulation on “A” class bulkheads and decks ingood condition. • Penetrations of ventilation ducts cable • penetration and pipes through “A” class bulk • heads and decks in good order.
  • 64. Fire Fighting Appliances Item Check points • Fire doors • Operate satisfactorily. • Self-closing doors not to be fitted with hold-back hooks. • Skylights • Closing arrangements in good order • Skylights to be of steel and not contain glass panels.
  • 65. Fire Fighting Appliances Item Check points • Fire dampers • Operate satisfactorily. • Cargo holds • Engine room • Accommodation spaces • Control stations • Other spaces • Clear marking of “Close- Open”. • No hole / defection of dampers
  • 66. Fire Fighting Appliances Item Check points • Main fire pumps • Operate satisfactorily. • Proper pressure maintained. • Pressure gauges in good order
  • 67. Fire Fighting Appliances Item Check points • Emergency fire pump • Operates satisfactorily. • Proper pressure maintained. • Pressure gauges in good order • Prime mover in good condition. • Exhaust gas piping in good order.
  • 68. Fire Fighting Appliances Item Check points • Fire main piping • No leakage, heavy wastage in lines • No doublers, clamps, • soft patches in lines • Isolation valves • Operate satisfactorily.
  • 69. Fire Fighting Appliances Item Check points • Hydrants • Fire hoses easily coupled to hydrants • Satisfactory operation of valves. • Valve handles not broken
  • 70. Fire Fighting Appliances Item Check points • Fire hoses • All hoses in good condition, without leakage. • Checking the number of hoses acc. to the fire • control plan • Complete with nozzle and couplings
  • 71. Fire Fighting Appliances Item Check points • Nozzles • All nozzles in good condition, without leakage. • Jet type nozzles, and jet/spray dual type in engine room. • Operation of easy change mode. • Operation of easy change mode and shut-off devices.
  • 72. Fire Fighting Appliances Item Check points • Portable fire • Checking the number of portable fire extinguishers extinguishers of each type according to the fire foam, • control plan. dry power • Cylinders in good condition, CO2) without serious corrosion / damage. • Validity of the medium foam : one year dry powder : five year CO2 : measure at Class SS and IS
  • 73. Fire Fighting Appliances Item Check points • Portable foam • Checking the air-foam nozzle, • applicator unit portable tank of foam making liquid, and one spare tank. Testing the connection to fire main by a fire hose. • Condition of stowage container in good order. • Validity of foam making liquid: four years (impossible to extend by sampling)
  • 74. Fire Fighting Appliances Item Check points • Foam type fire • Visual condition in good extinguisher of 45 /135 order,without wastage. liters capacity or • Easily usable condition. equivalent in firing • Validity of the medium space of boiler and in Foam : one year spaces of fuel oil system dry powder : five years CO2 : measure at Class SS and IS
  • 75. Fire Fighting Appliances Item Check points • Fixed fire extinguishing • CO2 or Halon cylinders to be level/ arrangement in E/R, weight measured at Class SS and IS. cargo spaces and cargo • Proper test certificate on board. pump room* • Validity of foam liquid (5 years). • (CO2 or Halon, foam, • water spray) After 5 years, effectiveness of foam liquid to be checked, and a sample test certificate available on board. • Testing the audible alarm for the release of gas (CO2 or Halon)
  • 76. Fire Fighting Appliances Item Check points • Fire detection • Regular checking of the detection system and fire alarm.
  • 77. Fire Fighting Appliances Item Check points • Fuel oil tank shut-off • All valves to be closed by valves; remote control from • Over 500L: ships built on outside of E/R. and after 1 July 1995 Satisfactory operation of • Over 1000L: ships built valves. before 1 July 1995 • In case that shut-off valves are operated by air, the air cylinder is always charged with correct pressure. • Pressure gauge in good condition.
  • 78. Fire Fighting Appliances Item Check points • Emergency stop of • Satisfactory operation fans of emergency stop. • and fuel oil pumps in • Engine room
  • 79. Fire Fighting Appliances Item Check points • Means of isolating the • Satisfactory operation • fuel supply to of means to isolate • individual engines the fuel supply
  • 80. Fire Fighting Appliances Item Check points • Fireman‘s • Two(2) sets for cargo ships / Four(4) sets for tankers outfit • Stowage condition in good order according to the fire control plan. • Protective clothing, boots and gloves, helmet,electric safety lamp, axe. Easily usable condition. • Breathing apparatus with a smoke helmet or smoke mask and air pump, with proper length of air hose, or a self-contained breathing apparatus. • 200 % spare air cylinders available on board or 100 % + Air compressor. • A fireproof lifeline of sufficient length for each breathing apparatus with a snap hook. • Storage position is clearly marked.
  • 81. Fire Fighting Appliances Item Check points • Fire extinguishing • Fire fighting system in good arrangement in order. paint lockers • (Type of arrangement is in accordance with the requirements of the flag state. e.g. portable fire extinguisher is acceptable for ships flying flag of Panama, Japan, etc.
  • 82. Fire Fighting Appliances Item Check points • International • At least one (1) shore shore connection with standard connection flange dimensions available on board. • Four sets of bolts and nuts, each of 16 ㎜ in diameter, 50 ㎜ in length available on board. • One gasket packing available on board.
  • 83. Fire Fighting Appliances Item Check points • Inert gas system • Operates satisfactorily. • Alarms in the control panel function properly.
  • 84. Machinery in engine room Item Check Points • Main engines • Operate satisfactorily. • Safety devices function properly. • Remote control functions properly. • No leakage of oil / water • Jacketed High Press. FO pipes in good order • FO leak alarm in good order
  • 85. Machinery in engine room Item Check Points • Generator • Operate satisfactorily. engines • Safety devices function properly. • Remote and automatic control functions properly. • No leakage of oil / water • Jacketed High Press. FO pipes in good order • FO leak alarm in good order
  • 86. Machinery in engine room Item Check Points • Boilers • Operate satisfactorily. • Safety devices function properly. • Remote and automatic control function • properly. • Pressure gauges in good order, and calibration is made every year. • No leakage of steam / water / oil. • Water level gauges in good order.
  • 87. Machinery in engine room Item Check Points • Stern Tube Seal • No leakage of oil / Sea water
  • 88. Machinery in engine room Item Check Points • Essential • Operate satisfactorily. machinery • Safety devices function properly. • Remote and automatic control function properly. • No leakage from pump grand • Meters and gauges in good order.
  • 89. Machinery in engine room Item Check Points • Piping • No heavy corrosion or leakage. • No soft patches / doublers / cement box • All valves operate satisfactorily.
  • 90. Machinery in engine room Item Check Points • Bilge lines • Bilge pumps, pipings in good order. • Emerg. Bilge suction Valve operate satisfactorily
  • 91. Machinery in engine room Item Check Points • Overall of • Cleanliness of E/R Engine Room Must be clean without rubbish or waste oil. • Guards and fencing Protection covers and/or guards • All Meters and Gauges • Self-closing device for sounding pipe of FO Tank • Means to prevent oil spay provided on flange / joint in oil piping • Insulation for all surfaces of machinery with high temp. above 220 deg. C
  • 92. Machinery in engine room Item Check Points • Automatic Control • Engine Telegraph System • Alarm printer (UMS) • Engine Console • Extension alarm (UMS) • M/E operation from Bridge
  • 93. Electrical system Item Check Points • Lighting in E/R • All lights in good order. • Protection covers or guards in good order.
  • 94. Electrical system Item Check Points • Lighting in • All lights in good accommodation order. spaces • Protection covers or guards in good order.
  • 95. Electrical system Item Check Points • Lighting in control • All lights in good • station, working room, order. • steering room and • Protection covers or other guards in good order. • spaces
  • 96. Electrical system Item Check Points • Emergency cables • Condition in good order. • No exposed wire, heavy corrosion, especially • on weather deck.
  • 97. Electrical system Item Check Points • Emergency lights • All lights in good order without damage.
  • 98. Electrical system Item Check Points • Anti-explosion lights • All lights in good in order. • dangerous spaces, • No broken covers and • pump room, battery guards. • room, paint locker etc. • Tightening handles available on board.
  • 99. Electrical system Item Check Points • Insulating mats • Insulating mats available around MSB on board or insulation cement permanently laid up on the floor.
  • 100. Electrical system Item Check Points • Insulation resistance • No alarm of low insulation
  • 101. Electrical system Item Check Points • Penetration in fire • Filling material in resisting divisions good order • (no clearance)
  • 102. Mooring arrangements Item Check points • Anchor & chain • Condition in good order, no cables heavy wastage, missing components or damage. • Stowage condition in good order.
  • 103. Mooring arrangements Item Check points • Windlass • Winches in good condition. • Brake bands in good condition, no abnormal wear. • Foundations, grating plates in good condition, no wastage, missing or broken sections.
  • 104. Mooring arrangements Item Check points • Mooring • Winches in good condition. system • Brake bands in good condition, no abnormal wear. • Foundations, grating plates in good condition, no wastage, missing or broken sections. • Sufficient ropes available on board and in good condition. • Capstans operate satisfactorily.
  • 105. Docking Survey 01 Shell plating including keel plates, stem and stern frame(s) 02 Rudder(s) : Measurement Rudder Clearance 03 Sea inlets and overboard discharges and their valves below freeboard deck 04 Sealing devices for stern tube and shaft bracket bearing
  • 106. Docking Survey 05 After end of stern tube : Measurement Tail Shaft Clearance 06 Propeller(s) 07 Valves and cocks on shell plating, sea chests and distance pieces 08 Anchors, anchor chain cables, ropes, hawse pipes, chain lockers and chain stoppers
  • 107. Propeller Shaft Survey 01 Connection part with propeller (including examination of shaft by efficient crack detection 02 Propeller shaft except connection part with propeller 03 Stern tube bearing 04 Bearing wear down 05 Shaft bearing clearance 06 Open-up examination of sealing devices
  • 108. Propeller Shaft Survey 07 Propeller boss bore in way of shaft taper section 08 Controllable Pitch Propeller (CPP) 09 Water lubrication line 10 Oil lubrication line including alarms, temperature measuring devices, L.O. pumps 11 Lubrication oil record book